By CPV categoryConstruction worksCPV 45
3 contracts · £5m
Construction materialsCPV 44
3 contracts · £1m
Tender activity
Notices published per month — last 24 months
All contracts (6)
Manchester international airport - shotcrete works
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no
Manchester international airport - OLE phase 3 works
This contract is for specialist overhead line equipment (OLE) work to remodel Manchester Airport railway station, adding or extending platforms and possibly a new turnback facility so longer trains can be accommodated. It is aimed at firms with railway OLE expertise, working under Network Rail and Transport for the North standards.
Manchester international airport - demolition works
This contract is for demolition and structural works at Manchester Airport railway station to create extra platform capacity for longer trains. It involves removing a bridge, track protection, pavement, and various concrete and steel elements, and must be carried out safely within a live rail environment.
Manchester international airport - permanent way works
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no
Manchester international airport - steel parapet bridge fascia
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no
Manchester international airport - precast concrete beams