Overview

The purpose of the project is to ensure that University of Exeter STEM education infrastructure in Cornwall can meet the demands of both the recent and proposed growth in student numbers and the requirements of research-led and industry-facing science education. In essence, it will enable the research model of multidisciplinary science to be realised in education and attract increased student recruitment.

The Renewable Energy Engineering Facility is a facility where students can experience directly how the knowledge gained in lectures or the laboratory is applied to a number of clean energy technologies in a real-world facility. Elements of the facility may also be shared with other campus users.

This new flagship facility will enable expansion of University of Exeter’s capacity at the Penryn Campus for individual and small group research projects and industrial networking and collab-oration. Users will the complete Renewable Energy teaching programmes including BSc Re-newable Energy and BEng/MEng Energy Engineering.

Additional details

The project has a maximum net construction value of £1.0m inclusive of Main Contractors OH&P and Preliminiaries.. The Building will achieve BREEAM excellent and incorporate best practice in design, maximising flexibility in the short term whilst providing adaptability in the long term, totalling a minimum of 267m2 GIFA.

Currently the client’s consultancy team (Atkins/Faithful+Gould) have completed the design to the end of RIBA Stage 3 and will be retained by the client to act as Employers Agent, QS and Technical Advisors. The client has appointed other consultants to assist in the design notably MACH Acoustics (Acousticians) and Ecofirst (BREEAM assessors).

Whilst MACH Acoustics will be retained by the client throughout the project it is now likely that Ecofirst commision will end at this stage and it will be for the contractor to appoint a BREEAM assessor to complete the process for RIBA Stage 4 through to completion. The successful contractor will be required to work col-laboratively with the client team to achieve the clients requirements.

Further information about the University’s requirements can be found at Schedule 2: including the specification Additional information: All tender documents are available for download by registering, for free, on the University's eTendering website InTend; link above. All correspondence regarding this opportunity are to be submitted via InTend.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open noticeStart free trial to download

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Contracts Finder

Visit
1

Open the original notice

Click the button below to view this tender on Contracts Finder

2

Find the submission method

Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)

3

Create an account

Register on the eSourcing platform for free — you'll need a company email and DUNS number

4

Download tender documents

Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates

5

Submit your response

Upload completed documents through the portal before the deadline — late bids are automatically rejected

Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.

Buyer Profile

University of Exeter
Typepublic body
Total tenders356
Total spend£180,097,441
View buyer profile

Key Dates

Published

30 September 2016

Submission deadline

21 October 2016

Notice type

tender

Source

contracts finder

Similar

Related Tenders

D
Open
ocds-h6vhtk-05a954 · tender

Road surface treatments - DPS

Dorset Council
worksSouth West

This Dynamic Purchasing System is for the provision of the following Road Surface Treatment Services: • Premium Surface Dressing • Micro Asphalting and Footway Surface Treatments •

£Up to £12,000,000
⏱ 27 Sept 2028
Posted · 12mo ago717d to apply →
S
Open
730d30e5-f328-4b66-be0e-1313c6b74cc8 · Contract

4 John street, maryport - lintel replacement and rendering

Storm Tempest Ltd
worksNorth WestSME friendly

Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e

££20,000 — £30,000
⏱ 5 Nov 2026
Posted · yesterday26d to apply →
N
Open
ocds-h6vhtk-06f872 · tenderUpdate

Joinery contractors framework

NHS Lanarkshire
worksScotland

NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.

£Up to £4,300,000
⏱ 19 Oct 2026
Posted · yesterday9d to apply →
A
Open
ocds-h6vhtk-078458 · tender

Angus rural mobility hub - enabling infrastructure works

Angus Council
worksScotland

The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f

£Up to £4,650,000
⏱ 9 Nov 2026
Posted · 2d ago29d to apply →