East West Rail - Further Critical Works
NETWORK RAIL INFRASTRUCTURE LIMITEDEstimated Value
Up to £650,000,000
Deadline
Not specified
Published
14 October 2026
Type
Not specified
At a glance
- Estimated value
- £650,000,000
- Published
- 14 October 2026
- Location
- London
- Type
- direct procedure
- Contract ends
- 24 November 2036 (expect a re-tender before then)
- Likely incumbent
- Oracle Corporation UK Limited, current contract ends May 2029
- Published on
- Find a Tender
Full Description
The requirement consists of a combination of design services and construction works which are needed to increase the rail network’s operational capacity for progressive delivery of benefits from early 2030s and to support the rail networks’ early operational response to a new theme park which is set to open in 2031.
The indicative high-level scope relating to this transparency notice refers only to the Marston Vale Line between Bletchley and Stewartby, and on the OXD line between Oxford Parkway and Bletchley, and Milton Keynes Central Station design services and works (subject to funding and any other required internal and external approvals):
- Undertaking the design for critical rail systems upgrade and required station packages on the Martson Vale and OXD lines to support a higher capacity railway as far as Stewartby.
- Re-signalling works, track upgrades including double tracking between Bletchley and Fenny Stratford and a new layout at Stewartby, passing loops, electrification, level crossing closures, bridge and underpass works, station works at Winslow, Bletchley and Stewartby, earthworks and drainage resilience.
- Discharge of new planning consents under the EWRco Development Consent Order (DCO) and integration with TWAO conditions and commitments in support of the delivery of the Marston Vale Line Core Works (MVLCW).
- Delivery of enabling works such as site clearance, compound set up, Flood Storage Areas (CFSA), Environmental Compensation Sites (ECS) and utility diversions
- Integration of timetabling modelling between MVLCW and this scope. This includes both service outcomes and temporary arrangements including possession planning.
It is currently anticipated, based on the current information, that the estimated final costs of these works and services will amount to a maximum of £650m (excluding VAT).
This scope of this Transparency Notice does not include several of the final station arrangements on the Martson Vale signalling area, or the option for a train maintenance depot on the OXD lines. The requirements for this will be procured separately. Information on the wider East West Rail project can be found at East West Rail | Project overview.
The in scope design services and works will require significant coordination and integration with the ongoing works currently being delivered by the East West Rail Alliance (EWRA) on the Marston Vale Line, referred to as the Marston Vale Line Core Works (MVLCW). This includes design integration, as well as the management and delivery of the works on the same site, at the same time and, on the same rail systems, therefore Network Rail consider this an extension of existing work.
An overview of the existing MVLCW scope includes
- Multiple level crossing closures and bridge work (including BF01) on the Marston Vale Line
- Signalling and control system alterations associated with level crossing works and associated track works
- Other coordinated bridge works
- Timetable development works
- Options for safety enhancements at stations including tactile edges, extension of existing station lighting, announcement, wayfinding and customer information systems if required
- Resilience infrastructure works including track, drainage and earthworks
Requirements
The indicative high-level scope relating to this transparency notice refers only to the Marston Vale Line between Bletchley and Stewartby, and on the OXD line between Oxford Parkway and Bletchley, and Milton Keynes Central Station design services and works (subject to funding and any other required internal and external approvals):
- Undertaking the design for critical rail systems upgrade and required station packages on the Martson Vale and OXD lines to support a higher capacity railway as far as Stewartby.
- Options for safety enhancements at stations including tactile edges, extension of existing station lighting, announcement, wayfinding and customer information systems if required
Related Links
This scope of this Transparency Notice does not include several of the final station arrangements on the Martson Vale signalling area, or the option for a train maintenance depot on the OXD lines. The requirements for this will be procured separately. Information on the wider East West Rail project can be found at East West Rail | Project overview.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
£650,000,000
Laing O'Rourke Delivery Limited
£650,000,000
VolkerRail Limited
£650,000,000
Recent awards by Network Rail Infrastructure Limited
- Provision of Behavioural Safety Services for Southern Region
Awarded to The HSQE Partnership Ltd, £2,880,000 · October 2026
- Insurance Brokerage Services
Awarded to Willis Ltd, £1,703,654 · October 2026
- project_47554 - #45669 - Conwy Tubes Track Renewal
Awarded to Bottomley Site Services Limited, £700,000 · October 2026
- Wales & Western - Civils Examination Services (Earthworks)
Awarded to A&j ARB Access Limited, £24,000,000 · September 2026
- GSM-R Repeater Last Time Buy
Awarded to PBE Europe Ltd, £1,146,060 · September 2026
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Oracle Corporation UK Limited
£11m
total awarded
- 2
PBE Europe Ltd
£6m
total awarded
- 3
Tended Limited
£5m
total awarded
- 4
Hitachi Energy UK Limited
£6m
total awarded
- 5
Voestalpine Signaling UK Ltd.
2 contracts wonlatest 14 Sept 2026ends 30 Jun 2030£111m
total awarded
Oracle Corporation UK Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterHow to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Network Rail Infrastructure LimitedKey Dates
Published
14 October 2026
Submission deadline
Not specified
Notice type
award
Source
find a tender
Contains public sector information licensed under the Open Government Licence v3.0.
Related Tenders
Commercial Properties Managing Agent services required for c100 properties in central/west London. Services are required for a minimum of 3 years with possible extensions to 5 year
The project would install solar panels on the West Ham shop roof. Works required are: •Install standard solar panels, rather than a membrane. Soft market testing suggested a 99kW -
Chiltern rail - performance, delay & incident management system
Chiltern Rail is seeking to procure a Performance, Delay and Incident Management System to replace its existing Compass solution. The requirement includes the provision, implementa
Provision of community sports equipment & outdoor fitness stations
Westminster City Council is seeking to appoint suppliers for the provision, installation, operation and maintenance of community sport and wellbeing infrastructure across Westminst
