What they buy
By CPV categoryConstruction worksCPV 45
4 contracts · £287,192
Chemical productsCPV 24
2 contracts · £750,000
Petroleum & energyCPV 09
1 contract · £500,000
Petroleum & gas servicesCPV 76
1 contract · £100,000
Architectural & engineeringCPV 71
1 contract · £100,000
Electrical equipmentCPV 31
1 contract · £100,000
Tender activity
Notices published per month — last 24 months
All contracts (26)
OPA T881 - OFD thanckes environmental investigations (MINI tender using OPA T426 PSF LOT 8)
The purpose of this scope of works (SoW) by the Oil and Pipelines Agency (OPA) is to support a Site Investigation from the findings of the 2023 John Grimes Monitoring Report compri
OPA T899 OFTD finnart tanks 707, 709,711 inspection works
OFD Finnart (or Finnart Ocean Terminal) Tank 707, Tank 709 and Tank 711 initial roof inspection, enabling works, cleaning, gas freeing, full inspection, reporting and compiling a f
OPA/T903 service level agreement for industrial measurement and controls systems.
Three year Service Level Agreement for Industrial Measurement and Controls Systems installed at all MOD Oil & Fuel Storage Locations..
OPA/T903 service level agreement for industrial measurement and controls systems.
Service Level Agreement for Industrial Measurement and Controls Systems for MOD Fuel & Oil Storage sites both in the UK and Overseas.
OPA/T872 gosport jetty AMP - fire system
Design of Fire System on Jetty at OFD Gosport.
OPA/T871 gosport jetty AMP - south jetty head (design).
Design of Marine Construction Works (Engineering Works & Construction Works)
OPA/T869 plumley - pipeline inspection.
Pipeline Inspection for cavern storage site
OPA/T870 plumley - COGH site restoration.
To restore location following completion of Oil extraction.
OPA/T868 plumley strategy 2 - EPC
Design and Build Contract for underground storage caverns.
OPA/T867 plumley - brine supply.
Supply of Brine to Plumley Location via Pipeline
OPA/T866 plumley - brine & oil haulage.
Removal of Oil from Site Location and transport to Refinery and replace with Brine.
OPA/T865 gibraltar - kings lines strategic fuel hub - EPC.
Structural Steel Erection Services; Tank Construction and Servicing.
OPA/T864 gosport jetty AMP - landside civils(build).
Jetty AMP - Landside Civils. Marine Construction Services
Gb-thanckes: OPA/T856 supply a service to supply F76 fuel filtering/polishing - thanckes
OPA require to appoint an appropriate contractor to conduct Filtering/Polishing of F76 fuel stored at OFD Thanckes. OPA require the filtering/polishing of the F76 that has failed t
Gb-plymouth: OPA T848 OFD thanckes EICR (electrical installation condition report)
Carry out OPA T848 OFD Thanckes EICR (Electrical Installation Condition Report)
Gb-plymouth: OPA T827 OFD thanckes, out of service inspection of 3 off nato tanks (T29, T30, T33)
OPA T827. To carry out Non-Destructive Testing (NDT) in tanks 029, 30,33 located at Thanckes in accordance with the OPA - Storage Tank Out of Service Inspection document OPA-ST-510
Gb-plumley: OPA/T823 - wireline services
The Oil & Pipelines Agency (OPA) invites you to submit a price for the works described in the accompanying works package documentation for Wireline Surveys
OPA/T786 demolition of BFI 3 at RNAS yeovilton
To carry out demolition of BFI 3 at RNAS Yeovilton to resolve legacy environmental issues and prepare the site for future redevelopment. This project involves the complete removal
OPA T826 OFD thanckes, four off nato tanks cleaning
OPA T826 OFD Thanckes, four off Nato Tanks initial pre-inspection cleaning and post repair final clean For more information about this opportunity, please visit the Delta eSourcing
OPA/T779 loch striven geotechnical groundworks investigation (pre-qualification questionnaire)
The project objective is to provide soil and rock properties in the vicinity of the existing structures to enable the following work to be carried out by the OPA. The OPA requires