ESS Electrical , Remedial & Integration Works Project is Sweden
UK Atomic Energy AuthorityEstimated Value
Not specified
Deadline
Not specified
Published
1 June 2026
Type
works
Overview
The requirement relates to the continuation of existing electrical, remedial, snagging, labelling, energisation/de-energisation support, commissioning support and integration works being undertaken by Optimum Electrical Engineering Ltd on the ESS Active Cells Facility project in Lund, Sweden. Optimum has been delivering the electrical installation and associated support works on site since the original competitively tendered arrangement.
The remaining requirement is not a discrete new package of work that can be separated and competed without significant technical, safety, quality and programme risk. It is a continuation of ongoing works across partially completed electrical installations, live snagging, system interfaces, Quality Assurance handover, commissioning support and subcontractor Site Acceptance Test readiness.
Optimum currently manages the electrical installation programme at the ESS Active Cells Facility site and is responsible for the day-to-day electrical safety activities associated with the works. Optimum has established site processes, RAMS, QA documentation routes, ESS competency arrangements and electrical safety responsibilities that are already embedded into the project delivery model.
Additional details
Optimum’s Lead Project Engineer has also held key electrical safety responsibilities on site, including AP(E)-type duties and authority to support switching arrangements agreed with ESS. Replacing Optimum would require these arrangements to be re-established, reassessed and accepted by ESS, which would introduce delay and additional safety assurance risk.
A change in supplier at this stage would result in disproportionate technical difficulties and delivery risk. Any replacement supplier would need to mobilise, familiarise itself with the facility, review partially completed electrical works, understand historical design and installation decisions, engage with Optimum for technical and QA handover, establish RAMS and ESS competency approvals, and take responsibility for live electrical safety and commissioning interfaces.
This would create duplicated effort, additional UKAEA management burden and a high risk of delay to the remaining installation, testing, commissioning and handover programme. There is also a regulatory constraint.
UKAEA cannot directly undertake electrical installation works in Sweden because Swedish electrical installation companies must hold compliance officer status. UKAEA has previously been rejected by Sweden’s National Electrical Safety Board for company registration and compliance officer status.
ESS holds this status but has not agreed for UKAEA to work under ESS’s compliance officer arrangements. Optimum holds the required Swedish compliance officer status and is therefore the current route through which UKAEA can continue electrical installation, energisation, de-energisation, commissioning support and associated electrical safety activities on site.
The new contract will be supported by a defined Scope of Work, managed through the contract documentation, Primavera P6 programme, electrical package snagging list and UKAEA instruction. This will allow UKAEA to control, instruct, prioritise and monitor the remaining activities while retaining flexibility to respond to emerging snags, system readiness, external supplier delays and commissioning requirements.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Award Details
OPTIMUM ELECTRICAL ENGINEERING LTD
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
UK Atomic Energy AuthorityKey Dates
Published
1 June 2026
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Contracts
CA18042 - Tender 29/2026 - PEACEPLUS PP1020 - St Monicas Boxing Club - Creation of Extension to Club Facilities
This is a construction contract to build an extension to St Monica's Boxing Club that will add toilet facilities, an office, and a kitchen. The work also includes building an internal steel mezzanine (raised platform) in the existing gym with a soundproofed room for counselling, plus all associated electrical work and finishing. The contract is managed under NEC4 ECSC Short Contract terms.
Singlegate Primary School boiler replacement works
Singlegate Primary School needs a new boiler installed during the summer holidays in 2026 (between 21 July and 31 August). This is a straightforward replacement project that must be completed while the school is closed, and all bidding happens through the London Tenders Portal.
WC1928003 - NDT TESTING OF ABOVE GROUND JPTS TANKS T9 & T10, CYPRUS
This is a contract to inspect and repair two large fuel storage tanks (T9 and T10) at a British military airbase in Cyprus. The work involves checking the tanks for damage using special testing methods, blasting and repainting the inside surfaces, fixing any problems found, and servicing the pressure valves on top.
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
HS2 is looking for a specialist subcontractor to build accommodation and footway overbridges (bridges that go over the railway) as part of the North Chilterns to Aylesbury section of the project. You'll be responsible for constructing the concrete structures, drainage, waterproofing, and all associated civils works — essentially everything except the deck (top surface) of the bridge.