SRQ WORK PACKAGE 1B - DEMOLITION
Sheffield City CouncilEstimated Value
Up to £3,000,000
Deadline
21 October 2015
Published
15 September 2015
Type
works
Overview
Sheffield City Council is seeking to appoint a suitable demolition contractor to undertake demolition works to several buildings in Sheffield city centre. These works comprise the controlled demolition and removal from site of the following structures; a) Grosvenor block - comprising the former Grosvenor House Hotel and associated buildings. b) Henry's Bar and Brew House buildings. c) Premier House block - comprising Premier House, former Athol Hotel and Coop Bank buildings. d) Pepper Pot block - comprising Pepper Pot and former HSBC bank buildings. e) 38 Carver Street f) Rockingham Works buildings, including 42 Wellington Street The works also require a façade retention scheme to be implemented along the Pinstone Street frontage of the Pepperpot Block. The works will include for; the erection of temporary security fences and hoardings, enclosing the full site boundary perimeters, allowing for points of access, erection of temporary security fences and hoardings to create safety exclusion zones and working areas beyond the designated site boundary which the Contractor may so require to suit their chosen method of working, provide 24hr manned security, erection of temporary scaffolding with protective dust proof and debris resistant material as required to undertake the chosen demolition process and also to provide protection of adjacent buildings, erection of temporary falsework systems with protective dust proof and debris resistant material as required to undertake the chosen façade retention process; clearing of all remaining asbestos and commercial, office, general and environmental waste from the buildings, soft stripping of the buildings, the protection of adjoining utility apparatus, highways, adjacent buildings and the users and visitors to thereof, the demolition of the buildings including foundations taking them down to levels as described in the accompanying drawings, protecting and maintaining existing structure required for the lateral buttress, diaphragm and propping support in order to retain the ground around the sites' perimeters and internally.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Sheffield City CouncilKey Dates
Published
15 September 2015
Submission deadline
21 October 2015
Notice type
tender
Source
contracts finder
Related Tenders
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
SPS-11030 replacement roofing on link corridors at HMP grampian
The Scottish Prison Service is hiring a contractor to replace the deteriorated metal roofing on the external link corridors at HMP Grampian, a prison in Scotland.
