Kier Infrastructure - Ground Investigation
BIP SOLUTIONS LIMITEDEstimated Value
£20,000,000 – £30,000,000
Deadline
20 April 2026
Published
16 April 2026
Type
works
Overview
Kier infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non-intrusive and intrusive surveys in support of the design developments and Environmental Impact Assessment (EIA) requirements for one of our contracts. The scope includes approximately 1000-1500 exploratory holes to be delivered and will include ground-breaking activities associated with GI, including cable percussion boring, rotary drilling, dynamic sampling, pavement/concrete or Structural Coring, pitting and trenching. Note there is no additional scope information at this time.
AI Analysis
Powered by AI — always verify against official documents
Kier Infrastructure needs a supplier to carry out ground investigation work (drilling, boring, and soil sampling) across a large site or multiple sites. They're looking to build a long-term supply chain relationship to support their design planning and environmental assessments. The work involves creating 1000-1500 holes in the ground using various drilling and sampling techniques.
Requirements
- Ability to deliver non-intrusive surveys (surveys that don't dig into the ground)
- Ability to deliver intrusive surveys (surveys involving drilling and sampling)
- Capability to perform cable percussion boring
- Capability to perform rotary drilling
- Capability to perform dynamic sampling
- Capability to perform pavement/concrete coring or structural coring
- Capability to perform pitting and trenching work
- Experience supporting Environmental Impact Assessment (EIA) requirements
- Experience supporting design development programmes
Key Tasks & Deliverables
- Complete approximately 1000-1500 exploratory boreholes at specified locations
- Perform cable percussion boring at unknown number of locations
- Perform rotary drilling at unknown number of locations
- Perform dynamic sampling at unknown number of locations
- Core through pavement, concrete, or structural elements at unknown number of locations
- Excavate pits and trenches to specified depths for ground investigation
- Collect ground samples and data to support EIA and design decisions
- Provide data and findings to Kier for environmental and design assessment
How to Read This Tender
- 1This is a 'framework' or supply chain establishment contract — Kier isn't committing to a fixed amount of work upfront. They're building a list of approved suppliers they can call on. Ask for clarity on expected annual volumes and payment terms in your bid questions.
- 2The phrase 'no additional scope information at this time' is a red flag — it means the full details of locations, ground conditions, access, and timescales aren't yet known. Request a site visit, ground conditions summary, and geographic spread before committing to pricing.
- 3Ground investigation is specialist work requiring certified operatives, insurance, and safety management. Check whether Kier will provide site supervision, traffic management, or utility locates — or if you're responsible. Clarify who pays for damage to services like gas, water, or telecoms.
- 4Environmental Impact Assessment support suggests this may be a major infrastructure project (road, rail, or development). The '1000-1500 holes' is a rough guide, not a firm number. Budget for variation and ask whether payment is per hole completed or lump-sum.
- 5Look for the full tender documents (specifications, method statements, insurance requirements, and H&S standards). Ground investigation is heavily regulated — check whether you need BS 8103 accreditation, UKAS certification, or specific environmental licenses.
Tips for Small Businesses
- If you don't have all the drilling capabilities in-house, consider subcontracting specific methods (e.g., rotary drilling to a specialist) and managing the whole contract. Kier may prefer a single point of contact rather than multiple suppliers, so act as the coordinator and add your management margin.
- Ground investigation often involves social value scoring — highlight any local training, apprenticeships, or community engagement (e.g., 'We employ local operatives' or 'We run Level 2 drilling training'). This can improve your bid score at no cost.
- Pricing risk: the 1000-1500 figure is vague and the scope is incomplete. Submit your bid on a cost-per-hole basis (broken down by drilling type) rather than a lump sum, so you're protected if volumes change. Ask for a minimum annual commitment or minimum order value to justify keeping capacity available.
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
BIP SOLUTIONS LIMITEDKey Dates
Published
16 April 2026
Submission deadline
20 April 2026
Notice type
Contract
Source
contracts finder
Related Contracts
CA18042 - Tender 29/2026 - PEACEPLUS PP1020 - St Monicas Boxing Club - Creation of Extension to Club Facilities
This is a construction contract to build an extension to St Monica's Boxing Club that will add toilet facilities, an office, and a kitchen. The work also includes building an internal steel mezzanine (raised platform) in the existing gym with a soundproofed room for counselling, plus all associated electrical work and finishing. The contract is managed under NEC4 ECSC Short Contract terms.
Singlegate Primary School boiler replacement works
Singlegate Primary School needs a new boiler installed during the summer holidays in 2026 (between 21 July and 31 August). This is a straightforward replacement project that must be completed while the school is closed, and all bidding happens through the London Tenders Portal.
WC1928003 - NDT TESTING OF ABOVE GROUND JPTS TANKS T9 & T10, CYPRUS
This is a contract to inspect and repair two large fuel storage tanks (T9 and T10) at a British military airbase in Cyprus. The work involves checking the tanks for damage using special testing methods, blasting and repainting the inside surfaces, fixing any problems found, and servicing the pressure valves on top.
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
HS2 is looking for a specialist subcontractor to build accommodation and footway overbridges (bridges that go over the railway) as part of the North Chilterns to Aylesbury section of the project. You'll be responsible for constructing the concrete structures, drainage, waterproofing, and all associated civils works — essentially everything except the deck (top surface) of the bridge.