Housing Solutions - Supply and installation of Fire Doors
Housing SolutionsEstimated Value
Up to £2,500,000
Deadline
20 June 2025
Published
19 February 2026
Type
Not specified
At a glance
- Buyer
- Housing Solutions
- Estimated value
- £2,500,000
- Closing date
- 20 June 2025 (closed)
- Published
- 19 February 2026
- Location
- South East
- Type
- open procedure
- Contract ends
- 18 January 2029 (expect a re-tender before then)
- Likely incumbent
- Xledger, current contract ends October 2029
- Published on
- Find a Tender
Full Description
Description
Scope and Delivery of Work
Mixed procurement (Goods/Works) focused on the supply and installation of fire door sets across our estate over a 3-4yr period. The successful tenderer will be expected to supply and install approximately 250 fire doors per annum inline with the Specification provided. We expect them to engage a Resident Liaison Officer (RLO) and liaise directly with the
residents regarding, surveys, installation dates, general updates, correspondents, access arrangements and any issues that arise before, during and after the works.
Programme scale and duration
We intend appointing for an initial contract period of 3 years with the option to extend for a further 12 months. We operate a two year budget but estimate our 2026-27 - 2028-29 budget will be up to £1.8m for fire door replacements and we expect to maintain similar budgets in future years. Therefore we estimate the max term spend to be up to £2.5m.
Geographical distribution
Housing Solutions was originally formed from transferred Local Authority homes in Maidenhead. These still form the majority of our homes (at least 70%), although there are post-1995 developments in Reading, High Wycombe, Slough, Bracknell, Farnborough, Wokingham, and other locations in Berkshire and Buckinghamshire.
CDM
We will appoint the Quoin Consultancy as Principal Designer, successful bidder will be appointed Principal Contractor. We expect them to prepare the key documents and Quoin will check them against the regulations.
Pricing
All relevant pricing is to be submitted via the Pricing Matrix as all-inclusive (meaning they must include all aspects required to supply and install full fire door sets). To ensure a fair and like-for-like comparison; Tender prices are to be offered and agreed on the basis that pricing will be fixed for the first 2 years of the contract.
Requirements
Mixed procurement (Goods/Works) focused on the supply and installation of fire door sets across our estate over a 3-4yr period. The successful tenderer will be expected to supply and install approximately 250 fire doors per annum inline with the Specification provided. We expect them to engage a Resident Liaison Officer (RLO) and liaise directly with the
Submission Instructions
All relevant pricing is to be submitted via the Pricing Matrix as all-inclusive (meaning they must include all aspects required to supply and install full fire door sets). To ensure a fair and like-for-like comparison; Tender prices are to be offered and agreed on the basis that pricing will be fixed for the first 2 years of the contract.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Gunfire Ltd
£2,500,000
Recent awards by Housing Solutions
- Accounting Finance Software
Awarded to Xledger, £157,405 · October 2026
- Housing Solutions - Supply and installation of Kitchens and Bathrooms
Awarded to Kincraig Construction Ltd, £5,200,000 · December 2025
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Xledger
2 contracts wonlatest 2 Nov 2026ends 31 Oct 2029£314,810
total awarded
- 2
Davies Group Limited
1 contract wonlatest 22 Jun 2026 - 3
Sophie's catering
1 contract wonlatest 19 Jun 2026 - 4
Kincraig Construction Ltd
1 contract wonlatest 19 Dec 2025ends 31 Mar 2029£5m
total awarded
Xledger is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterHow to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Housing SolutionsKey Dates
Published
19 February 2026
Submission deadline
20 June 2025
Notice type
award
Source
find a tender
Contains public sector information licensed under the Open Government Licence v3.0.
Related Tenders
Thanet district council decarbonisation retrofit scheme build
Thanet District Council wishes to select and appoint a suitable supplier for the provision of the Thanet District Council Decarbonisation Retrofit Scheme Build and invites prospect
Refurbishment of eight wooden groynes in the bay area (lake cliffs)
This contract is for the refurbishment of eight wooden groynes at Lake Cliffs to help rebuild the beach and protect the coastline. It is aimed at contractors who can carry out marine timber works and meet the required safety and environmental standards.
Fairhive Homes is a not-for-profit Registered Provider of social housing with nearly 9,000 homes. It is seeking a single materials supplier to provide a dedicated managed store and
Brighton marina to river adur coastal defence scheme -phase three (area 2A, area 2B and 5 medina groyne)
The Brighton & Hove Council is seeking bids for Phase Three of its coastal defence scheme, covering three separate sites (Area 2A, Area 2B and the Medina Groyne). The contract is for the design, removal, construction and finishing works needed to protect the shoreline and improve public access.
