GB-Edinburgh: Refurbishment & Upgrade of Maughold Head Lighthouse
Northern Lighthouse BoardEstimated Value
£100,000 – £500,000
Deadline
21 September 2016
Published
26 August 2016
Type
works
Overview
1.In advance of the starting refurbishment works on site the Principal Contractor is to provide an asbestos survey and report on all NLB owned property via a UKAS accredited asbestos surveying company. Any asbestos containing materials that are found from sample testing to be recorded along with recommendations for planned removal using the services of a licenced asbestos contractor.
Tendering Contractor’s to ensure Asbestos surveying company is prepared to go to site as soon the successful Principal Contractor has confirmed by NLB Procurement. 2.In advance of the Principal Contractor starting refurbishment works on site NLB Engineering Technicians will establish on the external balcony of the tower a temporary light. 3.Principal Contractor to be offered the use of the small NLB owned welfare bothy throughout the site works. 4.It is anticipated that dry storage of project materials can principally be located within the existing standby battery building (ex. old fog signal housing) 5.Contractor to provide temporary protective measures around the static shrouded glass lens (as described in 2 above), in liaison and agreement with NLB representative on site, before erecting a temporary access scaffolding to the sides and above the lens for the contractor’s personnel to be able to paint the dome and other areas safely at height. 6.De-commission and remove the existing Electrical Industrial system that operates the optic / monitoring system (i.e.) identified cubicles etc. As part of this process the Principal Contractor is to provide a further demolition asbestos survey / report from the same UKAS appointed asbestos company, to identify any new asbestos containing materials for appropriate action and disposal. 7.Contractor to install a new upgraded and modern electrical optic / monitoring system to NLB specifications, 8.All NLB identified surplus de-commissioned Industrial Electrical Equipment waste (i.e.) cubicles, to be removed from site and disposed of. 9.The external paint surfaces over the height of the tower are in relatively good condition so will not be painted, however there are some areas that need attention. 10.The small NLB Welfare block is independently located about 100m from the Tower on land and buildings owned by others. No internal refurbishment is required.
Small external refurbishment is required with some external wall / roof painting. 11.De-mobilise site and clear all ex.project materials and plant, with the disposal of excess project materials to appropriate licensed and registered dumps. 12.Principal Contractor to supply the NLB Project Engineer with ‘as-built’ information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with CDM Regulations. Site visits will be conducted on Wednesday 28 September 2016.
Contact & helpdesk
Please contact Ruth Millan, Procurement@nlb.org.uk to confirm attendance.
Additional details
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement. The tender documents can be downloaded from out buyer profile http://nlb.g2b.info/, other information
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeStart free trial to downloadCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Northern Lighthouse BoardKey Dates
Published
26 August 2016
Submission deadline
21 September 2016
Notice type
tender
Source
contracts finder
Related Tenders
Framework agreement for design, supply & installation of kitchens (lot 1) and bathrooms (lot 2) & associated works 2026 to 2030
This framework contract lets suppliers provide design, supply and installation services for kitchen and bathroom upgrades in public buildings from 2026 to 2030, covering everything from cabinets and worktops to showers and LED lighting.
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
Provision of motor control centres, systems integration and ICA services
Scottish Water is seeking to establish a multi-supplier Framework Agreement for the provision of Motor Control Centres (MCCs), Instrumentation, Control and Automation (ICA), System
