Overview
With the aim being to undertake work during the Spring of 2019, this preferred start date is intended to allow for all kerb fixings and corrosion remedial works to be completed ahead of separate resurfacing work planned for 2020/21. Following close monitoring of the existing 7200 Kerb Units ( 4 studs per kerb unit) and the associated Deck Waterproofing System over recent years, since their initial installation, as part of the strengthening and widening scheme around the turn of the century, and following the identification of serious deterioration, a number of technical solutions were developed and tested and the preferred solution and range of activities required going forward is described as follows: Remove and retain existing kerb units for re-use; Remove existing mild steel holding down studs, clean and shot blast bridge deck to remove corrosion; Undertake Plate testing (MPI) and, if necessary, undertake Weld repairs; Weld new stainless steel holding down studs to the prepared bridge deck; Undertake Weld Test; Prime and waterproof bridge the deck with a high performance waterproofing system; Reinstate kerb units and fix down using new stainless steel fixings; Make good to all Drainage connections, with all of these aforementioned activities requiring strict associated Traffic Management control.
It is anticipated that the work may last for a duration of up to 12 months, from the proposed contract commencement date of 01/04/19. Interested Contractors may access a copy of the trial documentation for information, via the Portal, as this is likely to be of assistance in helping them to determine if they can offer the same or a similarly durable and cost effective solution and encourage a tendered submission in due course.
However, no information taken or implied from this trial report and the supporting information documents shall necessarily be deemed acceptable for incorporation in the proposed works and the Council reserves the right to impose contractual terms and specifications that may not be satisfied by these means. Additional information: In addition, as a key part of this procurement process, any prospective tenderer will, at their own cost and risk, be expected to attend, or at least be represented at, the designated Provider Information Event to be held at the Bridge Office, and currently scheduled for 10:00 am on Wednesday 7th November, 2018, for potential bidders to familiarize themselves with local conditions, any potential operational constraints and ask any questions of the Bridge Engineering Manager and his Technical Support colleagues.
Contact & helpdesk
The main meeting point contact and address for assembly will be as follows: Richard Cole, Engineering Manager, Tamar Bridge and Torpoint Ferry Joint Committee, Tamar Bridge Offices, Pemros Road, St. Budeaux, Plymouth, PL5 1LP.
- Phone
- 01752 361577
Additional details
Attendance is strongly advised but not mandatory and any contractors unable to be in attendance will, along with those who were, be provided in writing with any information or questions raised and answers given on the day, to ensure all parties have the same information to base their tender submissions upon, and seek to avoid any future confusion or misunderstandings concerning the specification and scope of requirements etc. Contractors will be permitted to access the Bridge under supervision wearing either their own or suitable PPE to be provided on site and are requested to use the Portal Messaging system to confirm their attendance and the names and job titles of those anticipated to be in attendance. Only if your company or its representative (s) is unable to attend at the last minute or unavoidably detained please advise Richard, via either of the following means, as soon as possible: Telephone: 01752 361577 or Email: richard.cole@tamarcrossings.org.uk Any additional information requests or initial queries and all subsequent tender clarification requests must ONLY be raised using the Due North Portal via supplyingthesouthwest.org.uk , Project Reference DN291006.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Cornwall CouncilKey Dates
Published
19 October 2018
Submission deadline
17 December 2018
Notice type
award
Source
contracts finder
Related Tenders
Road surface treatments - DPS
This Dynamic Purchasing System is for the provision of the following Road Surface Treatment Services: • Premium Surface Dressing • Micro Asphalting and Footway Surface Treatments •
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f