Buyer profile
The Hillingdon Hospitals NHS Foundation Trust
Get alerts when The Hillingdon Hospitals NHS Foundation Trust publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
64
Known spend
£77m
60 disclosed
Average value
£1m
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
Carmelcrest Ltd
2 winslatest 28 Aug 2026£3m
- 2
OCS HEATING AND GAS LIMITED
£975,000
- 3
Eze Lifts
£285,000
- 4
AIRISQ LIMITED
2 winslatest 28 Aug 2026£98,613
- 5
Baxter
£9m
- 6
Hats Group Ltd
1 winlatest 18 Sept 2025£6m
- 7
BURREN AND WHITAKER CONSTRUCTION LTD
1 winlatest 13 Jul 2026£2m
- 8
LAING O'ROURKE DELIVERY LIMITED
1 winlatest 30 Jul 2026£2m
- 9
Cuffe plc
1 winlatest 02 Jun 2026£2m
- 10
STANDARD FUEL OILS LIMITED
1 winlatest 08 Jun 2026£1m
What they buy
By CPV categoryArchitectural & engineeringCPV 71
13 contracts · £2m
Health & social workCPV 85
4 contracts · £7m
Construction worksCPV 45
3 contracts · £15m
SoftwareCPV 48
2 contracts · £2m
IT servicesCPV 72
2 contracts · £1m
Repair & maintenanceCPV 50
2 contracts · £317,995
Transport servicesCPV 60
2 contracts
Petroleum & energyCPV 09
1 contract · £1m
Renewal radar
Awarded contracts predicted to come up for re-tender in the next 18 months
- Contract Administrator to support the ED Refurbishment Project at the Hillingdon Hospital NHS Foundation Trust
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by May 2027).
May 2027
40% confident
- New Hospital Programme - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract for Hillingdon Hospital Redevelopment
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by Jun 2027).
Jun 2027
40% confident
Tender activity
Notices published per month — last 24 months
All contracts (64)
–Critical ventilation verification services
Critical ventilation verification and isolation room certification services in line with HTM03 requirements
Hillingdon hospital - supply of emergency oil
Supply of oil for heating purpose across hospital
Contractor appointment for the emergency department improvements at hillingdon hospitals NHS foundation trust
The works comprise light refurbishment, reconfiguration and ‘light’ anti-ligature specification to various rooms and waiting areas within the Emergency Department at Hillingdon Hos
Luna rova support and service
Luna Rova pathway transactions, Enterprise Data model, validations and service and support
OEM LV equipment 3 yearly service
the Trust is required to maintain these devices periodically in line with the manufacturer's recommendations to ensure compliance.
EV charging infrastructure – SLA & back office renewal
multi-year maintenance and back-office services in support of the Trust’s EV charging infrastructure.
THH - reactive repairs & remedial works - mechanical & plumbing systems
Reactive Repairs & Remedial Works contract (Heating, Hot Water, Cold Water, Drainage & General Plumbing Systems).
Security officer provision
operational need for ongoing security cove
NWLPS‑STW25/26‑2625 – fire alarm & fire damper maintenance and compliance works
maintain continuity of essential life‑safety systems. The works are critical to ensure compliance and prevent failure of fire alarm and fire damper systems
– EPOS tills for retail areas
mplementation of upgraded EPOS tills to replace obsolete systems and integrate with the Trust’s digital catering platform, enabling centralised stock control, recipe management, an
– Authorising engineer (ventilation) services
continuity of Authorising Engineer services before the current AE retires, and because the same supplier (IOM) is already used by Chelsea & Westminster, ensuring consistency and av
THH - temporary boiler fuel
Emergency supply of oil for boiler
THH - lift reactive works
Reactive works for the lifts at all sites for Hillingdon Hospital
THH - boiler remedial works
Boilers remedial works for the Hillingdon Hospital
THH - boiler maintenance
Repair and maintenance services of central heating Boiler Maintenance and Reactive Repairs
THH - plantroom upgrade
Appointment of a provider for Mount Vernon Hospital AOS Plantroom Calorifier Upgrade at The Hillingdon Hospitals NHS Foundation Trust.
The tudor centre
Extension of a 1980s outpatients building to form a new circa 650sqm extension over two storeys for the Education & Training department. Includes two simulation suites, teaching sp
Temporary car park
Provision of a new circa 400 space offsite car park for the use of Hillingdon Hospital staff, through the development of an existing greenbelt site which currently houses disused c
HVLV phase 2
Diversions to allow the current HV Substation building to be demolished. Provision of a new building housing replacement electrical HV/LV substation and backup generator and associ
Services diversion & demolition
Services diversions to support the demolition of the 17 buildings within the construction boundary for the New Hillingdon Hospital and the phased demolition of these. Construction