Estimated Value
Up to £279,950
Deadline
12 August 2026
Published
4 September 2026
Type
Not specified
Overview
The British Museum brings together the history of humankind, all cultures of the world spanning millennia. It connects us to our past and to each other.
It is a place where everyone is welcome, where many voices meet to understand, and to question what brings us together and what separates us. It is a place of exploration and a place of inspiration.
The collection that the Museum holds in trust for the world is of unparalleled breadth, depth, beauty and significance. A truly global resource, free and available to everyone.
Additional details
The Museum's role is to enhance and make accessible the collection through research, through interpretation, through display, through lending, and to share what it learns, as well as the process of learning, with others. With this matchless position comes a responsibility to ensure that this work can continue, ensuring the collection is cared for and accessible for generations to come, and that the Museum remains a centre of excellence and is continually relevant into the 21st century.
The physical manifestation of the British Museum in Bloomsbury is iconic. It comprises almost an entire city block in one of the most intricate and established parts of central London.
It is a treasured national icon within a conservation area that is, in itself, emblematic of the Capital. The Museum has an internal floor area of over 100,000m2, within a footprint that is packed with a diversity of buildings; the estate is Grade I listed, with perimeter properties that are listed Grade II.
Each part of the Museum contains, iconic, often sizeable and irreplaceable items from the collection, and each is visited by many thousands of people, every day. Space on the site is both limited and precious, especially in terms of gallery spaces.
The original quadrangle was designed for 100,000 visitors per annum, a figure that was already far exceeded in the 1850s. As it stands, annual visitor numbers to the Museum now regularly exceed six million.
Today, there are heightened security requirements and a fundamental need to ensure inclusivity and access, as well as enabling intuitive wayfinding, addressing dilapidations, and creating an environment where people can connect with the collection, and by doing so, with each other. The Western Range Programme focuses on a substantial part of the estate that is in urgent need of both repair and re-imagining.
This offers the Museum an opportunity to make a statement of its future intent, through reimagined galleries, new state-of-the-art storage facilities and engaging contemporary architecture, in juxtaposition to the highly significant and already celebrated listed buildings on the site. A multi-disciplinary design team led by Lina Ghotmeh Architecture has been selected to deliver the Western Range programme which is currently at the end of RIBA Stage 2 in the design process.
Despite appearing as a single entity, the Western Range comprises a miscellany of 10 separate buildings which have been added to Robert Smirke's original Grade I listed Museum; as a result, the exact extent of the red-line boundary and phasing for this project is dependent on a number of interlocking considerations. The proposed project outline can be seen in the attached documentation.
In the region of 15,000m2, it accounts for almost 15% of the floor space within the Bloomsbury site, in a warren of inflexible and static rooms. Further, recent surveys indicate that the existing building fabric and infrastructure are in a state that is below modern expectations.
It comprises around 7,500m2 of gallery space and currently houses the Ancient Egypt, Ancient Greece (including the Parthenon Sculptures), Rome, and Ancient Assyria and Middle East collections, along with 4,500m2 of back-of-house collection storage. The delivery of the Western Range redevelopment will take place within a complex and highly sensitive operational environment, requiring construction works to be carefully planned and coordinated alongside the ongoing activities of the British Museum.
As a live cultural institution, the Museum must continue to provide safe and effective access for visitors and staff, while ensuring the protection, movement, and management of its collections throughout the construction period. The project presents a number of unique challenges, including working within a heritage setting, constrained site conditions, restricted access, neighbouring property interfaces, complex logistics requirements, and the need to coordinate multiple stakeholder requirements.
A Construction Logistics Advisor is therefore required to provide specialist, project-specific expertise to develop a coordinated logistics strategy that minimises disruption, maintains operational continuity, and supports the successful delivery of the Western Range Programme. The Construction Logistics Advisor will act as the lead advisor and coordinator of construction and logistics strategies, working alongside the Client, Project Team, the construction marketplace and wide range of stakeholders.
The Advisor will review project information and undertake independent research to support delivery of the programme. The appointment will have two core packages summarised below: Develop a Construction Logistics Strategy • To include a buildability review of the completed RIBA Stage 2 design to identify issues, risks and opportunities in relation to factors including budget, programme, etc • Produce an initial phasing plan • Review estate wide constraints • Develop an initial Construction Programme and Logistics Strategy • Complete a Construction Impact Assessment relating to disruption to business operations Provide Pre-Construction Advice • Maintain an iterative Buildability Appraisal throughout RIBA Stage 3 and test technical, financial and legal viability of the design proposals from multiple viewpoints. • Develop site layout plans • Prepare details phasing plans including decant and enabling works • Develop and support delivery of a pre-market engagement strategy to inform the Procurement Strategy, Master Programme, Cost Plan and Risk Register. • Prepare a Construction Environmental Management Plan and outline Site Waste Management Plan • Development of an Emergency Egress Strategy or Plan to support construction and temporary works phases The following three packages are optional and some, or all, may be instructed as delivery of the Western Range Programme evolves: Procurement Support • Support the procurement of packages to deliver the agreed Logistics Management Strategy, decant and enabling works • Contribute to definition of Contractor Design Portions were relevant • Review and contribute to RIBA Stage 4b procurement documentation in line with the agreed Procurement Strategy, including review of construction information and technical specifications relevant to logistics and buildability, and participate in tender evaluation. • If instructed, produce and input into documents required by the local planning authority for the discharge of Planning Consent Conditions and Listed Building Consents Construction Support • Contribute to relevant portions of the Information Management Plan. • Review proposed construction methodologies of appointed contractor(s) in line with the Construction/Logistic Strategy, statutory and planning requirements and best practice Construction/Logistics Advice in relation to the Transformation Programme • Advise on large object and collection decant in terms of enabling works, transport routes and provision of supporting staff facilities • Review compliance with relevant legislation, standards and museum practice of display relocation plans, alternate visitor facilities and relocation of critical collection support facilities Comprehensive details of all Packages are provided in the tender documents.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
BSB CONSTRUCTION LIMITED
£279,950
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
BUREAU VERITAS UK LIMITED
£379,600
total awarded
- 2
HIZKIA France
1 contract wonlatest 17 Jun 2026ends 30 Sept 2027€137,043
total awarded
- 3
Meyvaert NV
1 contract wonlatest 11 Feb 2026ends 3 Sept 2027£499,313
total awarded
- 4
NEWMARK GERALD EVE LLP
£189,754
total awarded
BUREAU VERITAS UK LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
British MuseumKey Dates
Published
4 September 2026
Submission deadline
12 August 2026
Notice type
award
Source
find a tender
Related Tenders
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
Malaysia penang centre regear and refit
The British Council needs a contractor to refit its Penang office (Wisma Great Eastern) so it can host examinations, adding exam rooms and related facilities.
Poplar harca lift service and maintenance – all estates
Poplar HARCA is seeking to procure a new Contract for Lift Service and Maintenance. The Contract will require the Contractor to provide and manage all the necessary resources and i
Integrated security solutions (ISS) works at walham and pentir
National Grid Electricity Transmission Plc is seeking experienced and suitably qualified suppliers capable of delivering a fully integrated security solution for critical national
