New Hospital Programme - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract for Milton Keynes University Hospital
MILTON KEYNES UNIVERSITY HOSPITAL NHS FOUNDATION TRUSTEstimated Value
£538,000 – £0
Deadline
3 July 2026
Published
11 September 2026
Type
works
Overview
NHS England (NHSE) has concluded a competitive dialogue procurement under the Public Contracts Regulations 2015 for the establishment of the Hospital 2.0 Alliance Framework ("H2A Framework") and the Hospital 2.0 Alliance Agreement. These two instruments form the basis of a multi-supplier integrated delivery model created to deliver the New Hospital Programme (NHP).
The H2A Framework provides the mechanism for NHS Trusts to award Call-Off Contracts for schemes forming part of the New Hospital Programme using a Model Call-Off Contract. The Hospital 2.0 Alliance Agreement establishes the collaborative enterprise environment for NHSE, the Trusts, and the appointed H2A Contractors to foster alliance working and standardise design and delivery across the programme.
Following completion of the collaborative allocation process in accordance with the terms of the H2A Framework as procured and awarded, Milton Keynes University Hospital NHS Trust "the Trust" is now awarding the Call-Off Contract for Milton Keynes Hospital, utilising the H2A Framework and the Model Call-Off Contract. The value of the Call-Off Contract given in this notice reflects the estimated value of the Scheme for all stages.
Regulations cited
- Public Contracts Regulations 2015
Additional details
The terms of the Call-Off Contract provide for the services and works to be performed in stages pursuant to the terms of the Model Call-Off Contract. Stage Zero Services comprise all the early constructability and advisory works to be completed in Stage Zero as set out in Scope S215 (Stage Zero Services), and all other work, services and actions which the Call-Off Contract requires the Contractor to do during Stage Zero, with an estimated value of £538,000.
Stage One Services comprise all the pre-construction works to be completed in Stage One as set out in Scope S200 (Stage One Services), and all other work, services and actions which the Call-Off Contract requires the Contractor to do during Stage One. Stage Two Works comprise all the remaining design and construction works forming part of the Scope to be carried out during Stage Two, including all tests, services and actions which the Call Off Contract requires the Contractor to do during Stage Two. Progression from Stage Zero to Stage One and from Stage One to Stage Two is conditional on the relevant Notice to Proceed, the Trust and New Hospital Programme's approvals/governance
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
MORGAN SINDALL CONSTRUCTION & INFRASTRUCTURE LTD
£538,000
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
MILTON KEYNES UNIVERSITY HOSPITAL NHS FOUNDATION TRUSTKey Dates
Published
11 September 2026
Submission deadline
3 July 2026
Notice type
Contract
Source
contracts finder
Related Tenders
Shorepower civils works
Construction of concrete foundations for shorepower equipment, ducts, pits and some steel works. The works are required at Port Askaig and Kennacraig ferry terminals. All works are
Framework agreement for design, supply & installation of kitchens (lot 1) and bathrooms (lot 2) & associated works 2026 to 2030
This framework contract lets suppliers provide design, supply and installation services for kitchen and bathroom upgrades in public buildings from 2026 to 2030, covering everything from cabinets and worktops to showers and LED lighting.
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
