Estimated Value
Up to £600,000,000
Deadline
Not specified
Published
24 March 2026
Type
works
Overview
Extension of the Civil Engineering Framework (Scotland) contract by 24 months, with the option to extend a further 24 months. The justification for the framework extension is on the basis of Regulation 72 (1) (c).
There is no change to framework scope or value. A VEAT notification was published previously with a 28 day standstill period.
The extension is required due to the current level of uncertainty around funding for public civil engineering projects in Scotland within the framework’s call-off value range of 5M-100M GBP. There is no certainty in terms of timelines for projects currently in the pipeline.
Additional details
As a result of this uncertainty, no call-offs have been undertaken and there is an inability to scope a successor arrangement to the current Civil Engineering Framework (Scotland). It is anticipated, that by extending the framework by 24 months, with the option to extend a further 24 months should uncertainty persist, this will allow for greater clarity around future pipeline and service needs.
This should enable a future procurement to have an increased level of pipeline certainty and future demand. Due to the pausing or delay of projects 2024/2025, the anticipated spend through the framework Lots has been significantly below the stated contract value within the published Contract Notice – currently no call-off contracts have been undertaken.
It is anticipated that value of the Framework Contract will not exceed the original value in the Contract Notice. The value referred to in this notice within sections V.2.4 and VII.1.6 refers to the initial value of the original framework procurement. There is no proposed modification to the overall nature of the framework.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Amalgamated Construction Ltd
£600,000,000
Farrans Construction trading as a division of Northstone (NI) Ltd.
£600,000,000
Balfour Beatty Civil Engineering Ltd
£600,000,000
Galliford Try Construction Limited
£600,000,000
Graham
£600,000,000
Morgan Sindall Construction & Infrastructure Ltd
£600,000,000
Taziker Industrial
£600,000,000
RJ McLeod (Contractors) Ltd
£600,000,000
Farrans Limited
£600,000,000
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Balfour Beatty Civil Engineering Ltd
1 contract wonlatest 18 Dec 2025£400m
total awarded
- 2
Galliford Try Construction Limited
1 contract wonlatest 18 Dec 2025£400m
total awarded
- 3
Graham
1 contract wonlatest 18 Dec 2025£400m
total awarded
- 4
Morgan Sindall Construction & Infrastructure Ltd
1 contract wonlatest 18 Dec 2025£400m
total awarded
- 5
RJ McLeod (Contractors) Ltd
1 contract wonlatest 18 Dec 2025£400m
total awarded
Balfour Beatty Civil Engineering Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Scottish GovernmentKey Dates
Published
24 March 2026
Submission deadline
Not specified
Notice type
awardUpdate
Source
find a tender
Related Tenders
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
Provision of motor control centres, systems integration and ICA services
Scottish Water is seeking to establish a multi-supplier Framework Agreement for the provision of Motor Control Centres (MCCs), Instrumentation, Control and Automation (ICA), System
Kishorn port - phase 1B - east quay development
Kishorn Port Limited (KPL) own and operate the drydock facility at Kishorn. The existing drydock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectare