Refurbishment and Upgarde of Noup Head Lighthouse
Northern Lighthouse BoardEstimated Value
Up to £295,707
Deadline
6 May 2026
Published
4 June 2026
Type
Not specified
Full Description
The Works
The Civil and Electrical Bill of Quantities issued as part of this tender package detail all aspects of the project.
The main items of project work are as listed below: -
1.Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts’ guide for sampling, analysis and clearance procedures” and HSG264, Asbestos: The survey guide.
2.The Principal Contractor is expected to test the existing ‘HCL’ fall arrest system and re-certify it, if necessary, before use. The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes.
3.Establish temporary light.
4.Deliver all plant/materials/camp to NLB Oban packaged for helicopter underslinging.
5.Land plant/materials/camp on site and establish site.
6.Replacement of balcony handrail and metal deck floor in watch room.
7.Upgrade of electrical installation.
8.Upgrade of AtoN and power supply.
9.Full redecoration of the station.
10.Refurbishment of all NLB owned buildings including roof coverings.
11.De-mobilise site and clear all surplus project materials and plant, with the disposal of excess project materials to appropriate licensed and registered dumps. The contractor must have a responsible person in attendance who has successfully passed a recognised Dangerous Goods training course. This is to confirm the method of packaging for the transportation of any dangerous goods (either by land, air or sea) is correct and in accordance with the relevant standards and that the accompanying paperwork is signed. Loads to be prepared as per NLB guidance for underslinging and clearance by NLV Pharos/helicopter. Take delivery of loads at NLB Oban.
12.The Principal Contractor is to supply the NLB Project Engineer with ‘as-built’ information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations.
During the proposed works, it is essential that the Aids to Navigation are not prevented from operating at any stage that they are required. Details will be provided on the basic operation of these items to allow the Contractor to prevent his operatives from affecting the Aids to Navigation.
For detailed description of the works refer to the Bill of Quantities.
Programme
All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 23 June 2026. We require flexibility on the programme to be able to cope with many variables including tides, weather etc. On award we agree a final programme of works.
It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visits will be conducted on Wednesday 22 April 2026. Please request a site visit via Delta eSourcing attendance and names, mobile numbers of representatives attending site.
Requirements
1.Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts’ guide for sampling, analysis and clearance procedures” and HSG264, Asbestos: The survey guide.
11.De-mobilise site and clear all surplus project materials and plant, with the disposal of excess project materials to appropriate licensed and registered dumps. The contractor must have a responsible person in attendance who has successfully passed a recognised Dangerous Goods training course. This is to confirm the method of packaging for the transportation of any dangerous goods (either by land, air or sea) is correct and in accordance with the relevant standards and that the accompanying paperwork is signed. Loads to be prepared as per NLB guidance for underslinging and clearance by NLV Pharos/helicopter. Take delivery of loads at NLB Oban.
During the proposed works, it is essential that the Aids to Navigation are not prevented from operating at any stage that they are required. Details will be provided on the basic operation of these items to allow the Contractor to prevent his operatives from affecting the Aids to Navigation.
Submission Instructions
All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 23 June 2026. We require flexibility on the programme to be able to cope with many variables including tides, weather etc. On award we agree a final programme of works.
It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visits will be conducted on Wednesday 22 April 2026. Please request a site visit via Delta eSourcing attendance and names, mobile numbers of representatives attending site.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
RS Merriman Limited
£295,707
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
TRAC HLM Limited
£728,590
total awarded
- 2
Accted Ltd
3 contracts wonlatest 23 Jun 2026ends 21 Mar 2027£409,373
total awarded
- 3
Dart Industrial Services Ltd
2 contracts wonlatest 3 Jun 2026ends 28 Mar 2027£103,454
total awarded
- 4
Mrs J C Altham & Sons (Lancaster) Limited
2 contracts wonlatest 11 Sept 2025ends 12 Aug 2025£213,632
total awarded
- 5
Accted Engineering
2 contracts wonlatest 5 Sept 2025ends 1 Feb 2027£600,000
total awarded
TRAC HLM Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeStart free trial to downloadCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Northern Lighthouse BoardKey Dates
Published
4 June 2026
Submission deadline
6 May 2026
Notice type
award
Source
find a tender
Related Tenders
Supply and delivery of heavy and municipal vehicles
This is in relation to the renewal framework for the supply and delivery of Heavy and Municipal Vehicles, available for all 32 council areas in Scotland and Scotland Excel Associat
Libraries scotland enewspaper and emagazine
The aim of this tender is to provide a single national eMagazines and eNewpapers service to all thirty-two public library services for access by their members. Scottish Library and
Pupil equity funding (PEF) flexible framework
The Scottish Government has committed to providing additional funding in the form of Pupil Equity Funding (PEF), to schools as part of the Scottish Attainment Challenge programme.
Provision of homeless supported accommodation, outreach tenancy support and housing first services
Falkirk Council is setting up a framework to contract providers to deliver homeless support services, including interim accommodation for young people and adults, community tenancy support, and a Housing First programme.