London Gateway - Second Rail Terminal Phase 2
LONDON GATEWAY PORT LIMITEDEstimated Value
Up to £15,000,000
Deadline
13 April 2026
Published
17 March 2026
Type
Not specified
Overview
DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience, and support the continued growth of DP Worlds sustainable, low carbon logistics solutions.
This expansion represents a strategic enhancement of the port's intermodal capability, enabling faster, more efficient movement of goods across the UK and supporting national objectives for greener freight transport. The new terminal will play a key role in accommodating future demand and maintaining London Gateway's position as a world class logistics and supply chain hub.
The Scope of Works covered under this tender include, but are not limited to, the following key elements: Permanent Way Works Construction of new railway infrastructure to serve the second terminal including plain line track, and associated components in a phase installation sequence delivering five new sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of 21 new switches and crossings (S&C) required to connect the new terminal to the existing rail network corridor as well as providing more route paths for trains entering and exiting the existing eastern rail terminal.
Additional details
Civil Engineering Works Installation of a circa 850m long reinforced concrete crane rail beam with pre-cast concrete pile foundations and its associated mechanical chambers to allow Rail Mounted Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation preparation, track drainage and utility diversions necessary to support the new terminal infrastructure.
Construction of numerous ancillary civils foundation bases, walkways, cable routes and under track crossings for the new signalling, telecommunications and electrical plant equipment, shunters cabin and REB building. Telecommunications Works Installation of new and relocation of existing Operational Telecoms and SiSS systems assets including CCTV cameras, signal post and point zone telephones and the shunters panel concentrator.
Signaling Works Provision of new and relocation of existing signaling assets, including lineside equipment, control system modifications in the form of new Shunters Cabin housing an updated control panel to operate both rail terminals, and associated REB for the signaling system interlocking. These assets will be constructed in a staged delivery to align with the permanent way phasing, to ensure full operational compatibility.
Installation of new signaling track circuits to both the western and eastern terminals will enable operation of both facilities from the one new control panel. Testing, commissioning and integration of all new rail systems with existing operational infrastructure as well as update to the Upminster IECC workstation screens.
Electrical and Plant Works New power supplies to the various disciplines line side equipment, shunters cabin and REB, as well as new points heating assets for both the western and existing eastern rail terminal S&C units. Interfaces and Integration Management of all interfaces with existing rail infrastructure, port operations, utilities, and third party stakeholders.
Development of staging plans to minimise operational disruption and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction.
Project Goals Upon completion, the new rail terminal will provide; increased rail served capacity for containerised freight, enhanced operational flexibility and resilience, deliver infrastructure capable of supporting robotic next generation RMGC equipment and improved efficiency as well as reduce the ports carbon impact through expanded rail freight capability. Programme: It is intended that the Rail works will commence in July 2026 for a duration of 12 months.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
GOBION CONSTRUCTION LTD
£52m
total awarded
- 2
Terberg Benschop B.V.
1 contract wonlatest 23 Sept 2026ends 8 Feb 2028€2m
total awarded
- 3
Movella Oy
1 contract wonlatest 12 Jun 2026ends 25 Jun 2027€1m
total awarded
- 4
RYEBRIDGE LIMITED
£2m
total awarded
- 5
OCS Group UK Ltd
1 contract wonlatest 1 Apr 2026ends 22 May 2028£452,000
total awarded
GOBION CONSTRUCTION LTD is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
LONDON GATEWAY PORT LIMITEDKey Dates
Published
17 March 2026
Submission deadline
13 April 2026
Notice type
tender
Source
find a tender
Related Tenders
Notice of intention to award under the public health framework - live well preventative health services
This is a Provider Selection Regime (PSR) intention to award notice. The awarding of this contract is subject to the Health Care Services (Provider Selection Regime) Regulations 20
Provision of aerial survey of the UK rail network - lidar (light detection and ranging) and aerial photography
Network Rail require an Aerial Survey of the UK rail network, principally consisting of LiDAR (Light Detection and Ranging) and RGB (Red, Green and Blue) data capture. There is a d
Healthy weight service
This notice relates to the process set out in Regulation 10 of The Health Care Services (Provider Selection Regime) Regulations 2023, Most Suitable Provider Process (MSP). The Lond
QTS consultanst framework
As a result of this tender, the Authority is seeking to create: A framework incorporating 12 lots Lot 1 - Architects Lot 2 - Cost Consultants Lot 3 - M&E Engineering Lot 4 - Buildi