Service Design for Embedding Positive Cultures in Residential Care across Wales
Social Care WalesEstimated Value
Not specified
Deadline
15 June 2026
Published
4 June 2026
Type
Not specified
Overview
The contract will be divided into the following two Lots. Social Care Wales intends to appoint one provider per Lot:Lot 1 – Co-design and Test Leadership Support Programme & tools for Adult Social Care ProvidersLot 2 – Programme evaluation and impact assessment of the co-design and testing of a new leadership programme and tool for nurturing positive cultures in adult social care services across WalesSuppliers may submit bids for one or both Lots.
However, a Supplier may not be awarded both Lots due to an unavoidable conflict of interest (i.e. evaluating their own work). In the event that a Supplier is ranked highest in both Lots, the Supplier will be awarded Lot 1 only.
The award for Lot 2 will then be offered to the next highest-ranking compliant bidder Project Phases The Supporting Positive Cultures Programme will be delivered across three distinct phases. Phase 1 has already been commissioned and is underway.
Lots (2)
- Lot 1Co-design and Testing of Leadership Support (Phase 2) & Positive Culture Tools (Phase 3) for Adult Social Care Lot 1 will be responsible for the design, co-production, testing and refinement of the programme’s practical components, informed by the evidence generated through Phase 1
- Lot 2Programme Evaluation and Impact Assessment for Supporting Positive Culture (Phase 4) Lot 2 will focus on the independent evaluation of Phases 2 and 3
Eligibility & compliance
It will ensure accountability and support continuous improvement across the sector.The evaluation will: - Assess the extent to which the support offer and tool were delivered as in-tended and detail any adaptations- Explore: ~ whether the programme achieved it's desired aims, ~ the factors that influenced the impact of the programme and whether these varied across test sites, ~ what difference the programme made to staff, management, the or-ganisation and people accessing care and support, and ~ the influence of wider systemic factors had on the impact of the pro-gramme. ~ Explore the outcomes from the programme including: ~ Any positive or negative outcomes and impacts from the programme, ~ The factors that contributed to those outcomes ~ whether any systemic barriers need to be addressed to improve outcomes from the work. - Develop theory of change alongside the programme provider (building on the Rayne Foundation expected outcomes) using contribution analysis to: ~ Map intended outcomes, ~ explore contribution towards outcomes, ~ monitor ongoing outputs and explore changes to workforce and provider behaviour and; ~ Explore any systemic barriers impacting on the programme.- Assess positive cultures at the test sites at the start, mid-point and end of testing - Involve lived experience and workforce voices wherever possible- Measure changes in behaviours, leadership, wellbeing, culture, practice and collaboration- Assess how, where and why positive cultures emerge- Highlight barriers and enablers to positive cultures- Explore implications for policy, commissioning and regulation - Outline considerations and recommendations for upscaling the programme going forward.The Supplier will need to work in close collaboration with Social Care Wales, providing regular updates to ensure the work remains aligned with the project’s aims and adheres to the contract deadline.The successful Supplier must work closely with both the co-design supplier and Rayne Foundation evaluators (Bean Consultancy) to ensure reporting requirements and outcomes measures are addressed.
Additional details
Phases 2 and 3 will be delivered through the two Lots commissioned as part of this tender. (a) Phase 1: User Research (completed separately) Phase 1 is currently underway and is due to complete in June 2026.
This phase focuses on developing a robust understanding of the needs of leaders in adult care provider organisations, particularly in relation to embedding, assessing and sustaining positive organisational cultures and their underpinning principles. The outputs from Phase 1 will include a set of evidence-based proposals setting out what an effective future support service for nurturing positive cultures could look like.
Phase 1 is not included within the scope of this tender. Its findings will be shared with the successful supplier/s upon contract award and will directly inform the work commissioned through Lots 1 and 2.
(b) Phases 2 and 3: Design, Testing and Evaluation (commissioned through this tender) (LOT 1)The Phases will be delivered through the two Lots described below. This includes: • Co-designing and testing a leadership support offer for adult social care providers, and • Co-designing and testing a positive cultures tools to support providers embed, assess, measure, and improve organisational positive culture in a meaningful and proportionate way.
The focus of Lot 1 is on practical development and testing with providers. Ensure ethical research practices are upheld including informed consent, safeguarding, and data protection. - Develop site specific action plans to support six care settings to test ways new support service that nurtures positive cultures, gather feedback, and iterate solutions for support.
This will involve working with the Responsible Individual, Registered Manager and up to 3 front-line staff at each pilot site.- Gathering data to support the evaluation on the ‘positive culture’ position of each test site at the start, re-measure at the mid-way and end point. - Undertake site visits or virtual consultations to observe Responsible Individual and Registered Manager in their own care settings to understand how they support positive cultures and behaviours. Also gain insights into the challenges they face, how they are overcome and what difficulties remain.- Develop practical resources, guidance and learning materials.- Produce a service design report explaining what was designed, how it was tested and what was learned from the design and testing process.
The report should also feature information about the experience of the 6 testing sites and their results. The report should also include recommendations for Social Care Wales to consider as next steps towards a scaled implementation of the work.(b) Phase 3 Codesign and test tools for anticipated activity:- Engage stakeholders in co-design workshops to define success criteria and design principles for the tool. - Develop a tool that measures indicators against the positive culture principles and aligns with strengths-based and compassionate leadership models. - Test the tool with 6 providers across Wales.- Validate usability and clarity through iterative feedback from the six pilot sites and test with care providers - Produce a service design report explaining what tool(s) was designed, how it was tested and what was learnt from the design and testing process.
The report should also feature information about the experience of the 6 testing sites and their results. The report should also include recommendations for Social Care Wales to consider as next steps towards a scaled implementation of the work.(c) Phase 2 & 3: Support service and toolCollaborate with a separate commissioned supplier to gather evidence that will feed into an Evaluation report for Phase 2 and 3 which will contribute towards the Rayne Foundation Better Carers Better Careers programme evaluation.
This includes the development and delivery of an evaluation and impact framework to assess the design and testing activity undertaken through Lot 1. Lot 2 will not be involved in the delivery of design of the support being evaluated.
What is required / ‘The Requirements’ - LOT 2(a) Evaluation Requirements (Phases 2 & 3)This phase will develop an evaluation and impact framework which forms part of a wider programme to support positive cultures in adult care servicesLot 2 is for undertaking an independent, mixed methods evaluation of the User research and codesign and testing of:- a leadership support service to nurturing positive cultures; and - a tool for implementing, measuring and evaluating positive cultures.The evaluation will synthesise data from Phase 2 & 3 to assess outcomes, identify lessons learned, and inform future policy and practice. See Specification for further infromation
AI Analysis
Powered by AI — always verify against official documents
```json { "overview": "Social Care Wales wants to improve leadership and culture in Welsh residential care homes. This contract has two separate jobs: Lot 1 is to design and test a new leadership support programme and a tool that care homes can use to measure and improve their workplace culture; Lot 2 is to independently evaluate whether Lot 1's work actually worked and what impact it had. You can bid for one or both, but you can't win both (to avoid conflicts of interest).", "requirements": [ "Must have experience in service design, co-production, and testing programmes in social care settings", "Demonstrated expertise in working with adult social care providers and understanding residential care environments", "Experience conducting ethical research including informed consent, safeguarding, and data protection compliance", "For Lot 1: Ability to design and run co-design workshops with care leaders and staff", "For Lot 1: Capacity to recruit and work with 6 pilot care provider sites across Wales over the contract period", "For Lot 1: Skills in developing practical resources, guidance materials, and service design reports", "For Lot 2: Experience in independent programme evaluation and mixed-methods evaluation design", "For Lot 2: Knowledge of theory of change and contribution analysis methodologies", "For Lot 2: Ability to measure outcomes across multiple sites and synthesise complex data", "For Lot 2: Experience working collaboratively with multiple stakeholders and external evaluators", "Ability to work collaboratively with Social Care Wales, Care Inspectorate Wales, and other commissioned suppliers", "Understanding of strengths-based and compassionate leadership models in care settings", "Access to or ability to conduct site visits across Wales (virtual consultations as alternative)" ], "key_tasks": [ "Lot 1, Phase 2: Recruit and partner with 6 adult social care provider pilot sites across Wales using agreed criteria", "Lot 1, Phase 2: Design and run co-design workshops with care leaders to create a new leadership support service", "Lot 1, Phase 2: Develop a theory of change document to guide the design and testing work", "Lot 1, Phase 2: Create site-specific action plans for each of the 6 care settings to test the new support service", "Lot 1, Phase 2: Conduct site visits or virtual consultations with Responsible Individuals and Registered Managers to observe how they support positive cultures", "Lot 1, Phase 2: Measure the 'positive culture' position at each test site at the start, mid-point, and end of testing", "Lot 1, Phase 2: Gather feedback from testing and iterate solutions with care providers", "Lot 1, Phase 2: Produce a service design report detailing what was designed, how it was tested, what was learned, and recommendations for scaled implementation", "Lot 1, Phase 3: Engage stakeholders in co-design workshops to define success criteria and design principles for a positive culture tool", "Lot 1, Phase 3: Develop a practical tool that measures positive culture indicators aligned with strengths-based and compassionate leadership", "Lot 1, Phase 3: Test the tool with the same 6 providers across Wales", "Lot 1, Phase 3: Validate usability and clarity of the tool through iterative feedback from pilot sites", "Lot 1, Phase 3: Produce a service design report on tool design, testing process, pilot site results, and recommendations for implementation", "Lot 1: Ensure all research practices are ethical, including informed consent, safeguarding, and data protection", "Lot 1: Collaborate with the Lot 2 evaluator to gather evidence that will feed into their evaluation report", "Lot 2: Develop an independent evaluation and impact framework for assessing Phases 2 and 3", "Lot 2: Conduct mixed-methods evaluation of both the leadership support service and the positive culture tool", "Lot 2: Assess whether the support offer and tool were delivered as intended and document any adaptations", "Lot 2: Explore whether the programme achieved its intended aims across all 6 test sites", "Lot 2: Identify factors that influenced programme impact and why impacts varied between test sites", "Lot 2: Measure what difference the programme made to staff, management, organisations, and people accessing care", "Lot 2: Explore how wider systemic factors influenced programme outcomes", "Lot 2: Develop a theory of change using contribution analysis, building on Rayne Foundation expected outcomes", "Lot 2: Map intended outcomes and explore contribution towards those outcomes", "Lot 2: Monitor outputs and explore changes in workforce and provider behaviour", "Lot 2: Identify systemic barriers impacting the programme", "Lot 2: Assess positive cultures at test sites at start, mid-point, and end of testing", "Lot 2: Incorporate lived experience and workforce voices into the evaluation wherever possible", "Lot
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Procurement Portal
Open the original notice
Click the button below to view this tender on the official portal
Find submission instructions
Look for "How to apply" or "Submission" sections in the notice
Register on the portal
Create a free account on the buyer's procurement platform
Download tender documents
Download all specifications, templates, and pricing schedules
Submit before the deadline
Complete all documents and submit through the portal — do not email unless explicitly instructed
Always check the official notice for the exact submission method and deadline.
Buyer Profile
Social Care WalesKey Dates
Published
4 June 2026
Submission deadline
15 June 2026
Notice type
UK4
Source
sell2wales
Related Contracts
Contract for Elba Skatepark, Swansea
Swansea Council is seeking a contractor to redevelop the Elba Skatepark in Gowerton into an accessible, community-friendly skate and ride facility. This is part of a larger programme to create a network of skate and wheeled sports facilities across Swansea.
5456 - Newbridge High School - Replacement of Heating System
A local council is seeking a contractor to completely replace the heating system at Newbridge High School over three summer holidays (2026-2028). This is a fixed-price contract where the contractor must remove the old system, install a new one designed by McCann and Partners, and phase the work so the school can operate normally during term time while spreading costs across three financial years.
PHW-FTS-58627-PIPETTE MAINTENANCE, REPAIR AND CALIBRATION WORK ACROSS ALL PUBLIC HEALTH WALES SITES
Public Health Wales needs a specialist contractor to maintain, repair, inspect and calibrate all pipettes (precision laboratory equipment) used across their Infection Services department at multiple sites. This is a technical service contract for laboratory equipment maintenance delivered to a healthcare organisation.
Preliminary Market Engagement for Supported Accommodation Security And Concierge Services Framework
Cardiff Council is releasing a tender for the provision of Security and Concierge Services to be provided across fourteen of their supported accommodation sites. The allocation is