SZC CWA - Pool Bunker Construction
Sizewell C LimitedEstimated Value
£10,000,000 – £20,000,000
Deadline
25 November 2026
Published
19 November 2026
Type
works
At a glance
- Buyer
- Sizewell C Limited
- Estimated value
- £10,000,000 - £20,000,000
- Closing date
- 25 November 2026 (3 days left)
- Published
- 19 November 2026
- Location
- England
- Type
- Works
- CPV code
- 45210000 Building construction work
- Published on
- Contracts Finder
Full Description
The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island.
The scope of works includes
- Primary steel frame and crane runway beams.
- Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope.
- Five-section retractable roof.
- Secondary steelwork platforms, working levels and access arrangements.
- Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls.
- Passenger and goods hoists, stair cores and roof access.
- Installation and commissioning of three free-issued gantry cranes.
- Tented workshop, lightning protection and earthing.
- Testing, commissioning, quality records and formal handover.
The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme.
The key scope deliverables are
- Completed design to RIBA stage 4 and coordinated construction information.
- Approved contractor programme aligned to project milestones.
- Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services.
- Completed health, safety, quality and assurance records.
- Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements.
- Formal handover following operational readiness review.
The timescales are as follows
The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is:
- 40 weeks for the preferred rainscreen and Safe RAD solution.
- 46 weeks for the 275 mm precast fallback solution.
The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.
Site Viewing
The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island.
The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is:
The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterHow to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Useful Resources
Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Buyer Profile
Sizewell C LimitedKey Dates
Published
19 November 2026
Submission deadline
25 November 2026
Notice type
Contract
Source
contracts finder
Contains public sector information licensed under the Open Government Licence v3.0.
Related Tenders
Conversion & commercial fit-out of 90 hermon hill E18 to 105-Place nursery - HW/4699
Happywoods Nursery is seeking an experienced commercial main contractor to undertake the full internal conversion, refurbishment, and fit-out of 90 Hermon Hill, South Woodford, Lon
Gb-loughborough: 060 - radmoor sports hall flooring replacement at loughborough college
Removal and replacement of approximately 600 m2 of existing sprung sports hall flooring at the Radmoor Centre, Radmoor Road, Loughborough LE11 3BT; The works are anticipated during
CA18678 - alburgh with denton fire doors ITT
This tender is for the replacement of fire doors at Alburgh with Denton, including all associated frames, trims and finish repairs, plus testing and reinstating the existing access‑control systems. It is aimed at contractors who can supply, install and certify fire‑rated doors and ensure the security system works after the works.
CA18675 - HC - STAC - phase 2A, including landscaping works
Harlow College is looking for a main contractor to build a new aircraft workshop hangar with modular classrooms and toilets, plus an external canopy and other campus infrastructure upgrades at its Harlow‑Stansted site.