Housing, Regeneration and Demolition (H3) Framework

Estimated Value

Up to £1,250,000,000

Deadline

17 June 2026

Published

8 May 2026

Type

works

GBopenCPV: 45000000
CategoryConstruction

Overview

LHCPG is seeking to establish a multi-supplier Framework Agreement for the provision of housing, regeneration, demolition, remediation and enabling works across the United Kingdom. The Framework will support the delivery of: New build residential developments Retrofit and estate regeneration Demolition services Remediation and enabling works Defence housing and secure environment works Appointed suppliers will deliver works as Principal Contractor, including associated design responsibilities, in compliance with relevant statutory, regulatory and funding requirements.

This workstream covers the delivery of retrofit, refurbishment and estate regeneration (Over 2m value band) to existing housing across the UK including houses, apartments as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. The Retrofit works may include but are not limited to (i) Internal modernisation, extensive redecoration, (ii) Re-wiring, (iii) Replacing space heating systems, (iv) Replacing doors and windows, (v) Relacing Kitchens and Bathrooms (vi) Essential repairs to the building fabric (vii) Improvements to the energy efficiency of the building (viii) The extension or conversion of an existing building.

The estate Regeneration works primarily target the broader physical environment and may include but not limited to (i) Introduction of Landscaping (ii) Repairs to infrastructure (iii) Play areas and equipment. This workstream covers the delivery of full and partial demolition works (Over 1m value band) across a range of residential and associated non-residential assets, including site clearance and preparation for redevelopment.

Eligibility & compliance

Suppliers must demonstrate the capability to operate within secure environments, including maintaining appropriate certifications (such as cyber security and information management standards), and ensuring continuity of suitably cleared personnel throughout the lifecycle of each project.

Additional details

Works may include soft strip, structural demolition, removal of below-ground obstructions, hazardous material remediation, service disconnections and diversions, and associated enabling works. Appointed companies will be required to deliver a complete end-to-end service, including demolition planning, temporary works, environmental management and site handover, ensuring all activities are carried out in compliance with relevant legislation, health and safety requirements and recognised industry standards.

This workstream covers the delivery of new build residential (1 - 10 Units) developments across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives.

Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements. This workstream covers the delivery of new build residential developments (26 to 50 Units) across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation.

Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives. Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements.

This workstream covers the delivery of new build residential developments (26 to 50 Units) across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives.

Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements. This workstream covers the delivery of new build residential developments (Over 50 Units) across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation.

Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives. Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements.

This workstream covers the delivery of new build residential developments (Housing above 18m in height) across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives.

Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements. This workstream covers the delivery of retrofit, refurbishment and estate regeneration (0 to 2m value band) to existing housing across the UK including houses, apartments as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation.

The Retrofit works may include but are not limited to (i) Internal modernisation, extensive redecoration, (ii) Re-wiring, (iii) Replacing space heating systems, (iv) Replacing doors and windows, (v) Relacing Kitchens and Bathrooms Page 11 to 25 (vi) Essential repairs to the building fabric (vii) Improvements to the energy efficiency of the building (viii) The extension or conversion of an existing building. The estate Regeneration works primarily target the broader physical environment and may include but not limited to (i) Introduction of Landscaping (ii) Repairs to infrastructure (iii) Play areas and equipment.

This workstream covers the delivery of full and partial demolition works (Over 1m value band) across a range of residential and associated non-residential assets, including site clearance and preparation for redevelopment. Works may include soft strip, structural demolition, removal of below-ground obstructions, hazardous material remediation, service disconnections and diversions, and associated enabling works.

Appointed companies will be required to deliver a complete end-to-end service, including demolition planning, temporary works, environmental management and site handover, ensuring all activities are carried out in compliance with relevant legislation, health and safety requirements and recognised industry standards. This workstream covers the delivery of site remediation works required to prepare land for development, including the treatment and management of contaminated land, ground improvement, and associated site preparation activities.

Works may include the development and implementation of remediation strategies, removal or containment of contaminants, gas protection measures, verification and validation reporting, and the safe management of materials. Enabling works may include site clearance, earthworks, utility disconnections, ecological and arboricultural protection measures, and the establishment of site access and security.

Appointed companies will be responsible for delivering a fully managed service, including the preparation of remediation method statements, compliance with statutory and environmental requirements, and provision of verification documentation to support regulatory approval and site handover. This workstream covers the delivery of enabling works required to prepare land for development, including the treatment and management of contaminated land, ground improvement, and associated site preparation activities.

Works may include the development and implementation of remediation strategies, removal or containment of contaminants, gas protection measures, verification and validation reporting, and the safe management of materials. Enabling works may include site clearance, earthworks, utility disconnections, ecological and arboricultural protection measures, and the establishment of site access and security.

Appointed companies will be responsible for delivering a fully managed service, including the preparation of remediation method statements, compliance with statutory and environmental requirements, and provision of verification documentation to support regulatory approval and site handover. This workstream covers the delivery of new build housing, refurbishment, and associated enabling works within defence and secure environments across the UK, including Ministry of Defence (MoD) accommodation and related infrastructure.

Works may include residential development, site preparation, infrastructure and estate regeneration activities, delivered in accordance with project-specific requirements and operational constraints. Appointed companies will be required to deliver a fully managed service, including compliance with enhanced security, information management and personnel vetting requirements, alongside all relevant statutory, technical and government standards.

AI Analysis

Get a detailed breakdown of requirements, key tasks, and tips for reading this tender

Search for tenders
SponsoredEst. 2010
Gladstone & Co.Accountants & Tax Advisers · London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Sign up freeto open notice

A free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Key Dates

Published

8 May 2026

Submission deadline

17 June 2026

Notice type

tender

Source

find a tender

Similar

Related Contracts

H
Open
ocds-h6vhtk-06ee10 · tender

Fire safety and planned programme works (interim)

Harlow Council
works

The Works comprise outstanding and emerging FRA remedial actions and directly associated or consequential fire-safety works. The scope includes passive fire protection and compartm

£Up to £15,000,000
29 Sept 2026
Posted · today32d to apply
A
Open
8a4922ab-f26c-4229-acf5-47feda729b9d · Contract

DNWP0073 - lot 1B/In-SEP ID - controlled area initial decommissioning operations

Altrad AtkinsRealis Joint Venture (A2R JV)
worksAny regionSME friendly

The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form

££10,000,000 — £20,000,000
17 Sept 2026
Posted · today21d to apply
E
Open
ocds-h6vhtk-06edd6 · tender

PS-26-151 - housing maintenance & owner occ framework (PRJ0013890)

East Ayrshire Council
works

East Ayrshire Council have an expansive portfolio of domestic and owner occupied properties. The Council's tenanted properties are maintained primarily by an in-house team. Housing

£Up to £4,500,000
29 Sept 2026
Posted · today33d to apply
K
Open
fe55e276-5324-4eb6-b31f-f9922bb3d9d8 · Contract

Manchester international airport - demolition works

Kier Transportation - CP7 NWC
worksNorth West,Any regionSME friendly

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used w

££50,000 — £100,000
3 Sept 2026
Posted · today7d left