Buyer profile
Sizewell C Limited
Get alerts when Sizewell C Limited publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
7
Known spend
£67m
7 disclosed
Average value
£10m
Per contract
Active suppliers
0
Last 5 years
Top suppliers
Last 5 yearsNo award data captured yet for this buyer.
What they buy
By CPV categoryConstruction worksCPV 45
4 contracts · £7m
Electrical equipmentCPV 31
1 contract · £40m
Transport equipmentCPV 34
1 contract · £20m
Architectural & engineeringCPV 71
1 contract · £100,000
Companies House
SIZEWELL C LIMITED · 09284825active
Incorporated
Oct 2014
Last accounts filed
Mar 2025
Next accounts due
Dec 2026
Active officers
14
Active officers
- MAGNUS, Ashasecretary
- BARBER, Elizabeth Mariandirector
- BARBROOK, Laura Sophie Scudamore, Drdirector
- BOTWOOD, Carolinedirector
- CANN, Nigel Francisdirector
- CROOKS, Stuartdirector
- GOLSHAN, Mina, Drdirector
- HENWOOD, Alison Ayodeledirector
SIC codes
Tender activity
Notices published per month — last 24 months
All contracts (7)
Tunnel segment production monitoring system copy
This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel
Tunnel segment production monitoring system
This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel
Site power HV/LV electrical design
The HV/ LV electrical design is essential to develop a robust and safe electrical distribution network within the Tunnel Launch Compound (TLC), the STP, SXB, SMT areas within the T
Tunnel segment production monitoring system
This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel
Fire and rescue services
Sizewell C nuclear power station needs to set up and run its own Fire and Rescue Service on site to comply with nuclear safety regulations. This service must be fully operational by the end of June 2028 and handle all fire, rescue, and emergency incidents during the construction phase of the power station.
Instrumentation and monitoring
The scope of works for this package includes: • Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems • Data acquisition and telemet
SZC - waterproofing materials
The waterproofing package includes the supply of all materials, namely bonded and unbonded membranes, waterbar materials and accessories, which are assembled and installed to form