Buyer profile
Natural England
Get alerts when Natural England publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
289
Known spend
£36m
277 disclosed
Average value
£130,287
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
AXION SOLUTIONS LTD
£107,041
- 2
ABPmer
4 winslatest 25 Aug 2026£268,235
- 3
APEM
£487,841
- 4
Jeremy Benn Associates Limited (t/a JBA Consulting)
3 winslatest 15 Jun 2026£374,402
- 5
UK CENTRE FOR ECOLOGY & HYDROLOGY
£174,491
- 6
FGS Pilcher LTD
3 winslatest 10 Sept 2026£127,320
- 7
ENVISION MARINE LTD.
£103,135
- 8
JAMES HUTTON LIMITED
£88,943
- 9
GAME AND WILDLIFE CONSERVATION TRUST
£35,912
- 10
Freshwater Habitats Trust
2 winslatest 06 Oct 2026£374,255
What they buy
By CPV categoryEducation & trainingCPV 80
5 contracts · £170,500
Business servicesCPV 79
4 contracts · £374,584
Sewage, refuse & cleaningCPV 90
2 contracts · £165,860
Construction worksCPV 45
1 contract · £270,640
Financial & insuranceCPV 66
1 contract · £133,874
Architectural & engineeringCPV 71
1 contract0
Renewal radar
Awarded contracts predicted to come up for re-tender in the next 18 months
- Alde-Ore Estuary SSSI and North Norfolk Coast SSSI
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by Apr 2027).
Apr 2027
40% confident
- North Walney Project - NEC4 PSC (Pagabo) - RIBA Stages 4-6
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by Apr 2027).
Apr 2027
40% confident
- Saltmarsh surveys of 2 SSSIs - Alde-Ore Estuary SSSI and North Norfolk Coast SSSI
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by Apr 2027).
Apr 2027
40% confident
- ETAFFCSFS&E10 - One-to-one Advice June 2026 to November 2026
Predicted using median duration of UK contracts in the same CPV division (15 months from contract start date → renewal expected by Sep 2027).
Sept 2027
40% confident
Tender activity
Notices published per month — last 24 months
All contracts (289)
Developing human-wildlife conflict and coexistence guidelines for the UK
To develop and carry out research that examines the suitability and applicability of IUCN guidance for managing human-wildlife conflict and promoting coexistence in the UK, informe
Goss and tregoss historic impact and opportunity scoping assessment'
This contract is for a Historic Impact and Opportunity Scoping Assessment (HIOSA) of the Goss and Tregogn Moors. It is aimed at firms that can produce a heritage narrative, identify management opportunities, assess archaeological sensitivities and deliver GIS‑based maps and data.
Moss side farm moss side field restoration 2026
Peatland restoration works on lowland ex arable land.
Exploring the appeal of 30by30 for landowners/managers
Please note the budget is for £45,000 exclusive of vat. The project will run until the end of March 2027. The overall aim of this qualitative social science research project is to
Water pipe installation at aston rowant NNR
To install sections of water pipe at Aston Rowant National Nature Reserve, to be installed in October 2026.
Analysis of soil samples for natural england's long term monitoring network 2026-2027
This contract comprises laboratory analysis of soil samples collected from four of Natural England's Long Term Monitoring sites. Analyses required include a range of physio-chemica
New ryetec contractor flail mower collector C2200CHS super
1. New - Ryetec Contractor Flail Mower Collector - C2200CHS Super Including the following options: 1.1. Front feeder plate 1.2. Volume reduction bar 2. PTO shaft and guard 3. The m
Undercliffs NNR humble glades holm oak felling
The contractor is required to carry out safe felling and removal of all spray marked trees in the project area, the Humble Glades. This is the equivalent of approximately 80 medium
Supply of 14ft livestock trailer
The supply of 14ft Livestock Trailer.
Security fencing - thorne moors
Supply and Install 134m of Paladin Fencing and vehicle gates on Thorne Moors, Humberhead Peatlands NNR.
Climate change adaptation monitoring for ELM schemes
This project aims to develop a robust monitoring and evaluation (M&E) framework for assessing how Environmental Land Management (ELM) schemes (Sustainable Farming Incentive (SFI),
Provision of advice and information services on relevant global and EU policy developments on agriculture and related environment policies and nature conservation matters
Provision of Advice and Information Services to the UK Network of Conservation and Environment Agencies (Land Use Policy Group, LUPG) on relevant Global and EU policy developments
Stodmarsh ditch restoration with associated bund creation and culvert creation
Excavator works in reedbeds to carry out; culvert instillation, ditch restoration and tracking in route creation.
Excavator mounted forestry mulcher
Supply of excavator mounted forestry mulcher
Ecohydrological survey and hydrological restoration plan at roudsea wood and mosses NNR - 2026/2027
This study is funded by and contributes toward the Species Recovery Programme - Raised Bog Lagg Restoration Boosting Species Recovery project. The four species that project address
Durham coast SSSI condition assessment of the non-breeding bird assemblage
The survey will collect data on the abundance and distribution non-breeding waterbirds on Durham Coast, in particular Purple Sandpiper (Calidris maritima), Sanderling (Calidris alb
Purchase of attachments for kubota KX060-5 excavator
All attachments to be compatible with Kubota KX060-5 running bio hydraulic oil. • Tiltrotator hitch (plus mounting bracket for Exac-1 Tree Lopper) • Auger drive with 6" earth drive
Etaff AESW03
Countryside Stewardship Higher Tier Advice Programme 2026/27: Online Events
Etaff AES&E03
Countryside Stewardship Higher Tier Advice Programme 2026/27: Online Events
Etaff AEMidlands03
Countryside Stewardship Higher Tier Advice Programme 2026/27: Online Events