Ancillary Fabrication of Spreadable Butter Processing Line
Gower View Foods LtdEstimated Value
Up to £40,000
Deadline
6 July 2026
Published
22 June 2026
Type
Not specified
Full Description
Stainless Steel Fabrication and Installation Support Works for Spreadable Butter Production Facility
Requirement
Gower View Foods Ltd seeks quotations for the provision of stainless-steel fabrication, equipment installation support works, guarding, and associated mechanical installation services required for the integration of a new spreadable butter production facility.
The successful contractor shall provide all labour, materials, fabrication, lifting equipment, installation services, testing, and commissioning support necessary to facilitate the safe and effective installation of the production line.
Scope of Works
- Equipment Offloading and Positioning
The successful contractor shall
- Offload delivered equipment from transport vehicles.
- Provide all necessary lifting and handling equipment.
- Move and position equipment within the designated production area.
- Align equipment in accordance with the agreed production line layout.
- Undertake final positioning and adjustment prior to commissioning.
Equipment to be installed includes, but is not limited to
- Stainless-steel conveyors
- Tote bin lift
- Z-blade blender
- Butter trolley system
- Butter pump
- Vertical butter silo refurbishment and installation
- Spreadable butter processing plant
- Pipework serving the tub filling machine
- Metal detector
- Case packer
- CIP system
- Steam boiler
- Chilled water plant
- Equipment Integration and Height Modifications
The successful contractor shall
- Assess equipment interface heights and installation requirements.
- Design and fabricate supports, stands, brackets, and adjustment structures as necessary.
- Modify equipment elevations to ensure continuous product flow throughout the production process.
- Achieve correct alignment between all process equipment and conveyors.
- Stainless-Steel Transition Fabrication
The scope shall include the design, manufacture, and installation of stainless-steel transition components required to achieve automatic product transfer between equipment.
Fabricated items may include
- Product transfer chutes.
- Transition hoppers.
- Interface sections.
- Support brackets and mounting structures.
- Ancillary stainless-steel fabrication necessary to connect process equipment.
All transitions shall be designed to
- Facilitate automatic product flow.
- Minimise product loss and contamination risks.
- Support hygienic cleaning and maintenance.
- Integrate effectively with existing and new equipment.
- Z-Blade Blender Support Stand
The successful contractor shall
- Design, manufacture, and install a new stainless-steel box-section support stand for the Z-blade blender.
- Ensure the stand provides adequate structural support and operational stability.
- Design the stand to achieve the required working height and integration with adjacent equipment.
- Construct the stand using food-grade stainless steel suitable for wash-down environments.
- Safety Guarding
The scope shall include the supply and installation of machinery guarding required to ensure safe operation of the production line.
Guarding shall comprise
- Stainless-steel box-section framework.
- 25 mm stainless-steel welded mesh infill panels.
- Access doors and removable sections where required for maintenance and cleaning.
- Secure fixing systems.
- Compliance with applicable machinery safety requirements.
The contractor shall
- Manufacture all guarding.
- Install guarding in its final operating position.
- Ensure access arrangements are practical and safe.
- Coordinate guarding layouts with equipment operation and maintenance requirements.
- Lifting and Installation Equipment
The successful contractor shall provide all lifting and handling equipment necessary to complete the installation, including:
- Forklift trucks.
- Machinery skates.
- Toe jacks.
- Lifting accessories.
- Any additional equipment required for safe handling and positioning of machinery.
- Fabri
Requirements
Gower View Foods Ltd seeks quotations for the provision of stainless-steel fabrication, equipment installation support works, guarding, and associated mechanical installation services required for the integration of a new spreadable butter production facility.
The successful contractor shall provide all labour, materials, fabrication, lifting equipment, installation services, testing, and commissioning support necessary to facilitate the safe and effective installation of the production line.
The successful contractor shall
The successful contractor shall
The scope shall include the design, manufacture, and installation of stainless-steel transition components required to achieve automatic product transfer between equipment.
All transitions shall be designed to
The successful contractor shall
- Design the stand to achieve the required working height and integration with adjacent equipment.
The scope shall include the supply and installation of machinery guarding required to ensure safe operation of the production line.
Guarding shall comprise
- Access doors and removable sections where required for maintenance and cleaning.
The contractor shall
The successful contractor shall provide all lifting and handling equipment necessary to complete the installation, including:
- Any additional equipment required for safe handling and positioning of machinery.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Sign up freeto open noticeA free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Procurement Portal
Open the original notice
Click the button below to view this tender on the official portal
Find submission instructions
Look for "How to apply" or "Submission" sections in the notice
Register on the portal
Create a free account on the buyer's procurement platform
Download tender documents
Download all specifications, templates, and pricing schedules
Submit before the deadline
Complete all documents and submit through the portal — do not email unless explicitly instructed
Always check the official notice for the exact submission method and deadline.
Buyer Profile
Gower View Foods LtdKey Dates
Published
22 June 2026
Submission deadline
6 July 2026
Notice type
Contract notice
Source
sell2wales
Related Contracts
Ceredigion, lampeter, hafan deg - new boilers and associated works / ceredigion, llanbedr pont steffan, hafan deg - boeleri newydd a gwaith cysylltiedig
Ceredigion County Council is seeking to appoint a suitably qualified and experienced contractor to undertake the installation of new boilers and associated mechanical and electrica
RSPB ynis-hir, covert coch peatland sluice design
Covert Coch, part of RSPB Ynys-hir on the Dyfi Estuary, is a globally rare estuarine raised bog and a key component of the highly protected UNESCO Biosphere. Due to historical drai
Design and build of a rigid hull inflatable boat (RHIB) – harbour patrol operations
The Port of Milford Haven (PoMH) invites tenders from suitably qualified and experienced vessel builders and suppliers for the design, construction, certification, delivery and com
Market research ON healthy ageing
Hywel Dda University Health Board (HDUHB) is seeking to commission a provider to undertake research which will help inform service planning, identify unmet needs, and support decis