Balfour Beatty - Roads North of the Thames-LTC - Reinforced Soil Walls
BALFOUR BEATTY CIVIL ENGINEERING LIMITEDEstimated Value
£2,500,000 – £0
Deadline
21 May 2026
Published
13 May 2026
Type
goods
Overview
We are inviting expressions of interest from qualified and experienced subcontractors for the design, manufacture, and supply of Reinforced Soil Retaining Wall systems as part of the Lower Thames Crossing programme. What We're Looking For Subcontractors should be able to: Deliver specialist reinforced soil wall solutions safely, efficiently, and in accordance with the project programme.
Provide integrated design, manufacturing and supply services for reinforced soil systems. Work in line with all project requirements relating to health, safety, sustainability, low carbon, and quality.
Experience & Standards We are looking for companies with: Demonstrable experience in the design and/or supply of reinforced soil retaining walls and similar geotechnical or civil engineering structures. Strong health, safety, and environmental performance.
Submission
Next Steps How to apply, please complete the attached Reinforced Soil Retaining Walls Eligibility Criteria by the 21.05.26 then submit to the Supply Chain Team at BLTCProcurementandSupplyChain@balfourbeatty.com.
Additional details
Robust quality management systems and relevant industry certifications (e.g. HAPAS where applicable). The capability to support project sustainability, carbon reduction, and social value objectives.
AI Analysis
Powered by AI — always verify against official documents
Balfour Beatty is looking for specialist subcontractors to design, manufacture, and supply reinforced soil retaining wall systems for the Lower Thames Crossing project. This is a major infrastructure programme, and they want experienced companies that can handle the full service from design through to delivery on site.
Requirements
- Demonstrable experience designing and/or supplying reinforced soil retaining walls
- Proven experience with geotechnical or civil engineering structures
- Strong health, safety, and environmental performance record
- Robust quality management systems in place
- Relevant industry certifications (HAPAS certification mentioned as example)
- Capability to support project sustainability and carbon reduction objectives
- Ability to deliver in line with project programme and timescales
- Ability to work safely and efficiently on major infrastructure projects
Key Tasks & Deliverables
- Design reinforced soil retaining wall systems to project specifications
- Manufacture reinforced soil wall components and systems
- Supply reinforced soil retaining walls to site
- Integrate design, manufacturing, and supply services as a complete package
- Ensure all work meets health, safety, sustainability, low carbon, and quality standards
- Support the Lower Thames Crossing programme objectives for sustainability and social value
How to Read This Tender
- 1This is an 'expressions of interest' stage — they're not yet asking for full bids. You're being asked to prove you're qualified and capable. Complete the eligibility criteria form accurately; this is your chance to show why you should be shortlisted.
- 2The phrase 'integrated design, manufacturing and supply services' means they want one company handling all three stages, not separate specialists. If you can only do one part (e.g., just supply), mention that upfront when applying.
- 3HAPAS certification is mentioned — check if your company has this or similar accreditation. If not, understand what gap this creates and whether you can close it before bidding.
- 4This is part of a major national infrastructure project (Lower Thames Crossing), so expect strict compliance requirements around health, safety, sustainability, and carbon. Budget and planning should reflect this.
- 5The deadline is 21 May 2026. Submit to the email address provided. Don't miss this date — expressions of interest often have hard deadlines with no extensions.
Tips for Small Businesses
- If you're smaller or don't have all the experience in-house, consider partnering with another company or bringing in a technical partner. Many contractors form consortiums for infrastructure work — this can strengthen your bid without you having to do everything alone.
- Emphasise your sustainability and carbon reduction credentials. The contract specifically mentions 'low carbon' and 'social value objectives'. If you've reduced waste, used recycled materials, or supported local employment, highlight this — it can differentiate your bid.
- Before applying, request the full tender documents from Balfour Beatty. The eligibility criteria form is just the start. You'll need detail on quantities, site conditions, programme dates, and quality standards. Don't bid blind — understand the full scope first.
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
BALFOUR BEATTY CIVIL ENGINEERING LIMITEDKey Dates
Published
13 May 2026
Submission deadline
21 May 2026
Notice type
Contract
Source
contracts finder
Related Contracts
Christmas lighting electrical infrastructure
Battle Town Council is looking for an electrical contractor to remove old electrical equipment and install new infrastructure to support a Christmas lighting display along Battle High Street. This is a straightforward municipal infrastructure project for seasonal decoration.
Euston Scissor Box Precast Roof Panels
This is a contract to manufacture and supply precast concrete roof panels for the Euston Scissor Box project. The successful supplier will design the panels (stage 5 design), create detailed shop drawings, manage fabrication, and handle the temporary works needed during installation.
NORBURY SCHOOL GRASS RESURFACING & DRAINAGE PROJECT (HA1)
Norbury School needs a contractor to replace a failed artificial grass sports surface (565 square metres) and install a new drainage system. The work must be completed during the summer holidays between July and September 2026 so the school can reopen on time without disrupting pupils and staff.
Bangkok Congestion Charge Policy Detailed Legislative Development
The UK Government's PACT programme is looking for a specialist or team to help Thailand's transport ministry turn their congestion charging policy for Bangkok into actual laws and rules. You'll be drafting legislation and working with Thai government officials to get the policy ready for implementation by 2029-2030.