43 contracts found
Provision of claims handling and related services for DfT Operator Limited (DFTO) and subsidiaries. The successful supplier will be responsible for providing a comprehensive and fu
Maintenance of gate line installed at TransPennine Trains (TPT) station by the original equipment manufacturer (OEM) of all the ATGs operated by TPT. The services under this contra
Provision of cleaning services across the contracting entity’s estate. The notice relates to a 12-month extension of the existing contract with the incumbent supplier in order to e
A time extension to TPT's Class 397 Technical Support and Spares Supply Agreement ('TSSSA') to 25th May 2031
This notice announces a time extension to the existing maintenance contract for Class 397 trains, originally held by TransPennine Trains (TPT), meaning the same services will continue for a longer period.
TransPennine Trains ('TPT') operates a fleet of 12 Class 397 EMU trains along the UK West Coast Main Line rail network. Having had their initial overhaul in 2026, additional overha
Supply of rolling stock •A Manufacture and Supply Agreement (“MSA”), for the Train Manufacturer and Maintainer (“TMM”) to design, build, test and commission the selected option wil
The financing of New Trains for TransPennine Trains Limited (including any potential successors). TPE conducted this procurement (New Trains Financier) to procure an Owner to finan
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no
This contract is for specialist overhead line equipment (OLE) work to remodel Manchester Airport railway station, adding or extending platforms and possibly a new turnback facility so longer trains can be accommodated. It is aimed at firms with railway OLE expertise, working under Network Rail and Transport for the North standards.
This contract is for demolition and structural works at Manchester Airport railway station to create extra platform capacity for longer trains. It involves removing a bridge, track protection, pavement, and various concrete and steel elements, and must be carried out safely within a live rail environment.
Kier Transportation intends to engage experienced and qualified contractors to undertake works associated with Temporary Vehicle Restraint System across A66 NTP. The appointed cont
Kier Transportation intends to engage experienced and qualified contractors to undertake works associated with Temporary road Markings required for traffic management along the A66
Kier Infrastructure is seeking a consultant or subcontractor to provide design review, pricing, programming and flood‑modelling support for the MoD Warcop A66 Northern Trans‑Pennine pre‑construction phase.
Kier Transportation intends to engage experienced and qualified Civil contractors for the construction of full civils work package, including but not limited to, earthworks, draina
Kier Transportation intends to engage experienced and qualified contractors to undertake works associated with the tree clearance of all remaining arboricultural operations require
Kier Infrastructure are looking to engage experienced and qualified Supplier for the provision of Drainage Materials for the main works on the A66 Northern Trans-Pennine scheme. Th