Buyer profile
NHS PROPERTY SERVICES LIMITED
Get alerts when NHS PROPERTY SERVICES LIMITED publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
487
Known spend
£159m
449 disclosed
Average value
£354,427
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
AllHands Limited t/a Harrold-Jones Services
18 winslatest 05 May 2026£2m
- 2
Lawlors Limited
13 winslatest 08 Jun 2026£1m
- 3
Parogon Contracts Ltd
11 winslatest 03 Sept 2026£3m
- 4
Amspec Limited
11 winslatest 09 Oct 2026£2m
- 5
MJG Mechanical Services Limited
£6m
- 6
Acomb Construction Limited
9 winslatest 20 Aug 2026£3m
- 7
TJM Projects Limited
8 winslatest 21 Jul 2026£1m
- 8
Arthur Pollard Ltd
£1m
- 9
INTEGRAL ROOFING AND MAINTENANCE SERVICES LTD
7 winslatest 25 Sept 2026£2m
- 10
Rossair Limited
7 winslatest 14 Jul 2026£2m
What they buy
By CPV categoryArchitectural & engineeringCPV 71
17 contracts · £2m
Construction worksCPV 45
10 contracts · £1m
Repair & maintenanceCPV 50
9 contracts · £2m
Business servicesCPV 79
7 contracts · £49m
IT servicesCPV 72
5 contracts · £182,464
Sewage, refuse & cleaningCPV 90
4 contracts · £2m
Construction materialsCPV 44
4 contracts · £1m
Security & defenceCPV 35
4 contracts · £581,236
Renewal radar
Awarded contracts predicted to come up for re-tender in the next 18 months
- Professional construction consultancy services for Boiler replacement at Dartford East HC
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by May 2027).
May 2027
40% confident
- Professional construction consultancy services for Lift Replacement at Dartford
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by May 2027).
May 2027
40% confident
- Consultancy for Phase Two Hayman & Lanyon Structural Works & Fire Remedials Stages 5-7
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by May 2027).
May 2027
40% confident
- Edgware Plot A Demolition - Consultancy Services
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by May 2027).
May 2027
40% confident
Tender activity
Notices published per month — last 24 months
All contracts (487)
The oxford centre – internal refurbishment works
Internal alterations to allow vacant space to accommodate additional services at The Oxford Centre
Edgware main building WC refurbishment
Contract for Edgware Main Building WC Refurbishment
CCTV upgrade works at south ockendon health centre
CCTV Upgrade Works at South Ockendon Health Centre. Removal of the existing and design, supply and installation of the new CCTV system including final cable sizes, routes and the f
CCTV upgrades to purfleet health centre
Replacement CCTV system across site and external at Purfleet Health Centre
Supply and delivery of lenovo thinkcentre thin client devices
Supply and Delivery of Lenovo ThinkCentre Thin Client Devices for NHSPS
Replacement of heating system pipework at great hollands health centre
Contract for Replacement of Heating System Pipework at Great Hollands Health Centre
Seven kings health centre - replacement boiler and pipework
Replacement Boiler and Pipework - M&E work at Seven Kings Health Centre
Frank lloyd ground floor refurbishment
Internal refurbishment of Frank Lloyd Building, Sittingbourne Hospital, Kent
Replacement fire alarm system
Replacement Fire Alarm System UREACTIVE26_M
Upgrade works to the first floor kitchen and flooring. also replacement flooring works in the ground floor reception area
Upgrade works to the First floor kitchen and flooring. Also replacement flooring works in the ground floor reception area at Geoffrey Street HC
Polesworth health centre - reconfiguration of existing rooms
Contract for Polesworth Health Centre - Reconfiguration of existing rooms
Hawthorn development electricity northwest electrical connection, diversion work
Contract for the diversion work, Hawthorn Development Electricity Northwest Electrical Connection,
Elmhurst nurse call at elmhurst intermediate care centre
Replacement nurse call system Making good and builders work in association
Air conditioning works
The Greenwich Centre – Air Conditioning works
Ceilings and decoration at crawley hospital
Ceilings and decoration at Crawley Hospital - Green Wing
Decorating & flooring services for leatherhead hospital and leatherhead clinic
Decorating & Flooring services for Leatherhead Hospital and Leatherhead Clinic Refurb
Edgware hospital reception refurbishment
Contract for the reception refurbishment at Edgware Hospital
Flat roof replacement with new PV unit installation wembley
Flat Roof Replacement with New PV Unit Installation Wembley Practice
Reconfiguration of five existing rooms to provide consult room accommodation
Reconfiguration of five existing rooms to provide Consult Room accommodation - UUMF_260013
Boiler replacement and boiler room upgrade
Boiler Replacement and Boiler Room Upgrade at Oxlow Lane Health Centre