Highways Verge Works
North of A171
Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol. 6, S3, part 5, sect. 9
Lined with geotextile and surfaced with 150mm compacted type 1 aggregate and finished with a compacted 25mm layer of 6mm- dust.
Install drainage provision to prevent surface water discharging onto the highway
Extension of tarmac area and extension of dropped kerb from field access to crossing area (approx. 4m x 1m)
Crossing to be constructed in accordance with Standard Detail B4 and E6W
Existing highway drainage grip relocated west of the proposed crossing
Surface levelling along bridleway route, relocation of stone mound
South of A171
Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol. 6, S3, part 5, sect. 9
Lined with geotextile and surfaced with 150mm compacted type 1
aggregate and finished with a compacted 25mm layer of 6mm-dust.
Provision to prevent surface water discharging onto the highway
Installation of 5m of dropped kerb to the highway surface
Crossing to be constructed in accordance with Standard Detail B4 and E6W
Ancillary Works
Fencing
Erection of approximately 150m additional stock fence (15cm x 15cm uprights centred at 1.5m) as shown on plan 2
Gates
Installation of 1 no. 5'6ft bridle gate and 2 no. 12ft field gate and side rails to leave stock proof at location shown on plan 2
Road Surfacing
Installation of a 10m wide band of high friction surfacing to HD37 (DMRB 7.5.2) the width of the carriageway (similar colour to the carriageway)
Signage
Erection of 2 no. triangular warning signs to be erected to warn drivers eastbound and westbound of the crossing point to DMRB Volume 8 Section 2 Part 2 (TD 26/17)
Dry Stone Wall
Dismantle and rebuild approximately 10 m of Dry Stone Wall plus supply stone for and construct an additional 10m of stone wall in accordance with plan 2
Spoil Management
Excess spoil to be relocated to Skelder top car park and used to re-profile existing bunds
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeStart free trial to downloadCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
North York Moors National Park AuthorityKey Dates
Published
6 June 2018
Submission deadline
29 June 2018
Notice type
tender
Source
contracts finder
Related Tenders
Civil engineering & infrastructure works
NEPO is awarding a multi-contractor, multi-lot framework agreement for civil engineering and infrastructure works. This framework agreement provides a diverse range of civil engine
Framework agreement for design, supply & installation of kitchens (lot 1) and bathrooms (lot 2) & associated works 2026 to 2030
This framework contract lets suppliers provide design, supply and installation services for kitchen and bathroom upgrades in public buildings from 2026 to 2030, covering everything from cabinets and worktops to showers and LED lighting.
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.