Buyer profile
HAMPSHIRE COUNTY COUNCIL
Get alerts when HAMPSHIRE COUNTY COUNCIL publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
1,293
Known spend
£54bn
1139 disclosed
Average value
£47m
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
VDL Southern Limited
11 winslatest 19 Aug 2026£970,778
- 2
B & M CLARK (BUILDERS) LIMITED
£950,059
- 3
Rocon Contractors Limited
10 winslatest 18 May 2026£701,623
- 4
CEI ELECTRICAL SERVICES LTD
£776,284
- 5
T COLEBORN AND SON LIMITED
£929,700
- 6
SIMER ENVIRONMENTAL SERVICES LIMITED
£648,796
- 7
MKG BUILDING SERVICES LTD
£542,227
- 8
BRIGHTER FUTURES FOSTER CARE LTD
£206m
- 9
FIVE RIVERS CHILD CARE LIMITED
£204m
- 10
TEW BROTHERS LIMITED
£613,703
What they buy
By CPV categoryHealth & social workCPV 85
255 contracts · £10bn
Construction worksCPV 45
93 contracts · £15bn
Business servicesCPV 79
69 contracts · £76m
SoftwareCPV 48
63 contracts · £140m
Education & trainingCPV 80
53 contracts · £85m
Architectural & engineeringCPV 71
49 contracts · £2bn
Financial & insuranceCPV 66
42 contracts · £805m
IT servicesCPV 72
30 contracts · £143m
Renewal radar
Awarded contracts predicted to come up for re-tender in the next 18 months
- PCI_LotA_185 North Hampshire Transport Model
Predicted using median duration of past contracts from this buyer in the same CPV division (9 months from contract start date → renewal expected by Nov 2026).
Nov 2026
60% confident
- PCI_LotB1_182 Southleigh Modelling Review
Predicted using median duration of past contracts from this buyer in the same CPV division (9 months from contract start date → renewal expected by Nov 2026).
Nov 2026
60% confident
- PCI_LotB4_186 Whitehill and Bordon Relief Road - Air Quality Monitoring 2025
Predicted using median duration of past contracts from this buyer in the same CPV division (9 months from contract start date → renewal expected by Nov 2026).
Nov 2026
60% confident
- PCI_LotA_188 A326 LLM Planning Consultation Support Services
Predicted using median duration of past contracts from this buyer in the same CPV division (9 months from contract start date → renewal expected by Dec 2026).
Dec 2026
60% confident
- PCI_LotA_190 Botley Bypass Bridge Design Completion, Beam Installation and Deck
Predicted using median duration of past contracts from this buyer in the same CPV division (9 months from contract start date → renewal expected by Dec 2026).
Dec 2026
60% confident
- PCI_LotA_169 Whitehill Bordon: Station Road Crossroads & Adjacent Shared Use Path
Predicted using median duration of past contracts from this buyer in the same CPV division (9 months from contract start date → renewal expected by Dec 2026).
Dec 2026
60% confident
- PCI_LotB1_183 Active Travel Training Sessions
Predicted using median duration of past contracts from this buyer in the same CPV division (9 months from contract start date → renewal expected by Jan 2027).
Jan 2027
60% confident
- PCI_LotA_187 Four Marks and Medstead Junction VISSIM Model - Access, Procedure and Managing Commissions
Predicted using median duration of past contracts from this buyer in the same CPV division (9 months from contract start date → renewal expected by Jan 2027).
Jan 2027
60% confident
Tender activity
Notices published per month — last 24 months
All contracts (1293)
Brockhurst primary school, rowner infant school - toilet refurbishment
Full WC refurbishment at 2no sites. Removal of all sanitaryware, vinyl, basins etc and replacement with new as per HCC specification.
Baycroft school - DT classroom alterations
Removal of partition wall, as well as the associated, water, gas and electrical supply serving adjacent sink, oven and sockets. Removal of a number of fixed kitchen base units and
Crofton anne dale junior school - SEND RP
The project is to provide a Resource Provision at a Junior School for SEND pupils. The project is to carry out internal alterations to provide a Resource Provision Classroom, 1:1 C
Hamble primary school - SEND RP
The project is to create a new Resource Provision for SEND pupils. The project is to carry out internal alterations of an existing double modular classroom. Internally, there will
Portchester community school distribution and wiring upgrades
Electrical distribution board replacement including fire repair works
Calshot activity centre - auto door works
- Removal of existing internal non-compliant automatic sliding doors from the main entrance lobby of Sunderland Hangar including subsequent making good. or: - Replacement of existi
Oakwood infant school - chimney repairs
General repointing, Helibar installation and minor repairs to 4 no. chimneys. Access at height required.
Trosnant infant and junior schools - hall floor upgrade
Works to include the removal and replacement of the existing hall floor and servery floor (including floor structure and surface) at Trosnant Infant/Junior School.
Bramley CE (C) primary school - internal remodelling plus extension
1-storey single classroom and corridor extension to existing teaching block with associated external works, including an external terrace with canopy, steps, fencing and reconfigur
Brookfield community school - replace underground heating pipework
Replace existing underground pipework between boiler room and school block B. Isolate and disconnect existing pipework to school block B Create new trench between plantroom and blo
Farnborough library - LED lighting and solar PV
The scope of works include the like-for-like upgrade of obsolete fluorescent luminaires and additional wiring to serve new emergency lighting. The works also include the installati
St thomas more RC (va) primary school, wallisdean infant school - external ramp to Y1 classroom
Providing accessible entrances to 2no classrooms to St Thomas More and Wallisdean Infant Schools. Changes to paving / areas of tarmac to regrade entrances to 1:21 Minor associated
Stubbington study centre, repairs to water main and supply room 27
Install a new water supply from the boiler room (Room 34, Building 004A) to reconnect the kitchen sink in Room 27. The proposed route is to exit the building near the boiler ventil
Applemore college - asbestos repairs
Removal of and encapsulation of Asbestos containing materials.
Rachel madocks school - ventilation upgrade
Replacement of Hydropool AHU for new Dantherm AHU (quote attached for information only). Minor modification to pipework within plantroom. Works during school summer holiday.
Vyne community school window upgrade
Window and Door replacement project: Vyne Community School. Design: Some contractor design elements
Springwood infant school ventilation improvements
Installation of 3no new wall mounted comfort cooling units to the existing School Hall + 1no external unit, along with the installation of new 2no high level de-strat fans. All ass
Stubbington study centre structural roof repairs
To affect structural repairs to timber framed building. Installation of fabricated steelwork and associated structural timber framing.
Workshop tools & equipment maintenance, repairs and installations framework
Hampshire County Council (HCC) require servicing of their workshop equipment and tools, to support the servicing and maintenance of their vehicle fleets. This Framework covers the
Contract for the design build and operation of extra-care housing at dunsbury way, havant
Hampshire’s older persons’ population is projected to increase by 56% between 2020 and 2035, from 153,000 to 239,000. Within Havant, the numbers are forecast to increase by 53% dur