Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South)
Renfrewshire CouncilEstimated Value
Up to £34,714,650
Deadline
Not specified
Published
27 August 2025
Type
works
Overview
The Advanced Manufacturing Innovation District Scotland (AMIDS) South plays a key role in completing Renfrewshire Council’s proposed network of infrastructure projects by connecting the town of Paisley (population, circa 77,000), the largest local settlement, by all modes to AMIDS some 3km distance from the town centre and other nearby settlements of Renfrew and Inchinnan (and beyond) and providing direct links to existing and planned active travel routes (ATR). The over-arching AMIDS South project objectives are: Stimulation of increased economy and development activity in Paisley and the wider area, Attract and retain an increased working age population in the local area, Improve strategic, gateway and local access connections and perceptions between: Paisley Town Centre, Paisley Gilmour Street, AMIDS, /Glasgow Airport and the neighbouring communities.
Improve integration of the area and key institutions (such as West College Scotland): north and south of Paisley Gilmour Street and east and west of the White Cart and Capture the benefits of major infrastructure improvements and associated development for Paisley Town Centre, Paisley, Renfrewshire and reinforce the value of planned investment at AMIDS. The AMIDS south project will provide new and more direct links to the proposed new Secondary School and Community Campus for the communities west of the White Cart Water.
The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure – North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m – East to West Route. For details refer to drawing numbers: AMIDSS-AMEY-HGN-DR-CH-000002 to 000004 – General Arrangements Main components are summarised in Appendix 1 – Statement of Requirements and “AMIDSS Scope Part 1 - Final - Stage 1” as contained in the Suppliers Attachment Area.
Regulations cited
- Public Contracts (Scotland) Regulations 2015
Additional details
General information on the Project can be found here: Paisley to AMIDS transport links - Renfrewshire Website The AMIDS South construction works contract is intended to be in the form of an NEC4 Engineering and Construction Contract Option A Fixed Priced Contract with an Activity Schedule including X optional and Z additional and amended clauses.
The works are primarily Employer’s design with Contractor’s Design Portions. In the event the Council requires to enter into negotiation to improve tenders, the Council may consider including additional elements of Contractor’s Design such as the White Cart Crossing bridge.
The construction programme is anticipated to be 24 months with a 24 months defects period. There will be a key date for completion of the works contained in Zone X which includes the pedestrian and vehicular access for the new Paisley Grammar School Campus by 30 May 2026.
Planning consent for the project is in place and the Contractor will be directly responsible for discharging a number of planning consent conditions as detailed in the Scope. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure – North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m – East to West Route.
Full details of the works can be found in the document titled “AMIDSS Scope Part 1 - Final - Stage 1”. The draft conditions of contract are included with the ITP documents.
These may be subject to change as the scope, drawings and specifications for the work are finalised. Final versions will be published in the ITT.
Further information on the negotiation process will be provided to Bidders selected to submit a tender in the initial ITT. Additional information: The Council is conducting the procurement process under the competitive procedure with negotiation in accordance with the Public Contracts (Scotland) Regulations 2015 and the Council's Standing Orders Relating to Contracts. The SPD Information and Instructions, contained in the Suppliers Attachment Area on the PCS-Tender System, provides Bidders with detailed information on the Project.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Farrans Construction trading as a division of Northstone (NI) Limited
£34,714,650
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Renfrewshire CouncilKey Dates
Published
27 August 2025
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
Provision of motor control centres, systems integration and ICA services
Scottish Water is seeking to establish a multi-supplier Framework Agreement for the provision of Motor Control Centres (MCCs), Instrumentation, Control and Automation (ICA), System
Kishorn port - phase 1B - east quay development
Kishorn Port Limited (KPL) own and operate the drydock facility at Kishorn. The existing drydock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectare