Orkney Harbours Masterplan Phase 1 - Scapa Deep Water Quay (SDWQ)
Orkney Islands Council (Harbour Authority)Estimated Value
Up to £5,997,945
Deadline
Not specified
Published
10 April 2025
Type
works
Overview
This procurement is for the design and construction of Scapa Deep Water Quay a new multi-use facility on the coastline of Mainland Orkney between Kirkwall and Holm, offering more than 600m of quayside and water depth of between 15m and 20m below Chart Datum: not only contributing to the need for laydown but also providing deep water access and berths that can accommodate the larger vessels coming on stream in the offshore wind industry. The facility is located on the east side of Scapa Flow, one of the largest natural deep water harbours in Northern Europe encompassing 125 square miles of sheltered water, a unique area that lends itself to wet storage, which is becoming a key requirement for floating turbine integration.
This procurement is for the appointment of a Main Contractor to provide Early Contractor Involvement (ECI) pre-construction services including, developing design, progressing key statutory consents and building up detailed construction costs. ECI pre-construction services is likely to be administered through via a NEC4 Professional Services Contract.
Following completion of the ECI pre-construction stage, the contract may, at the sole discretion of the Authority, proceed to an optional Contract Stage 2, which will include the construction stage of the contract under either a design and build contract likely to be under a NEC4 Engineering and Construction Contract (main Option A) or a “Build-Operate-Transfer” (“BoT”) type structure, pursuant to which the successful tenderer (or possibly a corporate joint venture vehicle formed between the Authority and the successful tenderer) would be granted a long lease of the land and marine assets, enter into a development and operation agreement relating to the project with the Authority, as well as agreement(s) for the provision of finance and the construction contract for construction of the project. The envisaged scope of the construction contract will be to deliver all works associated with the construction of a new deep water quay on the east side of Scapa Flow on the site of agricultural lands some 4km south of the existing Scapa Pier and approx. 1.1km west of the existing A961 public road.
Additional details
The works include land creation and reclamation, bulk earthworks cut/fill, new deep water quay construction, piling and reinforced concrete construction, dredging to -15mCD and -20mCD, pier fit out and all ancillary works to complete the development. Additional information: Further information on the project is available from https://orkneyharboursmasterplan.com/
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Acciona Construccion S.A.
£5,997,945
Jones Bros Ruthin (Civil Engineering) Co Ltd
£5,997,945
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Orkney Islands Council (Harbour Authority)Key Dates
Published
10 April 2025
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
Framework agreement for design, supply & installation of kitchens (lot 1) and bathrooms (lot 2) & associated works 2026 to 2030
This framework contract lets suppliers provide design, supply and installation services for kitchen and bathroom upgrades in public buildings from 2026 to 2030, covering everything from cabinets and worktops to showers and LED lighting.
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
Provision of motor control centres, systems integration and ICA services
Scottish Water is seeking to establish a multi-supplier Framework Agreement for the provision of Motor Control Centres (MCCs), Instrumentation, Control and Automation (ICA), System