System operational · UK tenders
closed
ocds-h6vhtk-06e318 · tender

Provision of Planned Preventative Maintenance for the Chillers, AC Systems and Refrigeration

THE PIRBRIGHT INSTITUTE

Estimated Value

Up to £177,666

Deadline

21 September 2026

Published

12 August 2026

Type

Not specified

South EastGBopen

Full Description

Contract Background

The contract is for single supplier for the provision of Chillers, Air Conditioning Systems and Refrigeration Maintenance Contract at The Pirbright Institute.

Scope of works

Work Package 1 – Chillers, Air Conditioning & Refrigeration Equipment

This works package is for a single supplier to service and or repair all refrigeration, air conditioning and associated systems at The Pirbright Institute.

Service visits should be arranged according to F gas regulations, site requirements and insurance inspections schedules.

The attached schedule (Schedule 5.C - Refrigeration Plant List) details the buildings, the details of the Chillers, Freezers and Air conditioning equipment and frequency of service visits required. A site plan showing the locations and relative sizes of these buildings is included in Schedule 5.D - Site Plan.

The contractor will be expected to advise on the condition of the equipment and provide details of any remedial works required following each service. Critical remedial works should be advised to Pirbright on the same day.

Quotations for non-critical remedial works should be provided to Pirbright within 1 week of a service visit.

The contractor should also allow for the supply of

  • 1 x vacuum pump
  • 1 x recovery machine
  • 1 x set of gauges
  • 1 x refrigerant leak detector

These will be kept in our restricted areas and will only be used by the contractor. These can be taken out of containment and returned to contractor at the end of the contract. This is to prevent the unnecessary passage and time-consuming decontamination for contractor’s tools when work is being done on our contained systems.

Within the first 6 months of the contract the contractor will be expected to provide a critical spares list and an itemised quotation for all systems.

Service reports should be left on site or received by site on the day of the service and test certificates should be received by site within one week of the service visit.

In addition to providing their own access equipment, it is expected that the supplier will include in their works, performing basic tasks required to access equipment such as lifting ceiling panels.

Work Package 2 – Emergency Call out Service

The supplier of works package 1 must also provide a 24-hour emergency call out service. With an engineer site attendance time of under 4 hours. All specification requirements that are associated with work package 1 also apply this work package.

Work Package 3 – Insurance Inspection Facilitation

The contractor will need to allow for the supply of an engineer to aid our insurance inspector with PSSR inspections on chillers. This can take up to 5 days per year.

Requirements

The attached schedule (Schedule 5.C - Refrigeration Plant List) details the buildings, the details of the Chillers, Freezers and Air conditioning equipment and frequency of service visits required. A site plan showing the locations and relative sizes of these buildings is included in Schedule 5.D - Site Plan.

The contractor will be expected to advise on the condition of the equipment and provide details of any remedial works required following each service. Critical remedial works should be advised to Pirbright on the same day.

In addition to providing their own access equipment, it is expected that the supplier will include in their works, performing basic tasks required to access equipment such as lifting ceiling panels.

The supplier of works package 1 must also provide a 24-hour emergency call out service. With an engineer site attendance time of under 4 hours. All specification requirements that are associated with work package 1 also apply this work package.

Submission Instructions

These will be kept in our restricted areas and will only be used by the contractor. These can be taken out of containment and returned to contractor at the end of the contract. This is to prevent the unnecessary passage and time-consuming decontamination for contractor’s tools when work is being done on our contained systems.

Site Viewing

Service visits should be arranged according to F gas regulations, site requirements and insurance inspections schedules.

Work Package 3 – Insurance Inspection Facilitation

The contractor will need to allow for the supply of an engineer to aid our insurance inspector with PSSR inspections on chillers. This can take up to 5 days per year.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Likely incumbents

Suppliers who won similar work from this buyer in the last 5 years.

5 found
  1. 1

    SCHNEIDER ELECTRIC LIMITED

    3 contracts wonlatest 28 Nov 2025CH 01407228

    £104,818

    total awarded

  2. 2

    Safety Gas Detection Limited

    2 contracts wonlatest 29 Jun 2026

    £82,046

    total awarded

  3. 3

    TERRA NRG LIMITED

    2 contracts wonlatest 5 Jun 2026CH 14305249

    £83,189

    total awarded

  4. 4

    LUHRFILTER LIMITED

    2 contracts wonlatest 7 May 2026ends 16 Oct 2026CH 01172350

    £293,500

    total awarded

  5. 5

    BECKMAN COULTER UNITED KINGDOM LIMITED

    2 contracts wonlatest 21 Jan 2026CH 00640961

    £282,000

    total awarded

SCHNEIDER ELECTRIC LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open noticeStart free trial to download

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Buyer Profile

THE PIRBRIGHT INSTITUTE
Typepublic body
RegionUKJ25
Total tenders63
Total spend£4,918,326
View buyer profile

Key Dates

Published

12 August 2026

Submission deadline

21 September 2026

Notice type

tender

Source

find a tender