Buyer profile
Kirklees Council
Get alerts when Kirklees Council publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
644
Known spend
£843m
576 disclosed
Average value
£1m
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
Allerton Damp Proofing
3 winslatest 26 Aug 2026£78,653
- 2
The Open University
2 winslatest 30 Jan 2026£102,000
- 3
Change, Grow, Live
1 winlatest 12 Mar 2025£57m
- 4
Amethyst Care & Support Group,Assist Homecare,AV Support 247 Limited,Care Angels Batley Ltd,Catholic Care (Diocese of Leeds),Home Group Ltd,Our TLC Limited,The Riverside Group Ltd
1 winlatest 31 Mar 2026£1m
- 5
Access UK Limited
1 winlatest 24 Sept 2026£1m
- 6
Powred Heating Components Limited t/a PHC
1 winlatest 21 Aug 2026£1m
- 7
Apex Pathway,Dreamss,HSS Homes,Independent Living Project,Northern Community Pathways,Restorative Social Care Services,Strive To Be Independent
1 winlatest 31 Dec 2024£1m
- 8
Govtech Solutions Ltd
1 winlatest 24 Mar 2026£830,250
- 9
Apex Pathway,Dreamss,HSS Homes,Independent Living Project,Restorative Social Care Services,Strive To Be Independent,Inicio Group Ltd
1 winlatest 31 Mar 2026£656,643
- 10
WASTE MANAGEMENT MAINTENANCE LIMITED
£498,995
What they buy
By CPV categoryConstruction worksCPV 45
164 contracts · £151m
Health & social workCPV 85
83 contracts · £441m
Education & trainingCPV 80
42 contracts · £7m
Construction materialsCPV 44
41 contracts · £7m
Architectural & engineeringCPV 71
40 contracts · £29m
Transport equipmentCPV 34
39 contracts · £33m
IT servicesCPV 72
34 contracts · £9m
Business servicesCPV 79
29 contracts · £68m
Renewal radar
Awarded contracts predicted to come up for re-tender in the next 18 months
- Firthcliffe Recreation Ground
Predicted using median duration of UK contracts in the same CPV division (4 months from contract start date → renewal expected by Oct 2026).
Oct 2026
40% confident
- Town Estate & Spring Bank Estate - Phase 2
Predicted using median duration of past contracts from this buyer in the same CPV division (2 months from contract start date → renewal expected by Nov 2026).
Nov 2026
60% confident
- GOMERSAL PRIMARY SCHOOL - BOILER PLANT REPLACEMENT
Predicted using median duration of UK contracts in the same CPV division (6 months from contract start date → renewal expected by Jan 2027).
Jan 2027
40% confident
- Requirement for Canopies
Predicted using median duration of UK contracts in the same CPV division (7 months from contract start date → renewal expected by Apr 2027).
Apr 2027
40% confident
- Social Worker Integrated Degree
Predicted using median duration of UK contracts in the same CPV division (16 months from contract start date → renewal expected by Jun 2027).
Jun 2027
40% confident
- Social Worker Integrated Degree
Predicted using median duration of UK contracts in the same CPV division (16 months from contract start date → renewal expected by Jun 2027).
Jun 2027
40% confident
- Structural Engineering Consultancy & Associated Services for Civic Centre 1 Piazza Refurbishment
Predicted using median duration of UK contracts in the same CPV division (11 months from contract start date → renewal expected by Jun 2027).
Jun 2027
40% confident
- RAVENSTHORPE CE (VC) JUNIOR SCHOOL - ROOF & BUILDING WORKS & INTERNAL REPAIRS
Predicted using median duration of UK contracts in the same CPV division (17 months from contract start date → renewal expected by Dec 2027).
Dec 2027
40% confident
Tender activity
Notices published per month — last 24 months
All contracts (644)
Local integrated partnerships (LIPS)
Client management database system that meets the needs for the whole service.
KMCPRP-142 buxton house concrete facade repairs
The works involve repairs to concrete facades on Buxton House located in Huddersfield Town Centre. Buxton House is a multi-storey tower block fronting on to New Street. The block i
IR790808A - 172 wakefield ROAD, huddersfield - fabric enhancement works
Fabric enhancement works to No 172 Wakefield Road, Huddersfield. Property directly abuts major highway and public footpath.
AM970349 - hyrstmount junior school - lighting replacement
Replacement of lighting installation in extension, including emergency lighting and automatic controls. Includes replacement of some suspended ceilings.
AM870351 - eastborough JI & N school - replacement lighting & FIRE alarm
Replacement of lighting and fire alarm installations throughout school including emergency lighting and automatic lighting controls. Includes replacement of some suspended ceilings
KMCAS-134 carers' breaks
Kirklees Council ("the Council") wishes to commission a service to provide Carers' Breaks and Emergency Carers Breaks within the Kirklees area. This will be achieved by the provisi
KMCEGS-105 spenborough new pool development: new footpath and boundary fence
New footpath and boundary fence.
AM970424 - crossley fields J&I school - replacement OF convector radiators
Replacement of approximately 14 radiators and 2 fan convectors to several areas of the school, with localised modifications to suit. New emitters to be low surface temperature and
AM970428 - hopton primary school - partial heating replacement
Phase 1 of a phase 2 scheme and covers approximately half of the existing building. Works include the removal of existing heat emitters, with the installation of new low surface te
AM970434 - SHAW cross I & N school - partial heating replacement
Replacement of the existing steel panel radiators throughout the school, with new low surface temperature alternatives. Minimal heating pipework replacement, with localised modific
AM970435 - spring grove JI & N school - heating distribution replacement - phase 2
Phase 2 of a phase 2 scheme and covers half of the existing building. Works include the removal of existing heat emitters and heating distribution pipework, with the installation o
AM970432 - paddock JI & N school - heating distribution replacement - phase 1
Removal of heat emitters and heating distribution pipework to several areas within the Infant school along with the installation of new panel radiators and new replacement pipework
AM970425 - CROW LANE primary & foundation stage school - partial heating replacement
Removal of the existing mechanical services and the installation of new radiators, steel pipework, fittings, valves, insulation, controls modifications, electrical works, builders
AM970345 - crowlees J & I school - replacement lighting
Relighting of 1990's extension.
AM970350 - nields JI & N school - lighting & ceiling repair works
New lighting to 5 classrooms, admin office, nursery and wc areas. New suspended ceiling to above areas. Ceiling repairs to original ceilings above suspended ceilings.
EI970255 - mayman LANE depot, batley - demolition works
Demolition of multi-bay single two-storey stores and welfare building down to ground level. Traditional brickwork construction with truss rafter roofs. Retain perimeter retaining w
AM970433 - purlwell I & N school - heating distribution replacement - phase 1
Phase 1 of a phase 2 scheme and covers approximately half of the existing building. Works include the removal of existing heat emitters, with the installation of new low surface te
CDT970437 - spenborough POOL - asbestos removal & demolition
The work shall include for the planned and controlled licensed asbestos removal followed by the safe, organised top down demolition of all identified building/superstructure/substr
AM870381 - ashbrow primary school - electrical rewire - phase 1
Electrical rewire of Key Stage 1 building including renewal of suspended ceilings, fire alarm and security system.
KAL200082 - dewsbury sports centre - wetside changing ROOM refurbishment
Refurbishment of main changing area with works to floors, walls, cubicles, lockers and lighting. Full refurbishment of male, female toilet and shower area include walls, floors cub