Washwood Heath Depot and Network Integrated Control Centre
Estimated Value
Not specified
Deadline
Not specified
Published
21 May 2026
Type
works
Overview
The contract relates to the design, construction and dynamic testing of Washwood Heath Depot (WWH) & Network Integrated Control Centre (NICC) works for the HS2 project The WWH & NICC Contractor is responsible for the design, fabrication, assembly, supply, construction, installation, supervision, inspection, testing, system commissioning and safety authorisation of a rolling stock depot and the design, build and commissioning of a Network Integrated Control Centre at Washwood Heath in Birmingham (including maintenance of all the works up to their completion).
Scope includes: - A maintenance building located within the depot - building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, welfare and domestic provisions, building security and a building management system; - The maintenance building will contain light and heavy maintenance plant and equipment facilities (gantry cranes, monorail cranes, access gantries, access pits, inspection and maintenance roads, heavy cleaning facility, heavy lift and bogie drop facilities, depot offices, depot control centre, pantograph test facility, biohazard facility, building management system and workshop and storage areas etc). Depot infrastructure includes: - Reception/departure roads, track/permanent way, test track, switches & crossings, overhead catenary system, stabling/cleaning sidings, depot signalling system, depot protection system, telecoms system, automatic vehicle inspection units, wheel lathe(s), carriage wash machines, toilet emptying facilities, platforms, walkways, train crew booking facilities and a separate heavy cleaning facility; - Provision of non-traction High Voltage and Low Voltage power network for all plant, equipment and buildings and all Protection & Controls and Supervisory Control and Data Acquisition associated with the traction and non-traction switchgear.
Provision of all mechanical and electrical systems throughout the depot and associated buildings. The NICC Infrastructure includes: - A Network Integrated Control Centre building located within the depot area, including building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, operational and incident control rooms, training and IT systems room, offices, ancillary rooms, welfare and domestic provisions, building services, building security and a building management system; - Car parking facilities, gatehouse, site security and lighting within the depot area and the provision of site drainage and all utilities related to the depot and connections to the main utility networks; - Design integration with the other HS2 Ltd contractors (Rail Systems, Civils, Rolling Stock and the Depot Facility Owner (DFO)). The WWH & NICC Contractor will be the 'Principal Contractor' of the depot site and the NICC, responsible for construction integration.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Sign up freeto open noticeA free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Key Dates
Published
21 May 2026
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Contracts
RA360101 - construction OF NEW office space
Bidders are required to read in full the specification document. Bidders are required to upload a proposal/quote covering the requirement as outlined in the specification. Quotes t
RA360097 - floor power & data cabling
Bidders are required to read in full the specification document. This contains all details regarding the works and response format. Bids that to not include the information request
Lochfield park HA window & door replacements framework 2027
The successful Candidate(s) will be selected to join a new framework Lot as one of the contractors responsible for the installation of replacement ‘side hung casement (with egress
Housing kitchen replacement programme
North Lanarkshire Council is undertaking preliminary market engagement in relation to a proposed Supply and Install Kitchen Replacement Programme across its Council housing stock.