Estimated Value
Up to £152,743,000
Deadline
Not specified
Published
19 August 2025
Type
works
Overview
Transport Scotland is an agency of the Scottish Government and contracts in the name of and on behalf of the Scottish Ministers. Transport Scotland has identified the requirement to appoint a suitably experienced Contractor to design & build a new dual carriageway between north of the Jubilee Bridge over the river Tay and the southern end of the existing dual carriageway south of Ballinluig Junction.
The contract will include a 260 week period of maintenance after completion of the main works and a 260 week period of landscape establishment following completion of landscape planting. The Contractor will not be required to carry out cyclic maintenance, which shall be carried out by a third party appointed by the Scottish Ministers.
The Contractor will be procured through a Competitive Dialogue procedure, in accordance with the Public Contracts (Scotland) Regulations 2015. Transport Scotland will manage the proposed procurement process for the A9 Dualling Tay Crossing to Ballinluig Contract on behalf of the Scottish Ministers.
Key points
- Widening of existing A9 single carriageway to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges
- Construction of seven left-in left-out junctions
- Construction of a roundabout
- Upgrade to side roads including resurfacing or realignment and other improvements
- Construction of access roads to rural properties
- Provision of one new overbridge structure (Guay South Overbridge) and one new underbridge structure (Kindallachan Underbridge).
- Replacement and/or upgrade to a number of existing structures including culverts and Sustainable Drainage Systems (SuDS) developed in consultation with Scottish Environment Protection Agency (SEPA).
- Provision of traffic management, earthworks, retaining walls, soil nailing, road restraint systems, accommodation works, service diversions, fencing, signage, landscaping and environmental mitigation.
Regulations cited
- Public Contracts (Scotland) Regulations 2015
Additional details
In the event of a Contract award, the Contract will be entered into between the Scottish Ministers and the successful tenderer. The procurement process leading to the award of the Contract will comprise the following: 1.
Prequalification (SPD) (approx. 6 weeks) 2. Competitive Dialogue (approx. 33 weeks) 3.
Tender (approx. 6 weeks) 4. Award Detailed information regarding the award process and award criteria for the tender phase will be supplied to economic operators who are invited to participate in dialogue.
Transport Scotland shall notify Participants when the Competitive Dialogue phase has concluded and invite the Participants who have presented an acceptable solution to submit a final tender. The form of contract is to be an NEC4 Engineering and Construction Contract (ECC) Option A: priced contract with activity schedule with amendments.
Contract documentation will be provided at Invitation to Participate in Dialogue (ITPD) stage to shortlisted participants, however the DRAFT conditions of contract will be made available for all economic operators to review within the Information Pack. Refer to Section VI.3) for further information on how to access to the Information Pack.
Transport Scotland is providing a DRAFT of its conditions of contract to ensure prospective economic operators are informed as early as possible of the contract. The DRAFT conditions of contract are subject to change and no obligation, liability, duty of care or responsibility to any party is created by or shall arise out of this.
Selected Participants, following the Competitive Dialogue stage, shall be invited to submit a final tender on the same contract terms and conditions. To be considered for the prequalification stage, economic operators are required to complete and submit a Single Procurement Document (SPD) in accordance with this Contract Notice and the Supplementary Information Document (SID) which can be accessed via the Additional Documents located within the Additional Notice Options, this can be downloaded via the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk).
Economic operators shall be evaluated in accordance with the Public Contracts (Scotland) Regulations 2015, on the basis of the information they have provided within the SPD. It is intended that the Contract will include the design and construction of the works which will last approximately 156 weeks, followed by a 260 week period of maintenance including defect correction and establishment of landscaping.
Additional information: Economic operators who initially meet but then subsequently fails to meet the objective criteria, prior to contract award, shall be excluded. Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 58 of the Public Contracts (Scotland) Regulations 2015.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Wills Bros Civil Engineering Ltd
£152,743,000
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Transport ScotlandKey Dates
Published
19 August 2025
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
Joinery contractors framework
NHS Lanarkshire is setting up a Joinery Contractors Framework to supply planned, routine, reactive and emergency joinery work across its hospitals and community sites. The contract is split into three lots based on work value and location, with one‑year emergency cover required.
Angus rural mobility hub - enabling infrastructure works
The project comprises the enabling infrastructure only required for a new Mobility Hub. We are seeking a Main/ Principal Contractor to carry out the enabling infrastructure works f
Provision of motor control centres, systems integration and ICA services
Scottish Water is seeking to establish a multi-supplier Framework Agreement for the provision of Motor Control Centres (MCCs), Instrumentation, Control and Automation (ICA), System
Kishorn port - phase 1B - east quay development
Kishorn Port Limited (KPL) own and operate the drydock facility at Kishorn. The existing drydock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectare