Buyer profile
North Devon District Council
Get alerts when North Devon District Council publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
236
Known spend
£223m
231 disclosed
Average value
£964,315
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
Grills Renovations and Refurbishments Ltd
3 winslatest 05 Oct 2026£2m
- 2
FREEDOM COMMUNITY ALLIANCE LIMITED
£338,890
- 3
NATIONAL PARKING PLATFORM LIMITED
£1m
- 4
Encompass Southwest
2 winslatest 17 Jun 2026£220,000
- 5
PENINSULA ACCESS LTD.
£119,293
- 6
Standard Fuel Oils Ltd
£3m
- 7
Protector Insurance UK Ltd
1 winlatest 14 Apr 2025£992,550
- 8
Grills Renovations and Refurbishments Ld
1 winlatest 17 Sept 2026£531,569
- 9
Worldpay (UK) Ltd
1 winlatest 23 Apr 2025£247,786
- 10
CONSTRUCTING CO UK LIMITED
£232,430
What they buy
By CPV categoryConstruction worksCPV 45
37 contracts · £14m
SoftwareCPV 48
22 contracts · £3m
Architectural & engineeringCPV 71
16 contracts · £873,487
Transport equipmentCPV 34
12 contracts · £6m
Health & social workCPV 85
10 contracts · £397,621
Recreation, culture & sportCPV 92
9 contracts · £69m
Business servicesCPV 79
9 contracts · £2m
Construction materialsCPV 44
7 contracts · £433,964
Renewal radar
Awarded contracts predicted to come up for re-tender in the next 18 months
- NDC0104-26 - Provision of Civil Parking Enforcement Systems
Predicted using median duration of UK contracts in the same CPV division (12 months from contract start date → renewal expected by Aug 2027).
Aug 2027
40% confident
Tender activity
Notices published per month — last 24 months
All contracts (236)
NDC0082-26 - cultural assets commission consultants
The provision of consultant services to gain a better understanding of the cultural and creative assets within Devon and their importance to the local communities, the cultural inf
NDC0080-26 - vulnerability scanning software
Vulnerability Scanning Software
Homelessness, prevention and advice system
Homelessness, Prevention and Advice ICT System
NDC0071-26 - silver gallery display units
The construction, delivery and installation of high security display cabinets (to GIS standards) for The Museum of Barnstaple and North Devon's new gallery space for the display an
Marine package insurance
NDC0084-26 - Marine Package Insurance
NDC0043-25 -supply and fit of diesel fuel tank and dispenser
Supply and fit of Diesel Fuel Tank and Dispenser and associated works at Ilfracombe Harbour
NDC0064-25 - fremington quay sheet pile wall (revised)
Removal of existing Reinforced Concrete retaining wall and adjacent failing stone masonry wall and the construction of 46.4 m sheet pile wall on the northern end section.
Rough sleeper assertive outreach / in-reach officer
Provision of Rough Sleeper Assertive Outreach / In-Reach Officer
Rough sleeper temporary accommodation
Provision of Rough Sleeper Temporary Accommodation
Housing first accommodation support
Provision of Housing First Accommodation Support
NDC0079-26 cove harbour wall repair works
Repair works to the stone masonry wall at south quay (Cove), Ilfracombe
NDC0054-25 - oxford grove CP retaining walls
The repair of two retaining walls to include the regrading of one retained slope and the underpinning of one wall. To include the installation of new fencing and barriers to both w
Provision of flexible accommodation
Provision of Flexible Accommodation for the Rough Sleeper Service
NDC0078-26 - decarbonisation works at brynsworthy environment centre (BEC)
Replacement of the existing heat generation equipment and associated works at Brynsworthy Environment Centre.
Welfare support outreach and in-reach officer
Welfare Support Outreach and In-Reach Officer attached to the Sleeper Service
NDC0086-26 - fair view car park, barnstaple - resurfacing works
NDC0086-26 - Fair View Car Park, Barnstaple - Resurfacing Works - Resurfacing of existing car park.
NDC0068-25 - lynmouth esplanade cliff stabilisation works
Repairs and maintenance to existing rockfall mitigation measures. Cutting back vegetation and scaling of loose rock from the cliff face. Installation of a new netting revetment to
NDC-0069-25 - lynbridge car park pre-demolition survey
A pre-demolition survey is to be carried out to establish a demolition management plan for controlled top-down dismantling of the carpark structure at Lynbridge
Fremington quay sheet pile wall
Removal of existing Reinforced Concrete retaining wall and adjacent failing stone masonry wall and the construction of approximately 53m sheet pile wall on the northern end section
NDC0031-25 - green lanes roofing repairs works
Rectification works to repair the leaks within the roof to Green Lanes shopping centre, Barnstaple, specifically to the previously named units Poundland and So Sweet, and the exist