Estimated Value
Not specified
Deadline
Not specified
Published
17 August 2026
Type
works
Overview
Transport Scotland, on behalf of the Scottish Ministers, has identified the need to appoint a suitably experienced contractor for the design, construction, completion and maintenance of the proposed A9 Dualling: Tomatin to Moy project which includes the upgrade of approximately 9.6km of existing A9 single and overtaking wide single 2+1 (WS2+1) carriageway to dual carriageway standard, between the existing dual carriageway sections to the south of Tomatin and to the north of Moy. The main element of work to be delivered is the construction of a Dual 2 Lane All Purpose (D2AP) Trunk Road as described in ‘CD 127 Cross-sections and headrooms’ within the UK Design Manual for Roads and Bridges.
The works will also incorporate a new bridge at Dalmagarry to carry the new A9 dual carriageway over the realignment of an approximately 670m long section of Dalmagarry Burn. This will replace an existing structure at this location.
To the west of the Highland Main Line Railway, a new access track bridge will be required to be constructed to maintain access over Dalmagarry Burn for the local farm operations. Other works will include, but not be limited to; construction of approximately 3.3km of single lane local link road with passing places, drainage (including sustainable drainage systems), one grade-separated junction, four left-in left-out junctions, upgrade of approximately 42 culverts, traffic management, earthworks, road restraint systems, accommodation works, service diversions, fencing, signage, environmental mitigation and a 5 year maintenance period for landscaping and defect rectification following completion.
Regulations cited
- Public Contracts (Scotland) Regulations 2015
Additional details
The successful tenderer will not be required to carry out cyclic maintenance. Transport Scotland is an agency of the Scottish Government and contracts in the name of and on behalf of the Scottish Ministers.
Transport Scotland has identified the requirement to appoint a suitably experienced Contractor to design & build the A9 Dualling: Tomatin to Moy located between the village of Tomatin to the south and Moy to the north. It is intended that the Contract will include the design and construction of the works which will last approximately 3 years followed by a 5-year period of maintenance for landscaping and defect rectification.
The successful tenderer will not be required to carry out cyclic maintenance. Transport Scotland will manage the proposed procurement process for the A9 Dualling: Tomatin to Moy contract on behalf of the Scottish Ministers.
In the event of the contract award, the contract will be entered into between the Scottish Ministers and the successful tenderer. The contract terms and conditions will be based upon Transport Scotland’s bespoke design and build contract.
Each selected economic operator shall be invited to submit a tender on the same contract terms and conditions. The Contractor will be procured through a competitive tender procedure, in accordance with the competitive dialogue procedure as stated in the Public Contracts (Scotland) Regulations 2015.
Due to the project complexity, the contract requires to be performed by a single contractor and as such shall not be divided into lots. To be considered for the prequalification stage, economic operators are required to complete and submit a Single Procurement Document (SPD) in accordance with this Contract Notice, which can be downloaded via the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk).
Economic operators shall be evaluated in accordance with the Public Contracts (Scotland) Regulations 2015, on the basis of the information they have provided within the SPD. The scope of works will include, but not be limited to: -Design and construction of online widening to the existing A9 trunk road to upgrade to rural dual carriageway (D2AP) standard; -Design and construction of associated structures including bridges, retaining walls, and culverts; -Design and construction of new side roads and access roads associated with the widening of the existing A9 trunk road; -Diversionary works for statutory undertakers and the like; -Environmental and landscaping mitigation measures; -Construction of a Sustainable Drainage System (SuDS) including retention basins and swales; -Stopping up of existing direct accesses and alternative provision made with alternative new means of access; -Traffic management; -Accommodation works; and -All other works associated with a trunk road improvement.
Further details can be found in the Supplementary Information Document which can be downloaded via the Additional Documents, located within the Additional Notice Options of the Public Contracts Scotland Portal (www.publiccontractsscotland.gov.uk). Project Bank Account It is the intention that the project will operate a mandatory Project Bank Account (PBA), a project specific account ring fenced with effective Trust status, for payment of the contractor and supply chain.
The account shall be opened by the Scottish Ministers with The Royal Bank of Scotland (or similar bank operating PBA’s) under the Banking Services Framework defined at http://www.gov.scot/Topics/Government/Procurement/directo... and in addition it is intended that the PBA shall satisfy the minimum requirements for an effectively constituted Trust under Scots law. The use of a PBA by the contractor and into the supply chain shall be a contractual requirement.
Where the Contract permits any of the supply chain for which it is agreed shall not be paid through the PBA, shall be entitled to payment according to the prompt payment provisions provided within the Contract. Additional information: For further information relating to additional information, please refer to Section 3.4 of the VI.3 Supplementary Information Document that can be downloaded via the Additional Documents, located within the Additional Notice Options of the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk).
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Wills Bros Civil Engineering Ltd
1 contract wonlatest 19 Aug 2025£153m
total awarded
Wills Bros Civil Engineering Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Transport ScotlandKey Dates
Published
17 August 2026
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
Provision of motor control centres, systems integration and ICA services
Scottish Water is seeking to establish a multi-supplier Framework Agreement for the provision of Motor Control Centres (MCCs), Instrumentation, Control and Automation (ICA), System
Kishorn port - phase 1B - east quay development
Kishorn Port Limited (KPL) own and operate the drydock facility at Kishorn. The existing drydock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectare