PRO004980-Goods-Framework-The Supply of Ductile Iron Pipe and Associated Fittings
United Utilities Water LimitedEstimated Value
Not specified
Deadline
22 May 2026
Published
24 April 2026
Type
goods
Overview
The Framework Agreement will cover the manufacture, supply, delivery, off-loading, installation guidelines, testing, technical support and (where applicable) disposal requirements of Ductile Iron Pipes & Fittings in various sizes (as per the specification in schedule 5 of the framework document), for water applications, wastewater applications, water network applications and wastewater network applications.
Contact & helpdesk
The material must conform to water industry standards for supply of material which will come into contact with potable water.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Procurement Portal
Open the original notice
Click the button below to view this tender on the official portal
Find submission instructions
Look for "How to apply" or "Submission" sections in the notice
Register on the portal
Create a free account on the buyer's procurement platform
Download tender documents
Download all specifications, templates, and pricing schedules
Submit before the deadline
Complete all documents and submit through the portal — do not email unless explicitly instructed
Always check the official notice for the exact submission method and deadline.
Buyer Profile
United Utilities Water LimitedKey Dates
Published
24 April 2026
Submission deadline
22 May 2026
Notice type
opportunity
Source
eu supply
Related Contracts
Christmas lighting electrical infrastructure
Battle Town Council is looking for an electrical contractor to remove old electrical equipment and install new infrastructure to support a Christmas lighting display along Battle High Street. This is a straightforward municipal infrastructure project for seasonal decoration.
Euston Scissor Box Precast Roof Panels
This is a contract to manufacture and supply precast concrete roof panels for the Euston Scissor Box project. The successful supplier will design the panels (stage 5 design), create detailed shop drawings, manage fabrication, and handle the temporary works needed during installation.
NORBURY SCHOOL GRASS RESURFACING & DRAINAGE PROJECT (HA1)
Norbury School needs a contractor to replace a failed artificial grass sports surface (565 square metres) and install a new drainage system. The work must be completed during the summer holidays between July and September 2026 so the school can reopen on time without disrupting pupils and staff.
Bangkok Congestion Charge Policy Detailed Legislative Development
The UK Government's PACT programme is looking for a specialist or team to help Thailand's transport ministry turn their congestion charging policy for Bangkok into actual laws and rules. You'll be drafting legislation and working with Thai government officials to get the policy ready for implementation by 2029-2030.