Construction Government Contracts
97 contracts found
Building Consultancy Services Dynamic Purchasing System
As the Dynamic Purchasing System list of consultants has now been created after the completion of the initial stage, new bidders will be able to submit SPD (Scotland) responses on
Supply and Installation of Esless Lane Cycleway Bridge
This contract is for a construction company to design, supply, and install a new bridge for a cycleway (bicycle path) on Esless Lane. The buyer is looking for a contractor who can handle the full project from engineering the bridge to building and fitting it on site.
Gwynedd and Anglesey Structures & Coastal Maintenance Framework 2026
This Framework Agreement is established by the Contracting Authorities (Gwynedd Council and Isle of Anglesey County Council) in accordance with the Procurement Act 2023 and the NEC
Proc-26-70 | A483/A5 – Drainage Works during Spring 2026 Cyclic & Autumn 2026 Cyclic Maintenance Programmes
This Invitation to Tender relates to a mini-competition to procure a Supplier under Lot 3 of the NMWTRA Minor Civil Engineering Construction Works Framework 2025 to deliver drainag
Measured Term Contract for Small Construction Projects up to £35,000
No description available
Lower Thames Crossing - Kent Roads - CCTV Drainage Survey Services
Skanska is looking to appoint a subcontractor to provide CCTV drainage survey services for the Lower Thames Crossing (Kent Roads) project. The selected subcontractor will be requir
CA17968 - ITT 24/2026 - PEACEPLUS PP1004 - St Bronaghs Rostrevor GAC - Internal External Upgrade Works
Competent Contracting companies are hereby invited to tender to deliver PEACEPLUS Project - PP2004 - St Bronaghs Rostrevor GAC - Internal + External Upgrade Works: A combination of
A9 Dualling Delivery Framework Agreement
Transport Scotland has identified a need to establish a Framework Agreement to deliver the design and construction of the following five sections of the A9 Dualling Programme betwe
High Speed OCS Design, Construction, Testing & Commissioning Approved Body Engagement
Colas Rail are looking to engage with an Approved Body to support with obtaining UK declaration of conformity for its Interoperability Constituents (ICs) relating to specific eleme
CP2625-25 Resurfacing, Reconstruction, Recycling, Patching and High Friction Surfacing Framework 2026 -2030
This is a framework agreement for road surface work across the UK over four years (2026-2030). The government is setting up a pre-approved list of contractors who can be called on to do resurfacing, reconstruction, recycling, patching, and high friction surfacing on roads. If you're selected, you'll be able to bid on individual road projects as they come up.
Rocket Park Refresh Project 2026
Lytchett Matravers Parish Council invites tenders for the refurbishment and enhancement of Rocket Park, the village's principal public play area located in Lytchett Matravers, Pool
WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4)
WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall Scope of Works: Working in partnership with HS2, the BBV
Boiler Replacement and Associated Mechanical Works - The Monastery Manchester (Grade II Listed Building)
The Monastery of St Francis & Gorton Trust needs a qualified heating contractor to replace their old boiler system and hot water equipment at their Grade II* listed historic building in Manchester. The work involves removing the current boiler plant and flue system, installing new high-efficiency gas boilers, upgrading controls, and ensuring everything integrates carefully with the building's heritage features.
Dynamic Purchasing System for Retrofit Programme Delivery Services
Procure Plus Ltd (PP) is a social housing regeneration consortium. PP specialises in the procurement of goods, works and services for the construction and maintenance of social hou
A66 Northern Trans-Pennine Project (NTP) - Schemes 1 & 2 Tree and Vegetation Clearance Phase 2
Kier Transportation intends to engage experienced and qualified contractors to undertake works associated with the tree clearance of all remaining arboricultural operations require
CA17868 - ITT 20/2026 - PEACEPLUS PP2011 Greenhill YMCA - Outdoor Upgrade Works
Applications are invited from Contractors, under the terms of the NEC4 ECSC Short Contract, who wish to be tender for the following PEACEPLUS project: Greenhill YMCA - Outdoor Upgr
A66 Northern Trans-Pennine (NTP) - Scheme 1 & 2 Major Civils Works
Kier Transportation intends to engage experienced and qualified Civil contractors for the construction of full civils work package, including but not limited to, earthworks, draina
CA17916 - Tender 12/2026 - PEACEPLUS PP2018 - Saul GAC - Community Walking Trail Works
Newry Mourne and Down District Council, requires the Contractor to undertake public realm and site improvement works at the Site as part of the Peace Plus Programme. The works comp
Civils, Buildings, OHL and UGC Framework – Multi Site
```json { "overview": "Scottish Hydro Electric Transmission is setting up a long-term framework to find contractors for major electricity network infrastructure work across Scotland. This is a huge multi-lot procurement worth up to £7.4 billion over up to eight years, covering everything from digging trenches for underground cables to building towers for power lines and constructing buildings. The buyer wants strategic partners who can handle design, build, test and handover of complete projects.", "requirements": [ "Capability and capacity to deliver design, management, construction, testing and completion works", "Ability to work on live transmission assets and critical infrastructure", "Understanding of CDM Regulations (Construction Design and Management) and Main Contractor duties", "Competency in RIBA Stage design management (at least Stage 4)", "BIM (Building Information Modelling) capability for design and construction phases", "Knowledge of SSEN T Gate process documentation including Design Risk Management Index and Hazard Identification Workshops", "Health, safety, environment and sustainability compliance and reporting capability", "Experience with planning applications, environmental assessments and biodiversity net gain reporting", "For OHL and UGC lots: experience with high voltage transmission systems (132kV and above)", "For civils lots: geotechnical, hydraulic and structural design/delivery experience where applicable", "For buildings lot: mechanical and electrical services fit-out capability", "Stakeholder coordination and utility investigation management experience" ], "key_tasks": [ "Lot 1 (Civils up to £10m): Substation site clearance, earthworks, foundations for plant, internal substation roads and drainage, access track construction, public road improvements, standard ducting and cabling, peatland restoration (work is split into 5 Scottish regions — bidders can apply for one or more)", "Lot 2 (Civils over £10m): Complex substation platforms and foundations, lengthy access tracks, bridges and retaining walls, flood defence schemes with sheet piling and pumping stations, watercourse diversions, slope stability works, resilient substation adaptations, major public road realignments", "Lot 3 (Buildings & Infrastructure): Design and build storage buildings, training facilities, office buildings, upgrades and extensions; internal fit-out work including partitions and cable management; mechanical and electrical services in buildings; replacement of RAAC (defective concrete) roof structures; establish and manage design teams; prepare RIBA Stage 4 drawings and BIM models; develop construction programmes; undertake enabling works; prepare planning applications with visualisations and noise studies; complete Environmental Management Plans and Biodiversity Net Gain reports; specific delivery of electrical substation buildings and associated control systems for training school infrastructure", "Lot 4 (OHL Pole Construction): Detailed design of pole foundations and temporary works; conduct surveys and ground investigations; install wood, steel or composite poles; construct foundations (reinforced concrete, embedded or piled); erect poles with alignment and stability works; install crossarms, insulators and fittings; string conductors and earth wires; remove/replace existing poles where needed; tie in to existing lines; test and commission to demonstrate compliance; produce as-built records", "Lot 5 (OHL Tower Construction): Detailed design of lattice tower foundations and structural interfaces; temporary works design for excavation and erection; conduct surveys and ground investigation; build tower foundations (piled or reinforced concrete); deliver, assemble and erect steelwork; install insulators and fittings; string conductors; remove/replace/modify existing towers; manage overhead line realignments; manage interfaces with live assets and system outages; structural testing and verification; produce as-built documentation", "Lot 6 (UGC Construction): Detailed design of cable routes, trenches, ducts and joint bays; temporary works and traffic management design; conduct surveys and utilities investigations; excavate and lay ducts; construct joint bays and termination compounds; pull and install cables; install joints and terminations; restore surfaces and reinstate agriculture; cable testing and commissioning support; produce as-built GIS data" ], "how_to_read": [ "This is a 'framework' not a one-off contract — it's a pre-agreed list of approved suppliers that SSEN Transmission will call off work from over up to 8 years. You're not bidding for specific work yet; you're bidding to be on the approved list. Once appointed, you'll compete for individual projects as they arise.", "The 'lots' are separate competitions — Lot 1 covers small civils work (under £10m), Lot 2 covers large complex civils (over £10m), Lot 3 is buildings, Lot 4 is pole towers, Lot 5 is lattice towers, and Lot 6 is underground cables. You can bid for one lot or multiple lots depending on your capability. Lot 1 is also split into 5 regions so you can apply regionally.", "The £7.4 billion figure is the total potential value across ALL lots over the full 8 years — it's not what you'll earn. Real value will depend on which lot(s) you win and what projects get called
Employability Services Procured Service Arrangement - Phase 4
The Council is seeking to appoint service providers to the Employability Procured Service Arrangement (PSA). This is a bespoke arrangement/flexible framework which has been develop