Buyer profile
MINING REMEDIATION AUTHORITY
Get alerts when MINING REMEDIATION AUTHORITY publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
94
Known spend
£111m
83 disclosed
Average value
£1m
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
NAL PLANT LIMITED
£20m
- 2
JIM DAVIES CIVIL ENGINEERING LIMITED
£20m
- 3
LLETTYSHENKIN CONSTRUCTION COMPANY LIMITED
£20m
- 4
BETHELL CONSTRUCTION LIMITED
£21m
- 5
THOMAS MENZIES (BUILDERS) LIMITED
£20m
- 6
Phoenix Software Limited
£1m
- 7
Midwest Plant Ltd
£201,079
- 8
Soil Engineering Geoservices Ltd
£176,348
- 9
AMALGAMATED CONSTRUCTION LTD
£20m
- 10
ALLIANCE CONTRACTING SOLUTIONS LIMITED
£20m
What they buy
By CPV categoryConstruction worksCPV 45
7 contracts · £3m
Business servicesCPV 79
5 contracts · £4m
SoftwareCPV 48
3 contracts · £1m
IT servicesCPV 72
2 contracts · £147,000
Architectural & engineeringCPV 71
2 contracts · £112,573
Petroleum & gas servicesCPV 76
1 contract · £1m
Transport equipmentCPV 34
1 contract · £572,760
Office & computing equipmentCPV 30
1 contract · £570,000
Renewal radar
Awarded contracts predicted to come up for re-tender in the next 18 months
- IT Hardware Call Off
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by Jul 2027).
Jul 2027
40% confident
Tender activity
Notices published per month — last 24 months
All contracts (94)
Emergency call out and minor works -
Emergency Call Out and Minor Works - Treatment Works - MINE ENTRY
Emergency call out and minor works
Emergency Call Out and Minor Works, Shaft capping and associated drainage works
Emergency call out and minor works
Emergency Call Out and Minor Works, Emergency Filling Works
Emergency call out and minor works
Emergency response and minor works, Site setup, monitoring PROPERTIES
Existing water treatment solutions
The Mining Remediation Authority (MRA) manages the effects of past coal mining, including managing mine water pollution from both coal and metal mines, handling subsidence damage c
HO - pavement resurfacing
The Mining Remediation Authority has awarded a contract for existing pedestrian footpaths located at its head office site, to be resurfaced with tarmac. Over time, the current pavi
Board management tool software
The Authority has awarded a contract for the supply of Convene Software-as-a-Service. A cloud based board management platform to streamline the preparation, distribution, and secur
Wheal jane - reaction chamber mixing tanks vsds
Design and build of a permanent VSD installation for the Reaction Chamber Mixers at Wheal Jane Mine Water Treatment Scheme
Wheal jane new shaft pumps
New shaft pump at Wheal Jane Mine Water Treatment Plant to replace current pump - 55 kW attached to 6 inch wellmaster hoses with 80 metres of cable (35mm x 4 core).
North pennines - survey of raw water main
On a remote site in the North Pennines area of England To carry out trial holes, to locate infrastructure, to allow others to finalise the property agreement. To carry out a CCTV s
Nent haggs compound reinstatement
This requirement is to reinstate the site to agricultural usage, at Nent Haggs, Cumbria.
Minera stryt Y scweiar 2026 culvert replacement
The purpose of these works is to install a new culvert on the Stryt Y Scweiar channel, which is primarily fed by mine water discharge alongside surface water flows. The existing cu
Parc mine channel restoration
Ongoing project to assess the pollution impacts from Parc Mine and determine the best way of managing the problem. A recent slope failure has led to significant debris deposited in
Welsh potosi - esgair ffriath surface water management
The Welsh Potosi project forms part of a wider programme delivered by the Wales Metal Mine Programme (WMMP), with the objective of reducing river pollution and restoring river heal
District network operator grid upgrade
This contract is for District Network Operator (DNO) grid upgrade works at Deerplay MWTS to enable the connection to the grid of Battery Energy Storage to facilitate the solar PV s
Phase 3.4 capping and reinstatement works
Phase 3.4 Capping and Reinstatement Works - A review of mining records identified the area once operated as Limehurst Colliery and the collapse was in the vicinity of shaft 393400-
Emergency call out and minor works
Internal repairs to MRA property site - Repairs Works to Property
Emergency callout and minor works
Site Clearance Works - Emergency Callout and Minor Works
Emergency call out and minor works
Excavations and removal for disposal off site existing reinforced concrete shaft slab founded , Emergency Call Out and Minor Works
Emergency call out and minor works
Installing fencing along coastal path, Emergency Call Out and Minor Works