T/HR061/26 Tooling and Storage Tender for ESS (Sweden)
Estimated Value
Not specified
Deadline
9 November 2026
59 days remaining
Published
Not specified
Type
Supplies
Overview
The European Spallation Source (ESS) is a European Research Infrastructure Consortium (ERIC) committed to the goal of building and operating the world leading facility for research using neutrons. Once constructed in Lund, Sweden, it will provide new opportunities for researchers in a broad range of scientific areas including life sciences, energy, environmental technology, cultural heritage, and fundamental physics.
It will be an accelerator-based facility producing neutrons for a large array of advanced instruments. The UK is a partner in construction of the ESS alongside 15 other European countries and has committed significant funding for construction.
The Science and Technology Facility Council (STFC) is managing the UK contribution to ESS. The Active Cell Facility is one such contribution to be delivered by Remote Applications in Challenging Environments (RACE) — a department of the United Kingdom Atomic Energy Authority (UKAEA) (the ‘Purchaser’).
Additional details
Inside the Active Cells exhausted, highly radioactive parts involved in the neutron generation will be size reduced using remote handling technologies and removed for confinement. UKAEA are undertaking delivery of the Tooling Storage System, comprising six storage devices designed to house remotely operated tooling within the Active Cells. The scope of this tender is to manufacture, assemble, test and deliver to Sweden the following items: Shaft Cutting Station (SCS) Support Plate Storage Device Proton Beam Window (PBW) Strongback and Deployable Camera Stand (DCS) Storage Device Modular Wall Storage (MWS) Device, including Bolting Tool Caddies Chain Storage Device Storage Containers Cable Spooling Tool Testing shall include mechanical static checks, functional testing, and structural testing in accordance with the FAT plan.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Sign up freeto open noticeSign up free to downloadA free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Procurement Portal
Open the original notice
Click the button below to view this tender on the official portal
Find submission instructions
Look for "How to apply" or "Submission" sections in the notice
Register on the portal
Create a free account on the buyer's procurement platform
Download tender documents
Download all specifications, templates, and pricing schedules
Submit before the deadline
Complete all documents and submit through the portal — do not email unless explicitly instructed
Always check the official notice for the exact submission method and deadline.
A free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.
Key Dates
Published
Not specified
Submission deadline
9 November 2026
Notice type
Tender
Source
council:preston-council
Related Tenders
T/074MN/26 - librti diagnostics
This specification covers the United Kingdom Atomic Energy Authority’s (“the Authority’s”) requirement for diagnostics equipment for the LIBRTI facility project, including LOT 1: H
T-079BH-26 - supply of 33Kv HV cable
UKAEA is undertaking refurbishment works to the J5 electrical infrastructure to support the ongoing operation and reliability of the Culham Campus power distribution network. As pa
T/080MN/26 - whole energy absorption spectrometer (WEAS)
UKAEA is looking to understand what companies can do in building a 4‑π scintillator detection system for measuring decay heat. They want a clear picture of the industry’s skills, past work and any limits before moving to a formal contract.
T/085DB/26 - control software
For this project We have 6 modules. Each module is made up of 3 stages. These stages are (1) an x-y stage, (2) a tilt goniometric stage, and (3) rotational stage. The links to thes
