Midlands Rail Hub Alliance – Alliance Partners (Non-Signalling Disciplines)
Network Rail Infrastructure LtdEstimated Value
Up to £103,509,864
Deadline
Not specified
Published
19 December 2025
Type
works
Overview
The key objectives of MRH are to improve connectivity across the Midlands region; boost economic growth; maximise use of HS2 to London through interchange in Central Birmingham; improve access to jobs, leisure, healthcare, and education; optimise the utilisation of station capacity in central Birmingham; and make rail journeys more attractive and encourage modal shift to rail. The scope of the Alliance includes, but is not limited to, the design and build of: new platforms and sidings; up to two new chords into Birmingham Moor Street; widening of existing viaduct; power supply upgrades; new freight loops; new overhead line equipment (OLE) and various signalling works including the re-modelling of existing layouts.
The MRH programme consists of multidisciplinary infrastructure interventions are split over three sections described as West, Central and East according to the additional train services that they enable. The scope is currently divided into eight interventions across the three sections: West & Central Midlands interventions at Snow Hill, King’s Norton to Barnt Green (and interventions at King’s Norton and Barnt Green) and Birmingham Bordesley to Moor Street are in the process of securing final funding approval and are intended to be the initial deliverables.
Additional interventions are also in scope of MRH and may be delivered subject to funding decisions and design development including West & Central interventions at Worcester to Hereford and Stoke Works Junction and East Midlands interventions at Water Orton and Nuneaton to Wigston. East interventions are at an earlier stage of design development and are intended to form part of a separate business case; these interventions are subject to future funding decisions.
Key points
- Network Rail (having two roles – one as a member of the Alliance and the other as Client);
- Multi-Disciplinary Partner(s) (covering all disciplines except signalling, power and communication roles set out in the Alliance scope document) appointed pursuant to this Contract Award Notice; and
- A Signalling Partner (covering the signalling, power and communication roles set out in the Alliance scope document) appointed via a separate sourcing event.
Additional details
It is also envisaged that the West intervention of Worcester-Hereford will be delivered by the Alliance but does not form part of the initial deliverables and is dependent upon as yet uncommitted renewals in the Worcester area. The total Alliance Anticipated Final Cost (AFC) excluding VAT is circa £1.1m--£1.5bn GBP.
The AFC is split between the initial deliverables and additional interventions as follows: - Initial deliverables (predominantly interventions in West and Central) are circa: - Multi-Disciplinary (non-signalling, power and communications): £700m-£800m GBP (excluding VAT) - Signalling, power and communications; £150m-£250m GBP (excluding VAT) - Additional interventions (predominantly East) are circa: - Multi-Disciplinary (non-signalling power and communications: £250m-£350m GBP (excluding VAT); - Signalling, power and communications; £50m-£100m GBP (excluding VAT) These figures are indicative only. Network Rail has appointed all Partners to the Alliance using a modified NR35 Alliance Contract (based on the NEC4 Alliance Contract). Network Rail and each of the Partners have signed one Alliance contract.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
VolkerRail Limited
£103,509,864
Laing O'Rourke Delivery Limited
£103,509,864
AtkinsRealis UK Limited
£103,509,864
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
RTG Rail Services
£318m
total awarded
- 2
C Spencer Limited
£114m
total awarded
- 3
Amalgamated Construction Ltd
£256m
total awarded
- 4
Capel (C.S) Ltd
£212m
total awarded
- 5
Total Property Support Services Ltd
£212m
total awarded
RTG Rail Services is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Network Rail Infrastructure LtdKey Dates
Published
19 December 2025
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
SPS-11030 replacement roofing on link corridors at HMP grampian
The Scottish Prison Service is hiring a contractor to replace the deteriorated metal roofing on the external link corridors at HMP Grampian, a prison in Scotland.