Smyth Street Retaining Wall Repair
Wakefield CouncilEstimated Value
Up to £26,000
Deadline
13 October 2015
Published
21 September 2015
Type
works
Overview
Smyth Street is a one way street that takes traffic through onto Westgate in Wakefield city centre. Directly adjacent to Smyth Street is a retaining wall that retains a car park.
Approx. 17.50m length of the wall is of mass concrete construction with brickwork facing and the remaining 27.5m length is solely comprised of brickwork. Due to vegetation growth behind the brickwork in certain areas the brickwork has had to be taken down for safety reasons and requires reconstruction works.
A 7.35m length of the wall requires the construction of a mass concrete retaining wall and all associated components. The works comprise: · Preliminaries. · Traffic Management. · Site Clearance. · Demolition of concrete area (Ref: C1) on drawing No. BSE/SSRW/C/01. · Take down sections of existing pedestrian guardrail and set aside for re-use. · Removal of Vegetation. · Excavation works to allow for construction of mass concrete retaining wall. · Support of existing Amey street lighting duct. · Construction of proposed mass concrete retaining wall, including drainage works and backfill. · Construction of brickwork, including provision of ties. · Joint Installation. · Reinstatement of concrete area (Ref C2) on drawing No. BSE/SSRW/C/02. · Installation/re-use of kerbs. · Reinstatement of footway and cark park carriageway. · Installation of pedestrian guardrail.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Wakefield CouncilKey Dates
Published
21 September 2015
Submission deadline
13 October 2015
Notice type
tender
Source
contracts finder
Related Tenders
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
SPS-11030 replacement roofing on link corridors at HMP grampian
The Scottish Prison Service is hiring a contractor to replace the deteriorated metal roofing on the external link corridors at HMP Grampian, a prison in Scotland.