EKFB JV - Highways Works NC2A
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3Estimated Value
£250,000 – £500,000
Deadline
5 June 2026
Published
29 May 2026
Type
works
Overview
NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Highways/ footpaths works, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications.
The Subcontractor will be responsible for the temporary works design and temporary works construction as further detailed in this document. The subcontractor will be responsible for all permanent and temporary works relating to the Highways realignment unless otherwise excluded.
The works included as part of this scope to be delivered by the subcontractor are: - Site clearance including Removal of existing drainage, kerbs, footpath, highway pavement, verges within permanent design location. - Earthworks including excavation to formation, soft spot treatment if required. - Drainage system, including temporary excavations, supply and installation of chambers, gullies, headwalls, carrier drains, filter and fin drains, fin drains, ditches, hydro brake system, non-return valve connection to existing drainage systems. - Service ducts: including supply and installation of service ducts, connections and chambers. - Road formation (asphalt surfacing by others): this includes supply and installation of geotextile separation materials highways and footways kerbs. Installation of capping and subbase layers Please express your interest within this package.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3Key Dates
Published
29 May 2026
Submission deadline
5 June 2026
Notice type
Contract
Source
contracts finder
Related Contracts
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
HS2 is looking for a specialist subcontractor to build accommodation and footway overbridges (bridges that go over the railway) as part of the North Chilterns to Aylesbury section of the project. You'll be responsible for constructing the concrete structures, drainage, waterproofing, and all associated civils works — essentially everything except the deck (top surface) of the bridge.
GB-Thaxted: MW2420 - Little Maypole - Bridge Replacements
Replacement of 4 Nr. timber pedestrian access bridges with new GRP equivalents
Greenwich Minor Works Dynamic Purchasing System
The University of Greenwich wants to set up a Dynamic Purchasing System (DPS) — essentially a pre-approved supplier list — for minor building and maintenance works projects. They expect to call-off (order) projects worth £1–2 million each over time, covering everything from painting and repairs to specialist work like asbestos removal and solar panel installation.
EBC PR Hersham Recreation Ground, Runway Replacement
Removal and Replacement of the Rail Runway and Associated Safety Surfacing.<br>• Removal and replacement of the Rail Runway, in its entirety. <br>• Removal of existing surfacing an