System operational · UK tenders
Awarded
ocds-h6vhtk-055482 · award

Civil Engineering Framework

Forestry and Land Scotland

Estimated Value

£250,000 – £5,600,000

Deadline

8 December 2025

Published

16 April 2026

Type

works

ScotlandGBopenCPV: 45220000
CategoryConstruction

Overview

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in the North region of Scotland's national forests and land to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in Moray and Aberdeenshire to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in Tay to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

Key points

  • Maintenance and Small-Scale Works (21 Lots)
  • Large-Scale Works and Grading (14 Lots)
  • Crushing (9 Lots)
  • Bridge Maintenance and New Bridges (10 Lots)
  • Panel Bridges (1 Lot)

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • Road maintenance including rutting, potholes etc
  • Drainage works including ditching, culvert installation and replacement
  • Construction and maintenance of harvesting facilities
  • Vegetation control
  • Construction and maintenance of turning points and passing places

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Key points

  • New road construction
  • Road upgrading
  • Infrastructure associated with new road construction and upgrade such as drainage, culverts, harvesting facilities
  • Vegetation Control
  • Large-scale maintenance works
  • Public road bellmouth construction and maintenance
  • Grading works

Additional details

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in Lochaber to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in West Argyll to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in the Central region of Scotland's national forests and land to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in Dumfriesshire and Borders to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in Galloway, Ayrshire, Solway and Stewartry to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

The Client produces road stone from its own quarries to be used on its road network for new road construction, upgrading and maintenance. This Lot is for the provision of the crushing and/or screening of rock in Client quarries in Arran to produce various products for use in Client forest road construction, road upgrade and road maintenance projects.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in the North region of Scotland's national forests and land. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in Moray and Aberdeenshire. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in Tay. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in Lochaber. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in West Argyll. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in Cowal and Trossachs. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in the Scottish Lowlands. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in Galloway, Ayrshire, Solway and Stewartry. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in Arran. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

This Lot is for the provision of panel bridge construction, installation and removal across all of Scotland's national forests and land. The Client’s panel bridge stock is primarily intended to facilitate 44T vehicle access.

This Lot is for the provision of bridge construction and maintenance of the Client's bridge infrastructure in Dumfriesshire and Borders. The Client’s bridge infrastructure varies from small footbridges to bridges which facilitate 44T timber haulage.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Award Details

A.A. & D. Fraser Ltd

£5,600,000

A.C.T Heritage Ltd

£5,600,000

CR Contractors Tain Limited

£5,600,000

GS Campbell (Contractors) Ltd

£5,600,000

john mackay ltd

£5,600,000

Murray Peat Contracting

£5,600,000

Colin Clark Contracts

£5,600,000

D.N. Munro Plant Hire Ltd

£5,600,000

G Simpson Builders Ltd

£5,600,000

Robertson Fencing LTD - t/a Taiga Upland

£5,600,000

Tam Shilliday Plant Hire and Groundworks Ltd

£5,600,000

Wilken Plant Contractors ltd

£5,600,000

Currie contractors Cullen ltd

£5,600,000

Scotplant Contractors Ltd

£5,600,000

A W Bayne Plant Hire Ltd

£5,600,000

Eoin Harrold

£5,600,000

AMD Contract Services Ltd

£5,600,000

Castleview Plant

£5,600,000

BigCat Contracts

£5,600,000

Geo-Rope LTD

£5,600,000

Maccoll(Appin)ltd

£5,600,000

A & L McCrae Ltd

£5,600,000

GTR Contracts Ltd

£5,600,000

G McNaughton & Son (Plant Hire) Ltd

£5,600,000

ICD Contracting Limited

£5,600,000

McFadyens Contractors (Campbeltown) Ltd

£5,600,000

BM Groundworks

£5,600,000

MAM Contracting

£5,600,000

Luce Bay Plant Hire Ltd

£5,600,000

Ewart Excavations

£5,600,000

Walter Marchbank Ltd.

£5,600,000

Solway Plant Hire Ltd

£5,600,000

Wct services ltd

£5,600,000

Howie Forestry Solutions

£5,600,000

Armitage Groundworks Ltd

£5,600,000

Murchie Sand & Gravel Ltd

£5,600,000

Gregorys Plant & Civils Ltd

£5,600,000

Amalgamated Construction Ltd

£5,600,000

MELLEX GROUP LTD

£5,600,000

Miller Plant Ltd

£5,600,000

Eagle Recycling (UK) Limited

£5,600,000

Cross Civils & Construction Services Ltd

£5,600,000

O’Kane Equipment Solutions Ltd

£5,600,000

Walker Groundworks Ltd

£5,600,000

Track Civil Engineering Solutions

£5,600,000

Mackenzie Construction Ltd

£5,600,000

CR Contracting North LTD

£5,600,000

Geo-Structural Ltd

£5,600,000

Munro Civil Engineering Ltd

£5,600,000

David Hardie Engineering Limited

£5,600,000

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open noticeStart free trial to download

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Buyer Profile

Forestry and Land Scotland
Typepublic body
RegionUKM
Total tenders41
Total spend£562,611,913
View buyer profile

Key Dates

Published

16 April 2026

Submission deadline

8 December 2025

Notice type

award

Source

find a tender

Similar

Related Tenders

N
Open
ocds-h6vhtk-06f872 · tenderUpdate

Joinery contractors framework

NHS Lanarkshire
worksScotland

NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.

£Up to £4,300,000
⏱ 19 Oct 2026
Posted · 2d ago8d to apply →
A
Open
ocds-h6vhtk-078458 · tender

Angus rural mobility hub - enabling infrastructure works

Angus Council
worksScotland

The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f

£Up to £4,650,000
⏱ 9 Nov 2026
Posted · 2d ago29d to apply →
S
Open
ocds-h6vhtk-07834a · tender

Provision of motor control centres, systems integration and ICA services

Scottish Water
worksScotland

Scottish Water is seeking to establish a multi-supplier Framework Agreement for the provision of Motor Control Centres (MCCs), Instrumentation, Control and Automation (ICA), System

£Up to £140,000,000
⏱ 9 Nov 2026
Posted · 3d ago29d to apply →
K
Open
ocds-h6vhtk-077ffc · tender

Kishorn port - phase 1B - east quay development

Kishorn Port Limited
worksScotland

Kishorn Port Limited (KPL) own and operate the drydock facility at Kishorn. The existing drydock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectare

£Up to £30,000,000
⏱ 2 Nov 2026
Posted · 1w ago22d to apply →