Provision of Planned Preventative Maintenance for the Chillers, AC Systems and Refrigeration
THE PIRBRIGHT INSTITUTEEstimated Value
Up to £177,666
Deadline
21 September 2026
Published
12 August 2026
Type
Not specified
Full Description
Contract Background
The contract is for single supplier for the provision of Chillers, Air Conditioning Systems and Refrigeration Maintenance Contract at The Pirbright Institute.
Scope of works
Work Package 1 – Chillers, Air Conditioning & Refrigeration Equipment
This works package is for a single supplier to service and or repair all refrigeration, air conditioning and associated systems at The Pirbright Institute.
Service visits should be arranged according to F gas regulations, site requirements and insurance inspections schedules.
The attached schedule (Schedule 5.C - Refrigeration Plant List) details the buildings, the details of the Chillers, Freezers and Air conditioning equipment and frequency of service visits required. A site plan showing the locations and relative sizes of these buildings is included in Schedule 5.D - Site Plan.
The contractor will be expected to advise on the condition of the equipment and provide details of any remedial works required following each service. Critical remedial works should be advised to Pirbright on the same day.
Quotations for non-critical remedial works should be provided to Pirbright within 1 week of a service visit.
The contractor should also allow for the supply of
- 1 x vacuum pump
- 1 x recovery machine
- 1 x set of gauges
- 1 x refrigerant leak detector
These will be kept in our restricted areas and will only be used by the contractor. These can be taken out of containment and returned to contractor at the end of the contract. This is to prevent the unnecessary passage and time-consuming decontamination for contractor’s tools when work is being done on our contained systems.
Within the first 6 months of the contract the contractor will be expected to provide a critical spares list and an itemised quotation for all systems.
Service reports should be left on site or received by site on the day of the service and test certificates should be received by site within one week of the service visit.
In addition to providing their own access equipment, it is expected that the supplier will include in their works, performing basic tasks required to access equipment such as lifting ceiling panels.
Work Package 2 – Emergency Call out Service
The supplier of works package 1 must also provide a 24-hour emergency call out service. With an engineer site attendance time of under 4 hours. All specification requirements that are associated with work package 1 also apply this work package.
Work Package 3 – Insurance Inspection Facilitation
The contractor will need to allow for the supply of an engineer to aid our insurance inspector with PSSR inspections on chillers. This can take up to 5 days per year.
Requirements
The attached schedule (Schedule 5.C - Refrigeration Plant List) details the buildings, the details of the Chillers, Freezers and Air conditioning equipment and frequency of service visits required. A site plan showing the locations and relative sizes of these buildings is included in Schedule 5.D - Site Plan.
The contractor will be expected to advise on the condition of the equipment and provide details of any remedial works required following each service. Critical remedial works should be advised to Pirbright on the same day.
In addition to providing their own access equipment, it is expected that the supplier will include in their works, performing basic tasks required to access equipment such as lifting ceiling panels.
The supplier of works package 1 must also provide a 24-hour emergency call out service. With an engineer site attendance time of under 4 hours. All specification requirements that are associated with work package 1 also apply this work package.
Submission Instructions
These will be kept in our restricted areas and will only be used by the contractor. These can be taken out of containment and returned to contractor at the end of the contract. This is to prevent the unnecessary passage and time-consuming decontamination for contractor’s tools when work is being done on our contained systems.
Site Viewing
Service visits should be arranged according to F gas regulations, site requirements and insurance inspections schedules.
Work Package 3 – Insurance Inspection Facilitation
The contractor will need to allow for the supply of an engineer to aid our insurance inspector with PSSR inspections on chillers. This can take up to 5 days per year.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
SCHNEIDER ELECTRIC LIMITED
£104,818
total awarded
- 2
Safety Gas Detection Limited
2 contracts wonlatest 29 Jun 2026£82,046
total awarded
- 3
TERRA NRG LIMITED
£83,189
total awarded
- 4
LUHRFILTER LIMITED
£293,500
total awarded
- 5
BECKMAN COULTER UNITED KINGDOM LIMITED
£282,000
total awarded
SCHNEIDER ELECTRIC LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeStart free trial to downloadCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
THE PIRBRIGHT INSTITUTEKey Dates
Published
12 August 2026
Submission deadline
21 September 2026
Notice type
tender
Source
find a tender
Related Tenders
HV cable procurement
UKAEA is undertaking refurbishment works to the J5 electrical infrastructure to support the ongoing operation and reliability of the Culham Campus power distribution network. As pa
Trunk road litter picking
Annual litter picking of the verges, laybys and slip roads of the Highways Agency’s trunk roads within the Borough of Test Valley area, with optional ad-hoc related activities that
Community suds planters project
Through Project Sponge, the council intends to deliver phase two of the downpipe planter programme. Phase two will include planter installations at the following locations: 1. Cipp
The replacement of the sports hall flat roof, edenbridge leisure centre
The District Council of Sevenoaks is looking for a qualified roofing contractor to replace the flat roof on the Sports Hall at Edenbridge Leisure Centre, while keeping the centre safe and as operational as possible during the works.