Buyer profile
Torridge District Council
Get alerts when Torridge District Council publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
102
Known spend
£20m
98 disclosed
Average value
£206,970
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
ENCOMPASS SOUTHWEST
£763,721
- 2
Livewest Homes Ltd
3 winslatest 08 Jun 2026£195,025
- 3
Westcountry Maintenance Services Ltd
2 winslatest 27 May 2026£4m
- 4
ARQUE LTD
£558,971
- 5
Nick Sampson Mechanical Engineering Services Ltd
2 winslatest 20 May 2026£179,000
- 6
DENNIS EAGLE LIMITED
£47,000
- 7
PEARCE CONSTRUCTION (BARNSTAPLE) LIMITED
£4m
- 8
CLASSIC BUILDERS (SOUTH WEST) LIMITED
£4m
- 9
MB ENERGY LIMITED
£1m
- 10
NAVIGATE
£317,947
What they buy
By CPV categoryArchitectural & engineeringCPV 71
15 contracts · £2m
Construction worksCPV 45
12 contracts · £2m
Repair & maintenanceCPV 50
5 contracts · £178,600
Sewage, refuse & cleaningCPV 90
3 contracts · £74,554
Music & artsCPV 37
2 contracts · £160,000
Recreation, culture & sportCPV 92
2 contracts · £160,000
Financial & insuranceCPV 66
1 contract · £750,000
Business servicesCPV 79
1 contract · £111,155
Tender activity
Notices published per month — last 24 months
All contracts (102)
Exhibition/shop design and build for northam burrows visitor centre, north devon
To design, build and install an exhibition and shop area that provides effective interpretation of Northam Burrows Country Park, as well as the North Devon Coast AONB and North Dev
Exhibition/shop design and build for northam burrows visitor centre, north devon
To design, build and install an exhibition and shop area that provides effective interpretation of Northam Burrows Country Park, as well as the North Devon Coast AONB and North Dev
Torrington swimming pool - roof refurbishment works
The complete removal and replacement of the existing failing hybrid roof system. The specification for the new roof coverings including a new plywood deck and insulation has been p
Refurbishment and alteration works to 26 high street, bideford
Refurbishment and Alteration Works to 26 High Street, Bideford via a further competition procedure through the Devon County Council SLoAC in accordance with regulation 28 of the Pu
Design, supply and installation of play equipment in calf street play area, gt torrington
Design, Supply and Installation of Play Equipment in Calf Street Play Area, Gt Torrington via ESPO Framework Agreement 115 - Outdoor Playground Equipment
A future high street for bideford - masterplanning for town centre transformation
Torridge District Council wishes to appoint an experienced consultant to undertake a master planning study for the potential transformation of the town centre and to create an insp
Design, supply & installation of play equipment in churchfields play area, appledore, devon
Design, Supply and Installtion of Play Equipment
Erection of new office building (phase 1), riverbank house, bideford.
The erection and commissioning of a new single storey office building and associated works in the grounds of Riverbank House, Bideford.
Insurance contract 2019
The Council is tendering for the provision of its insurance, cover to include Motor, Property, Public Liability, Employer Liability, Engineering and Marine. CCS Insurance Services
Bideford town hall business hub
To undertake a range of refurbishment works within a cluster of connected ground floor rooms to create a new Business Hub facility. Project to include minor remodelling works, mino
Demolition of former cattle market, bideford
Demolition of Former Cattle Market, Bideford
New office building (plot 3) caddsdown industrial park, bideford
Build of a new office block on Plot 3, Caddsdown Industrial Park, Bideford, North Devon
Holsworthy pannier market refurbishment works
Holsworthy Pannier Market Refurbishment Works
Bideford wheel park facility
Bideford Wheel Park Facility
Supply, installation and commissioning of replacement heating system for torridge pool
The existing 12 (no.) 50 kW Concord mains gas boilers are nearing end of their useful life and require replacing. The overall aim is to provide a return on the Authority's investme
Planned maintenance holsworthy manor offices
Planned maintenance including general building repairs, carpentry & joinery repairs, masonry repairs, rainwater goods repairs, glazing, painting and other decoration and other work
Toll hut & fencing works, northam burrows
Construction of Toll Hut, removal of existing, road surfacing/construction, fencing and timber walkway on Northam Burrows
The provision of split body collection vehicles
Torridge District Council requires a mixture of split body Refuse Collection Vehicles, to be used in providing the Kerbside recycling service. Split bodies are required as there is
Car park resurfacing works
Resurfacing of white lining of car parks at Odun Rd, Appledore, West Appledore, white lining of Main Car park Westward Ho! and resurfacing and lining of access road off School Lane
Reprocessing recyclable material
Reprocessing Recyclable Material