Estimated Value
£1,000,000 – £2,500,000
Deadline
25 June 2026
14 days remaining
Published
11 June 2026
Type
goods
Overview
The supplier will be responsible for the manufacture, fabrication and supply of the precast roof panels for Euston Scissor Box, the supplier will also be required to carry out the stage 5 design including fabrication and shop drawings. The supplier will also be responsible for the temporary works scheme.
AI Analysis
Powered by AI — always verify against official documents
This is a contract to manufacture and supply precast concrete roof panels for the Euston Scissor Box project. The successful supplier will design the panels (stage 5 design), create detailed shop drawings, manage fabrication, and handle the temporary works needed during installation.
Requirements
- Capability to manufacture precast concrete roof panels to structural engineering standards
- Ability to complete stage 5 design (detailed design phase)
- Production of fabrication drawings and shop drawings
- Experience with temporary works schemes and safety planning
- Likely requirement for quality assurance/quality control procedures for precast concrete
- Coordination with main contractor and design team
- No specific requirements listed in the notice — check the full tender documents for qualifications, certifications, insurance, and health & safety requirements
Key Tasks & Deliverables
- Design the precast roof panels in detail (stage 5 design phase)
- Produce fabrication drawings and shop drawings for manufacture
- Manufacture and fabricate the precast concrete roof panels
- Supply the completed panels to site
- Develop and manage the temporary works scheme (support systems during installation)
- Coordinate with the main project team on delivery and installation schedules
How to Read This Tender
- 1Understand 'stage 5 design' — this means you're not just manufacturing to someone else's design; you'll be doing the detailed engineering design yourself, so you need in-house design capability or a design partner
- 2The 'temporary works scheme' is critical — this is the method statement for how panels will be safely supported and handled during installation; this requires structural engineering input and must be approved by the main contractor before work starts
- 3Shop drawings are detailed technical drawings for your factory — they show exactly how each panel will be built, reinforcement placement, concrete mixes, and lifting points; these must match the stage 5 design
- 4This is a major infrastructure project (Euston is part of HS2) — expect strict quality control, regular inspections, and detailed contract terms; request the full specification and design brief early
- 5Check whether you're expected to design and supply only, or also handle logistics and on-site coordination during installation
Tips for Small Businesses
- Consider a consortium approach: partner with a structural engineer for stage 5 design if you're a manufacturer without in-house design; this makes your bid stronger and shares risk
- Temporary works are a compliance minefield — budget for a competent temporary works designer (usually a structural engineer) as part of your costs; this is non-negotiable on major projects
- Request clarification early on delivery logistics, site access, and installation schedule — precast panel projects are schedule-critical and delays can lock up your cash flow; understand who bears the cost if you manufacture on time but the main contractor isn't ready for delivery
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Useful Resources
Buyer Profile
SCS JVKey Dates
Published
11 June 2026
Submission deadline
25 June 2026
Notice type
Contract
Source
contracts finder
Related Contracts
Christmas lighting electrical infrastructure
Battle Town Council is looking for an electrical contractor to remove old electrical equipment and install new infrastructure to support a Christmas lighting display along Battle High Street. This is a straightforward municipal infrastructure project for seasonal decoration.
NORBURY SCHOOL GRASS RESURFACING & DRAINAGE PROJECT (HA1)
Norbury School needs a contractor to replace a failed artificial grass sports surface (565 square metres) and install a new drainage system. The work must be completed during the summer holidays between July and September 2026 so the school can reopen on time without disrupting pupils and staff.
Bangkok Congestion Charge Policy Detailed Legislative Development
The UK Government's PACT programme is looking for a specialist or team to help Thailand's transport ministry turn their congestion charging policy for Bangkok into actual laws and rules. You'll be drafting legislation and working with Thai government officials to get the policy ready for implementation by 2029-2030.
Electric heating
Perton Parish Council wants you to design, supply, install, and test electric radiators in their Civic Centre. This is a complete heating system project including all wiring, controls, and commissioning work to get the building fully heated and operational.