Building Decarbonisation Projects at Williamson Park, The Storey and City Lab
Lancaster City CouncilEstimated Value
Up to £2,937,317
Deadline
13 March 2025
Published
7 July 2025
Type
works
Overview
Phase 1 – Pre-Construction Services (RIBA Stage 4) The initial appointment will be for the pre-construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase.
Key Responsibilities for RIBA Stage 4: • Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications. • Assist with detailed cost estimation, including providing open book pricing. • Contribute to risk management by identifying potential risks and proposing mitigation strategies. • Review and validate the design to confirm that it aligns with project requirements and is feasible for construction. Page 4 to 10 Phase 2 – Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out).
However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor’s performance and the project’s requirements.
Additional details
The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re-tender for the construction works.
The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required. Key Points for RIBA Stage 5 and 6: • The ITT outlines the requirements for both pre-construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4. • Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations.
The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council.
However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process. The contractor must be aware that no construction works, particularly any equipment ordering or significant on-site activities, can commence until all planning permissions are secured.
The timeline for the project may be extended if planning approvals are delayed. Coordination with external parties, may also impact the timing of planning approvals and should be factored into the project delivery plan.
The project is partially funded through the Public Sector Decarbonisation Scheme (PSDS), and the key funding condition is that the project must be fully delivered, reach Practical Completion (PC), and be signed off by the end of January 2026. This is the final deadline for the project, and all works must be completed, tested, commissioned, and handed over before this date to ensure compliance with funding requirements.
While an initial target of December 2025 has been identified for completion, this is flexible to avoid unnecessary risk. The Council prefers to extend the timeline if required to ensure quality and performance, rather than rush delivery.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Alternative Heat Ltd
£2,937,317
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Alt-Solar Limited
1 contract wonlatest 19 May 2025£3m
total awarded
- 2
Electricity North West (Construction and Maintenance) Limited
1 contract wonlatest 28 Apr 2025£910,895
total awarded
Alt-Solar Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Lancaster City CouncilKey Dates
Published
7 July 2025
Submission deadline
13 March 2025
Notice type
award
Source
find a tender
Related Tenders
Shorepower civils works
Construction of concrete foundations for shorepower equipment, ducts, pits and some steel works. The works are required at Port Askaig and Kennacraig ferry terminals. All works are
Framework agreement for design, supply & installation of kitchens (lot 1) and bathrooms (lot 2) & associated works 2026 to 2030
This framework contract lets suppliers provide design, supply and installation services for kitchen and bathroom upgrades in public buildings from 2026 to 2030, covering everything from cabinets and worktops to showers and LED lighting.
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.