St Andrew Square Public Realm Improvement Project
The City of Edinburgh CouncilEstimated Value
Up to £2,750,000
Deadline
Not specified
Published
1 July 2026
Type
works
Overview
The City of Edinburgh Council requires a Contractor to deliver public realm improvements to the area around St Andrew Square, within the city centre. St Andrew Square is a key connection between the existing City Centre West to East Link (CCWEL), the proposed George Street and First New Town (GNT) scheme, and the George Street to Waverley Bridge (GSWB) active travel project.
St Andrew Square has undergone recent transformation with investment to the central gardens in 2008, tram development, and various building redevelopments for retail, hospitality and offices. Edinburgh is a leading global capital city set within an exceptional historic and architectural setting.
The city centre, a unique urban landscape comprising the Old and New Towns of Edinburgh, was inscribed as a UNESCO World Heritage Site in 1996. The First New Town, of which George Street forms its core, carries significant and unique value and is a hive of activity, offering a place to work, visit and live.
Additional details
At a strategic level, the City Centre Transformation (CCT) Strategy which unifies existing city centre projects into a singular holistic delivery plan. The CCT Strategy identifies key quiet zones in the city centre where people will have priority, with the overall objective to secure a largely car free city centre by 2030.
The City Mobility Plan (CMP) strategy frames a bold, ambitious, and rapid change agenda (underpinned by a target to be net carbon zero City by 2030) and sets out a basis for significant tram, bus network and active travel interventions to improve mobility and address key challenges. The strategy will mean car and heavily bus dominated traffic within the city centre will be replaced by walking and cycling infrastructure, and by smaller cleaner passenger vehicles for those, who with mobility constraints, would find this approach too challenging.
The designs for St Andrew Square, align with many of the CCT and CMP core objectives. Within the project area, design work is ongoing for the northern and western sides of the Square with minor operational changes to the south of the square.
Proposed changes: - Eastern footway (pavement) will be widened to 6.0m creating more space for public realm enhancements. - New protected bi-directional (two-way) cycle track will be introduced on the east side of St David Street and along the north side of St Andrew Square. - Junction upgrades to support safer, easier and more accessible movements for people walking, wheeling and cycling. - Existing blue badge parking, business loading and taxi rank spaces to be retained along southern side of the square, with additional capacity added. - Existing pay and display parking to be removed along northern side of the square and replaced with blue badge spaces on the northern side of the road. In summary, the project will provide a continuous link between various ongoing projects and will maximise accessibility for active modes whilst retaining fundamental operational and servicing requirements including parking, loading and public transport.
Completing this work will enhance the attractiveness of St Andrew Square for everyone and encourage people to spend time in and around the square and within the various local businesses. The works will be undertaken in a highly constrained urban environment and must be carefully planned and executed to minimise disruption.
The Contractor will be required to ensure that access to local businesses and residential properties is maintained at all times throughout the duration of the works. Additional information: We kindly invite interested parties to complete the questionnaire attached to this notice by 30th July 2026. Your answers will help the Council determine the optimal procurement approach.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
Edinburgh Council is looking for a contractor to improve the public space around St Andrew Square in the city centre, including widening pavements, adding cycle tracks, upgrading junctions, and managing parking and loading areas. This is part of Edinburgh's wider plan to make the city centre car-free by 2030 and more walkable and cycleable.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
The City of Edinburgh CouncilKey Dates
Published
1 July 2026
Submission deadline
Not specified
Notice type
planning
Source
find a tender
Related Tenders
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
Provision of motor control centres, systems integration and ICA services
Scottish Water is seeking to establish a multi-supplier Framework Agreement for the provision of Motor Control Centres (MCCs), Instrumentation, Control and Automation (ICA), System
Kishorn port - phase 1B - east quay development
Kishorn Port Limited (KPL) own and operate the drydock facility at Kishorn. The existing drydock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectare