Smithfield Birmingham - Variation of Joint Venture Development Agreement
Birmingham City CouncilEstimated Value
Not specified
Deadline
Not specified
Published
21 May 2026
Type
works
Overview
This notice concerns the intended variation of a Joint Venture Development Agreement ("JVA") covering the development of the scheme known as Smithfield Birmingham that was awarded to Lendlease Smithfield Development LLP (JVA PSP) (a subsidiary of Lendlease Europe, guaranteed by Lendlease's Australian parent company, Lendlease Corporation Limited) ("Lendlease") pursuant to a procurement carried out under the Public Contracts Regulations 2015 ("PCR 2015") that was advertised via a contract notice with reference 2017/S 148-305798 on 4 August 2017. The JVA was entered into between BCC and JVA PSP on 28 June 2021.
Details of the intended variation are given in sections II.2.4 and IV below. Birmingham City Council ("BCC") considers that the variation of the JVA is permitted without requiring a new procurement procedure in accordance with Regulation 72(1)(e) of the PCR 2015 for the reasons set out in this notice.
Lendlease announced a strategic restructure of its business on 27 May 2024 to simplify business operations and reduce debt. To align to its new corporate strategy Lendlease is seeking to reduce capital exposure in Smithfield, its funding strategy transitioning from a balance sheet-driven approach, to a private sector partnership model with a 50/50 joint venture proposed with The Crown Estate (TCE).
Regulations cited
- Public Contracts Regulations 2015
Additional details
The proposed modifications to the JVA set out below have been agreed between the parties in order to implement this new funding strategy, ensure efficient and proper operation of the JVA in light of the new funding strategy, and mitigate risks that may result from this. Details of the intended variation and of the reasons for it are explained below and in the BCC Cabinet Report dated 17 March 2026 accessible via this link: https://birmingham.cmis.uk.com/Birmingham/Document.ashx?c... Abbreviated terms used in this Notice have the meanings given to them in that Cabinet Report.
The intended modifications to the JVA will: Equity ownership 1. Permit sale of up to 50% of JVA PSP equity to a third party with BCC's prior consent. 2.
Allow TCE/Lendlease to increase its interest in JVA PSP to up to 75% without further BCC consent and, in the event that Lendlease defaults under its JV Agreement with TCE, allow TCE to acquire all of the JVA PSP's interest. 3. Require BCC's consent, acting reasonably, to sale of TCE's interest to a third party, with consent deemed unreasonably withheld where the proposed investor provides long term capital, has a market capitalisation or net assets of £1bn or more, and is of good standing. 4.
Require LL/TCE (or any future third party investor) to provide guarantees tracking their equity interest in JVA PSP or Phase PSP (as appropriate). 5. Permit substitution of JVA and Development Agreement (DA) guarantors, subject to acceptability criteria.
Phase to plot master developer structure 6. Allow a concurrent LLP/ELP structure with grant of Phase DA's to the Phase PSP and plot leases to Plot ELP's; (subject to conditions) allow individual buildings within phases to form single plots. 7.
Amend the Phase DA to reflect that the Phase PSP may not itself build out all plots, and plots may be drawn down into vertical developer SPVs for delivery. 8. Require Plot SPVs to covenant directly with BCC to comply with Phase DA obligations, so far as they relate to the relevant plot. 9.
Remove dependency on milestones for plots sold to third parties for further Developer drawdowns. 10. Subdivide phases into plots and permit drawdown of headleases for individual plots.
Increase flexibility around timing for satisfaction of Phase Conditions and land drawdown. 11. Amend the JVA so that, on a 100% plot sale, only the receipt attributable to that plot sale is reflected in the Financial Appraisal Model. 12.
Amend the JVA to vary the circumstances where termination or breach of the JVA or SAA triggers termination of granted Phase DA's, and so that termination or breach of the JVA or SAA does not trigger termination of Plot Leases. Clarifications 13.
Clarify matters including: not double counting surplus returns; waivers relating to Phase 1 land assembly; treatment of receipt shares as development costs for profit overage; conditionality and programming of infrastructure works; EZ funding scope; mechanisms to agree Phase DA specifications; JVA PSP approval of third party acquisitions; provision of future security by guarantee; deadlock matters. Other amendments and timetable 14.
Extend lease terms to 999 years (predominantly residential) and 255 years (commercial). 15. Modify BCC's right of first offer. 16.
Provide for capped and collared indexation where land value is converted to rent. 17. Introduce Developer indemnity for loss in land value acquired by BCC if project aborts. 18.
Reduce IRR Hurdle at which Developer must progress, increase BCC overage %. 19. Require Developer to deliver temporary market. 20. Permit grant of the first Phase 1 plot leases before satisfaction of the site wide planning condition; extend the target dates for site wide planning and unconditionality.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Award Details
Lendlease Smithfield Development LLP
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Birmingham City CouncilKey Dates
Published
21 May 2026
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Contracts
CA18042 - Tender 29/2026 - PEACEPLUS PP1020 - St Monicas Boxing Club - Creation of Extension to Club Facilities
This is a construction contract to build an extension to St Monica's Boxing Club that will add toilet facilities, an office, and a kitchen. The work also includes building an internal steel mezzanine (raised platform) in the existing gym with a soundproofed room for counselling, plus all associated electrical work and finishing. The contract is managed under NEC4 ECSC Short Contract terms.
Singlegate Primary School boiler replacement works
Singlegate Primary School needs a new boiler installed during the summer holidays in 2026 (between 21 July and 31 August). This is a straightforward replacement project that must be completed while the school is closed, and all bidding happens through the London Tenders Portal.
WC1928003 - NDT TESTING OF ABOVE GROUND JPTS TANKS T9 & T10, CYPRUS
This is a contract to inspect and repair two large fuel storage tanks (T9 and T10) at a British military airbase in Cyprus. The work involves checking the tanks for damage using special testing methods, blasting and repainting the inside surfaces, fixing any problems found, and servicing the pressure valves on top.
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
HS2 is looking for a specialist subcontractor to build accommodation and footway overbridges (bridges that go over the railway) as part of the North Chilterns to Aylesbury section of the project. You'll be responsible for constructing the concrete structures, drainage, waterproofing, and all associated civils works — essentially everything except the deck (top surface) of the bridge.