Buyer profile
Transport for London
Get alerts when Transport for London publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
2,396
Known spend
£42bn
2032 disclosed
Average value
£21m
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
London Central
21 winslatest 18 Feb 2026£107m
- 2
Stagecoach East London
18 winslatest 24 Nov 2025£85m
- 3
Transport UK London
14 winslatest 18 Feb 2026£89m
- 4
Stagecoach Selkent
14 winslatest 09 Jan 2026£75m
- 5
Arriva London North
13 winslatest 03 Feb 2026£91m
- 6
Metroline
11 winslatest 09 Jan 2026£59m
- 7
London General
8 winslatest 09 Jan 2026£39m
- 8
Metrobus
£16m
- 9
Transport UK West London
5 winslatest 01 Dec 2025£30m
- 10
Blue Triangle
5 winslatest 08 Jan 2026£26m
What they buy
By CPV categoryTransport servicesCPV 60
702 contracts · £3bn
Business servicesCPV 79
225 contracts · £3bn
Construction worksCPV 45
186 contracts · £4bn
Repair & maintenanceCPV 50
141 contracts · £480m
Architectural & engineeringCPV 71
123 contracts · £266m
IT servicesCPV 72
108 contracts · £2bn
Transport equipmentCPV 34
94 contracts · £1bn
SoftwareCPV 48
46 contracts · £157m
Tender activity
Notices published per month — last 24 months
All contracts (2396)
Shoe gear and beams for the s-stock fleet
Supply of positive and negative shoegear component materials and repair services for the 'S' Stock.
Ad hoc qualitative and quantitative research
Ad hoc qualitative and quantitative research which can support TfL/GLA to understand both the breadth and depth of a variety of themes including customer information provision, sta
Trams control systems renewals programme (CSRP) (LTC-23-607)
Single supplier required to replace the existing Trams Management System (TMS), providing an operator interface in the control room, and Programmable Logic Controllers (PLCs), prov
Rail grinding across all tfl rail modes
Rail Grinding requirement across all TfL Rail modes. Rail grinding is to ensure track corrugation causing noise and vibration remain compliant to avoid risk of safety and financial
Conductor rail insulators
Supply of conductor rail insulators and associated components to support maintenance, repair and renewal.
Kings cross escalators 4-6 replacement project - enabling works
Ancillary trades - replacement of escalators 4 and 6 at Kings Cross Underground Station. The scope of the works include management of the site facilities, installation of hoardings
Ickenham reinforced autoclaved aerated concrete works
Project to address presence of reinforced autoclaved aerated concrete at Ickenham London Underground station.
Hounslow central and west - canopy refurbishment
Project to refurbish the canopy at Hounslow Central and West London Underground stations.
Hillingdon roof and canopy renewal
Renewal project to remediate issues with the canopy and roof at Hillingdon Station
Earth structures remediation design and build - northolt to south ruislip
Civils Design and Build contract to deliver structural remediation works to the Northolt to South Ruislip earth structure.
Earth structures remediation design and build - high st kensington to triangle sidings
Civils Design and Build contract to deliver structural remediation works to the High St Kensington to Triangle Sidings earth structure.
Earth structures remediation design and build - finchley to mill hill
Civils Design and Build contract to deliver structural remediation works to the Finchley to Mill Hill earth structure.
Earth structures remediation design and build - debden to loughton
Civils Design and Build contract to deliver structural remediation works to the Debden to Loughton earth structure.
Baker street platform train interface design and build
Design and Build contract for implementation works at Baker Street to upgrade the platform train interface
Tfl nextgen - infrastructure improvement framework
TfL currently uses multiple frameworks to deliver its capital rail infrastructure portfolio. These frameworks will soon be expiring or reaching capacity, creating an opportunity fo
London underground (LU) bridges and civil structures maintenance retender
Retender of contract to deliver ongoing maintenance of LU bridges and structures comprising reactive maintenance and option to include planned preventative maintenance. The estimat
Cockfosters cable route management system (CRMS)
Cable Route Management System (CRMS) for Cockfosters
Elephant and castle station capacity upgrade - stage 2 fit out design and works
Elephant & Castle Station Capacity Upgrade (ECSCU) - Stage 2 - design and build fit out works.
Jubilee line one person operation (OPO) track to train (ttt) transmission and cameras
The Jubilee Line OPO (TtT) CCTV system is a safety aware system allowing the train operator to view two or more cameras in split screen mode on monitors in the train cab. This proj
Physical security guarding, reception and other services
Physical Security Guarding, Reception and Other Services - pan TfL