Buyer profile
MINING REMEDIATION AUTHORITY
Get alerts when MINING REMEDIATION AUTHORITY publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
94
Known spend
£111m
83 disclosed
Average value
£1m
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
NAL PLANT LIMITED
£20m
- 2
JIM DAVIES CIVIL ENGINEERING LIMITED
£20m
- 3
LLETTYSHENKIN CONSTRUCTION COMPANY LIMITED
£20m
- 4
BETHELL CONSTRUCTION LIMITED
£21m
- 5
THOMAS MENZIES (BUILDERS) LIMITED
£20m
- 6
Phoenix Software Limited
£1m
- 7
Midwest Plant Ltd
£201,079
- 8
Soil Engineering Geoservices Ltd
£176,348
- 9
AMALGAMATED CONSTRUCTION LTD
£20m
- 10
ALLIANCE CONTRACTING SOLUTIONS LIMITED
£20m
What they buy
By CPV categoryConstruction worksCPV 45
7 contracts · £3m
Business servicesCPV 79
5 contracts · £4m
SoftwareCPV 48
3 contracts · £1m
IT servicesCPV 72
2 contracts · £147,000
Architectural & engineeringCPV 71
2 contracts · £112,573
Petroleum & gas servicesCPV 76
1 contract · £1m
Transport equipmentCPV 34
1 contract · £572,760
Office & computing equipmentCPV 30
1 contract · £570,000
Renewal radar
Awarded contracts predicted to come up for re-tender in the next 18 months
- IT Hardware Call Off
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by Jul 2027).
Jul 2027
40% confident
Tender activity
Notices published per month — last 24 months
All contracts (94)
Impact: investigating mine potential for cooling and thermal storage
We will explore the technical possibilities and challenges of cooling and thermal energy storage in mine workings by discharging warm water into mine workings at the BGS UKGOES sit
Nantycreiau culvert repairs
The works are required to protect the integrity of the scour protection works and avoid further sediment loss to the watercourse asset should the culvert collapse or lead to channe
Culvert flow gauging structure - ceredigion
The Authority invites you to tender for a contract for the provision of the construction of a flow monitoring structure at the outfall of a historic culvert. This culvert drains th
Property consultant
Completed a compliant procurement by conducting a further competition through the Crown Commercial Services (CCS) RM6168 Estate Management - Lot 5 Valuation and Compulsory Purchase
Brodsworth monitoring borehole
The project involves the completion of a new mine water pumping borehole on land north of Brodsworth Country Park in South Yorkshire, following a compliant open tender under the ne
Wemyss 2025-26 scour protection
The spoil tips of the Wemyss mine site lie to the north and south of the Cwmnewydion Road. The Nant Cwmnewydion flows along the southern edge of the spoil tips, causing them to ero
Windows 11 transition support
The Authority have contracted with a supplier to assist with the Windows 11 build and rollout project, with the aim of improving and modernising the Authority's end-user devices an
Vehicle hire
Vehicle hire contract to include standard hire and specialist vehicles e.g. mini buses and 4x4's Contract for vehicle hire for all Authority personnel. Including hire of specialist
Windows 10 & exchange server extended security updates
Extended security updates for both end user devices and exchange server following end of Microsoft support for Windows 10 devices on 14 October 2025.
Sustainability data management support
Provision of expert support, advice and access to a cloud-based sustainability data management platform. Expert support, advice and access to a cloud-based sustainability data mana
Applicant tracking system
Provision of Applicant Tracking System & Recruitment CRM. To include candidate portal, onboarding essentials, agency portal, demo environment and e-signature capability. Contract v
Wireline geophysical logging services
This Framework was established to provide Wireline Geophysical logging services to the Mining Remediation Authority. There is no change to the nature or value of the framework. Due
Remediation of metalliferous mine waste
Addressing metalliferous diffuse pollution from old, abandoned metal mine sites within UK river catchments is a priority due to the significant environmental impacts associated wit
Lynemouth solar DNO grid upgrade
This contract is for grid upgrade works at Lynemouth MWTS to enable the connection to the grid of the solar PV system that is to be installed over the coming months. These works fa
Materials and waste data capture tool
Material, waste capture and carbon reporting tool. Software as a Service (SaaS).
Heating ventilation and air conditioning (HVAC) & liquefied petroleum gas (LPG) maintenance, including remedial and emergency works
Planned Preventative Maintenance (PPM) of HVAC systems in the NHS and MHC buildings and all associated kit and machinery, this also includes PPM of 4x LPG boilers in the MHC. The c
HO - gas suppression & fire and intruder alarm, extinguishers - service and maintenance
The maintenance contract for the Gas Suppression system and the Fire and Intruder Alarm and Extinguishers.
Lsbud membership
The Mining Remediation Authority require a LSBUD Membership to enter our pipeline data for one of our sites and any other future works onto their database, as well as joining their
Headquarters ground maintenance
SME quote Process - This contract is for the Grounds Maintenance for the Mansfield Headquarters. Mow all grassed areas and remove all grass clippings from site - unless otherwise a
Whitburn outfall buoy replacement
The Mining Remediation Authority (MRA) constructed a Mine Water Treatment scheme to control rising mine water that had been steadily recovering, the outfall from the MWTS is approx